Participants: Sean Adkins, Brian Bauman, Jim Bell, Antonin Bouchez, Matthew Britton, Jason Chin, Richard Dekany, Ralf Flicker, Don Gavel, Chris Neyman, Gustavo Rahmer ...
SSC Meeting on June 21, 2006 (Waimea, HI) Call in number 1 877 280 4645; Passcode (room number) 109022 Next Generation Adaptive Optics (All times are in HST 3 ...
NGAO Team Meeting #1 Directions: http://www.physics.uci.edu/~barth/ksm2006/NGAOdirections.html Status of Action Items from Meeting #1 as of 9/20/06: Action Items ...
Keck NGAO Team Meeting #2 8:30a 5:30p Tuesday, November 14, 2006 012 Robinson Laboratory, Caltech Directions: to Caltech (.html) and campus map (.pdf) In propria ...
Telecon 11/10/06 Attendees: Jessica, Claire, Chris, Rich, Matthew and Brian Identify two goals for this project Technical report describing key factors for better ...
Keck NGAO Team Meeting #2 8:30a 5:30p Tuesday, November 14, 2006 012 Robinson Laboratory, Caltech (moved to 023) Telecon attendees: 877 280 4645 passcode 540030 ...
07 Dec. 2006 Observing efficiency Meeting notes Agenda: Quick intro on the NGAO and background info for this meeting Introduce WBS for Observing Efficiency ...
Keck NGAO Team Meeting #3 9:50a 2:30p PST Wednesday, December 13, 2006 Tele/Videoconference Dial in Number: 977 280 4645 Passcode: 540030 Videoconference ...
Keck NGAO Wavefront Error and Encircled Energy Budget IPT Meeting 10:30a Noon PST Wednesday, January 3, 2007 Dial In Information: Toll free: 888 387 8686 ...
Keck NGAO WFE and EE Error Budget Tools Review 9:30a 4:30p PST Tuesday, January 16, 2007 012 Robinson Laboratory Attendees: Dekany, Flicker, Gavel, Max, Neyman ...
Keck NGAO Team Meeting #4 8:00a 5:30p (Hawaii Standard Time) Monday, January 22, 2007 Hualalai Conference Room, WMKO Headquarters, Waimea, HI Telecon attendees ...
Keck NGAO Team Meeting #5 9:50a 4:00p PST Wednesday, March 7, 2007 Tele/Videoconference Dial in Number: 877 280 4645 Passcode: 540030 Videoconference IP ...
Keck NGAO Team Meeting #6 9:00 a 6:00 p (Pacific Daylight Time) Wed, April 25 and Thurs, April 26, 2007 Center for Adaptive Optics, UC Santa Cruz Telecon attendees ...
WBS 3.1.3 Kickoff Meeting Meeting Materials NGAO Architecture Taxonomy.pdf: A shorthand nomenclature for discussion of potential NGAO architectures R. Dekany ...
Keck NGAO Team Meeting #7 11:00a 5:00p PST Wednesday, May 30, 2007 Tele/Videoconference Dial in Number: 877 280 4645 Passcode: 540030 Videoconference IP ...
070705 NGAO WBS 3.1.3 Meeting 10:00a 5:30p PDT Thursday, July 5, 2007 In person with Tele/Videoconference Dial in Number: 877 280 4645 Passcode: 540030 (only ...
Keck NGAO Team Meeting #8 9:00 a 6:00 p (Pacific Daylight Time) Mon, July 9 to Fri, July 13, 2007 Center for Adaptive Optics, UC Santa Cruz Telecon attendees ...
Keck NGAO Team Meeting #9 10:00a 3:30p PDT Friday, August 24, 2007 Tele/Videoconference Dial in Number: 877 280 4645 Passcode: 540030 Videoconference IP ...
Keck NGAO Team Meeting #10 8:00a 6:00p Monday, September 17, 2007 012 Robinson Laboratory, Caltech Telecon attendees: 877 280 4645 passcode 540030 (video status ...
Keck NGAO Team Meeting #9 10:00a 3:30p PDT Friday, August 24, 2007 Tele/Videoconference Dial in Number: 877 280 4645 Passcode: 540030 Videoconference IP ...
Keck NGAO Team Meeting #11 9:00a 6:00p PST (note change from PDT to PST on Nov. 4) 7:00a 4:00p HST Monday, November 5, 2007 Tele/Videoconference Dial in ...
Keck NGAO Team Meeting #12 10:00a 5:30p PST 8:00a 3:30p HST Thursday, December 13, 2007 Tele/Videoconference Dial in Number: 877 280 4645 Passcode: 540030 ...
Keck NGAO Team Meeting #13 10:00a 4:15p PST 8:00a 2:15p HST Friday, January 25, 2008 Tele/Videoconference Dial in Number: 877 280 4645 Passcode: 540030 ...
Keck NGAO Team Meeting #14 10:00a 3:00p PST (Tentative) 8:00a 1:00p HST (Tentative) Tuesday, February 19, 2008 Tele/Videoconference Dial in Number: 877 280 ...
Keck NGAO PD Team Meeting #1 12:00p 3:00p PST 9:00a 12:00p HST Friday, June 13, 2008 Tele/Videoconference Dial in Number: 877 280 4645 Passcode: 540030 Videoconference ...
Keck NGAO PD Team Meeting #2 12:00p 3:00p PST 9:00a 12:00p HST Tuesday, August 19, 2008 Tele/Videoconference Dial in Number: 877 280 4645 Passcode: 540030 ...
Keck NGAO PD Team Meeting #3 9:00a 6:00p PST on Sept. 11; 9:00a 5:00p on Sept. 12. 6:00a 3:00p HST on Sept. 11; 6:00a 2:00p on Sept. 12. Thursday and Friday ...
Keck NGAO PD Team Meeting #4 10:00a 1:45p PST 8:00a 11:45a HST Friday, December 19, 2008 Tele/Videoconference Dial in Number: 877 280 4645 Passcode: 540030 ...
Keck NGAO PD Team Meeting #5 1:00p 5:00p PST 11:00a 3:00p HST Thursday, February 5, 2009 Tele/Videoconference Dial in Number: 877 280 4645 Passcode: 540030 ...
Keck NGAO PD Team Meeting #6 1:00p 5:00p PDT 10:00a 2:00p HST Thursday, March 19, 2009 Tele/Videoconference Dial in Number: 877 280 4645 Passcode: 540030 ...
Keck NGAO PD Team Meeting #7 11:30a 3:30p PDT 8:30a 12:30p HST Wednesday, May 27, 2009 (rescheduled from an original May 15 date) Tele/Videoconference Dial ...
Keck NGAO PD Team Meeting #8 11:00a 01:00p PDT 08:00a 10:00a HST Wednesday, September 2, 2009 Tele/Videoconference Dial in Number: 877 280 4645 Passcode ...
Keck NGAO PD Phase LGS !WFS Mini Review 10:00a 02:00p PDT 08:00a 12:00p HST Monday, December 7, 2009 Tele/Videoconference Dial in Number: 877 280 4645 Passcode ...
AO System Design Effort (WBS 3.2 3.3), System Design Phase PDR Phase Opto Mechanical Design page Opto Mechanical Mini Design Review, Nov 2009 Management ...
Meeting Minutes Team Meeting #9 Agenda AO and Laser System Design Kickoff, August 24, 2007 Opto mechanical group meeting September 28, 2007 Keck NGAO ...
Acquisition Cameras (WBS 3.2.3.7.1 WBS 3.2.3.7.2) WSPS NGAO acq WBS 32371v2.doc: Draft plan for WBS report NGAO WBS32371 dlm.doc: DLM's working draft ...
AO for Extragalactic Astronomy Active Galactic Nuclei and Quasars To see how to upload files or add topics, go to TWikiTutorial ClaireMax 28 May 2006
Adaptive Secondary Mirror architecture(s) to NGAO Architecture Retreat Two telescope AM2 Narrow !FoV Relay Implementation Starting definitions NGAO architecture ...
Agenda Indian Wells NGAO Point Design Retreat Tuesday, April 25: Noon 1pm Welcome/Lunch 1pm REQUIREMENTS CAPTURE Review science case requirements ...
NGAO related site for Anna Moore Welcome! Instrument re use trade study Systems Architecture This is a link to the studies relating to NGAo systems architecture ...
Performance Budget Development to Matthew Britton's astrometry page 061110 Initial Telecon 2006 12 NGAO Astrometry PPT (4 slides; Jessica Lu)
NGAO Cascaded Relay Architecture to NGAO Architecture Retreat Notes Notes on Cascade architecture
Accessing the Contour requirements database Contour Requirements Database Certificate error is normal Click "Continue to this website" ...
NGAO Controls Systems Twiki Page A. NGAO Background Information From the System Design Review: System Design Report This is a high level overview of ...
Initial Wiki Page Placeholder RichardDekany 14 Apr 2006 WBS example.xls: ROM costing spreadsheet example
AO System Diagnostics (WBS 3.2.3.9, WBS 3.2.3.10, WBS3.2.12) Integrated with AO (WBS 3.2.3.9) Proposed subsystems Radiometric calibration of instrument and ...
Keck NGAO Cost Estimation Assignments Links Team Meeting #13 Estimator Template Workbooks (MS Excel) NGAO SD Cost Estimate Sean Adkins.xls NGAO SD ...
NGAO Performance Flowdown Worksheets A performance flowdown is the allocation of error terms to constituent subsystems or components Version Controlled Flowdown Summary ...
This page presents various drafts and background information on the NGAO functional requirements: of NGAO Requirements Documents, P. Wizinowich, May 24, 2007 ...
Workshop Goals 1. Establish and document the flowdown from Science Case requirements to NGAO technical requirements, 1. Develop and document one feasible implementation ...
KNGAO GOODS N Science Case Reference paper: giavalisco04.pdf Field center (J2000): RA 12 36 55 Dec 62 14 15 Minimum zenith angle: 42.4 degrees AntoninBouchez ...
Star Lists for sky coverage calculations Low star density extragalactic fields: Goods North and South, GEMS, and COSMOS see also: http://lao.ucolick.org/tipTiltErrorMaps ...
AO for Extragalactic Astronomy Gravitational Lensing To see how to upload files or add topics, go to TWikiTutorial Below are fits files from Don Gavel: simulation ...
Performance Budget Development 061121 NGAO high contrast minutes.pdf: Kickoff meeting 061212 NGAO high contrast minutes.pdf: Meeting #2 061212 NGAO high ...
AO for Extragalactic Astronomy High Redshift Galaxies This is the place to put drafts, questions, comments, images, etc. To see how to upload files or add topics ...
Sean Adkins Request: Be prepared to discuss the current state of the art for low noise CCD detectors and the outlook for future performance improvements in this ...
Post retreat homework assignments Trade Study Possibilities v2.doc: Trade Study Possibilities v2.doc NGAO Risks v1.xls: Initial draft of risk matrix (from IW ...
NIRC 2 and OSIRIS Interfaces Message sent from R. Dekany to J. Larkin, and K. Matthews: Hi, James, Keith, In considering a point design for NGAO, we've been wondering ...
ClaireMax 03 Jun 2006
Irregular Asterisms Plot key: Orange stars LGS location, Blue cross evaluation point (5" spacing on axis) (15" spacing off axis) ChrisNeyman 05 Mar 2009 ...
Keck I Upgrade Architecture to NGAO Architecture Retreat Starting definitions NGAO architecture retreat K1 Upgrade.pdf NGAO architecture retreat K1 Upgrade ...
NGAO LGS Asterism Study Triangle Asterism Triangle 10" radius plots Triangle 20" radius plots Triangle 30" radius plots Triangle 40" radius plots ...
NGAO LGS Object Selection Mechanism page Nomenclature LGS WFS assembly This is the entire LGS WFS package containing the 9 LGS WFS units, LGS OSM and all structure ...
NGAO Laser Guide Star Facility Main.Jason Chin Originated 29 Oct 2009 Laser Launch Facility Mini Review Reviewer Documents Charter Presentation ...
NGAO LOWFS Object Selection Mechanism Nomenclature: NGAO LOWFS OSM This is a interim OSM for the NGAO system, likely required for first light before the d IFS is ...
180" Technical !FoV (!TFoV) Relay Architecture to NGAO Architecture Retreat Starting definitions NGAO architecture retreat 180 Relay.pdf NGAO architecture ...
WBS 3.3 LGS Facility (NGAO System Design Collection) Work Package Meetings Kick off meeting held on 4th Sept., 2007 (attendees: J. Bell, J. Chin, C. Neyman, Erik ...
NGAO Preliminary Design Phase Main.Jason Chin Originated 09 February 2009 Laser System Design Effort (WBS 3.5 3.8), Preliminary Design Phase Useful Information ...
Location: Indian Wells Resort Hotel 76 661 Hwy 111, Indian Wells, CA 92210 Phone: 760.345.6466 toll free:800.248.3220 Wireless internet access will be available ...
Initial Twiki Page Placeholder RichardDekany 14 Apr 2006 SPIE Glasgow 04 final.doc: Glasgow Risk Assessment Paper
NGAO Model Validation Parameter and data file exchange for testing the disparate tomography codes. Don Gavel 24 Aug 2006 Draft plan: Keck NGAO model validation ...
Name Email Organization Phone Sean Adkins WMKO (808) 881 3775 Brian Bauman LLNL (925) 423 6592 Antonin Bouchez COO (626 ...
This page is used to summarize the work for the observing scenarios. The observing scenarios and example observations are used to develop the use cases (observing ...
Posted below is some material that document the W. M. Keck Observatory Development Phases. The author of these documents is the WMKO Instrumentation Program Manager ...
System Requirements Document Final Version for System Design Review KAON 456 System Requirements Document (pdf) Draft Versions KAON456 NGAO SRD v1.14 ...
NGAO Science Instrumentation This is the working area for NGAO science instrumentation development. It is access controlled as a private working area for the NGAO ...
PD Phase 090902 NGAO PD Meeting #8 (Tele/Video) 090527 NGAO PD Meeting #7 (Tele/Video) 090319 NGAO PD Meeting #6 (Tele/Video) 090205 NGAO PD Meeting ...
NGAO Work Scope Planning Sheet.doc: Work Scope Planning Sheet template for NGAO tasks (11/29/06 revised). This planning sheet should be prepared and approved ...
This collection is for the NGAO Science Advisory Team SAT Members: Laird Close, George Djorgovski, Richard Ellis, James Graham, Michael Liu, Keith Matthews, Mark ...
KAON Summary by Category Technical KAONs: 303 Mauna Kea Atmospheric Parameters (CN M1,M2,M3 models) 415 TMT site monitoring data (restricted access) ...
NGAO Systems Architecture LOWFS and D NIRI pickoff study Beamsplitter layout for P3k (Antonin Bouchez) Main.Anna Moore 5th July 2007
NGAO Systems Architecture Excel spreadsheets for Systems architecture LOWFS pickoff options Nodding and dithering options K mirror versus instrument ...
Your comments are welcome on these documents. I am always looking for inputs and suggestions.. Ask me for the latest versions of the documents if needed. Mar. 2008 ...
Design Standards: 484 Optical Design Practices for NGAO Exporting Zemax as a STEP file: Zemax Export Screen Snapshot Zemax files can be imported to Solidworks ...
Working Optical Design Requirements See the corresponding Section on Optical Design Requirements in the latest SRD
This collection is for Opto Mechanical Graphics in support of design and interface control. Telescope: Note: WM Keck DSM team is working on a Solidworks 3D Model ...
NGAO Opto Mechanics Mini Design Review, November 17, 2009 NOTE CHANGE The review date has been changed to November 17 to allow more time for the reviewers to read ...
AO System Design Opto Mechanical Design LOWFS and HOWFS Design Real Time Control Design Supervisory Control Design Acquisition System Design ...
This collection is for maintaining the cost estimation documentation for the PDR. NFIRAOS Cost Comparison Review NFIRAOS Cost Comparison Review: Goal, Products ...
This collection is for maintaining the Preliminary Design Phase Management Plan. Preliminary Design (PD) Phase Plan from System Design Review (SDR) Systems Engineering ...
This collection is for maintaining the Preliminary Design Phase Reports and tracked versions of the schedule. NGAO Project Schedules Tracked version of the Build ...
Links to PSF libraries from Chris Neyman and Ralf Flicker All on axis cases: FTP PDF document with explanations to the PSF simulations. ...
General AO Requirements 1.2 Opto Mechanical 1.2.3 Rotator 1.2.4 Wide Field Relay 1.2.5 Narrow Field Relay 1.2.7 LGS WFS Assembly ...
LGS pentagon asterism 10" radius Plot key: Orange stars LGS location, Blue cross evaluation point (5" spacing on axis) (15" spacing off axis) ChrisNeyman ...
LGS pentagon asterism 20" radius Plot key: Orange stars LGS location, Blue cross evaluation point (5" spacing on axis) (15" spacing off axis) ChrisNeyman ...
LGS pentagon asterism 30" radius Plot key: Orange stars LGS location, Blue cross evaluation point (5" spacing on axis) (15" spacing off axis) ChrisNeyman ...
LGS pentagon asterism 30" radius Plot key: Orange stars LGS location, Blue cross evaluation point (5" spacing on axis) (15" spacing off axis) ChrisNeyman ...
LGS pentagon asterism 40" radius Plot key: Orange stars LGS location, Blue cross evaluation point (5" spacing on axis) (15" spacing off axis) ChrisNeyman ...
LGS pentagon asterism 30" radius Plot key: Orange stars LGS location, Blue cross evaluation point (5" spacing on axis) (15" spacing off axis) ChrisNeyman ...
LGS pentagon asterism 50" radius Plot key: Orange stars LGS location, Blue cross evaluation point (5" spacing on axis) (15" spacing off axis) ChrisNeyman ...
LGS pentagon asterism 60" radius Plot key: Orange stars LGS location, Blue cross evaluation point (5" spacing on axis) (15" spacing off axis) ChrisNeyman ...
NGAO Performance Budgets Working Groups (updated Aug 25, 2009) Performance Budget Team Membership Modelling Tools and Validation Dekany, Gavel, Neyman ...
Summary MatthewBritton 08 July 2007
This collection is for supporting the development of a Plan for Phased Implementation and Descopes. 594 Plan to Address Phased Implementation and Descope Options ...
to Matthew Britton's Photometric Precision page Includes first draft of Photometric Error Budget Technical Report, Minutes, and Many Collected References ...
NGAO Proposal PeterWizinowich 09 Jun 2006
NGAO Proposal (225 pgs) NGAO Proposal Executive Summary (35 pgs)
This is the place to put drafts of our NGAO proposal sections on extragalactic science; web links for PSF information; simulated images that we've made for the NGAO ...
This page may be used for sharing information by editing information on this page and/or attaching files. Pages and attachments are openly viewable, but require Registration ...
This page may be used for sharing information by editing information on this page and/or attaching files. Pages and attachments are openly viewable, but require Registration ...
Extragalactic Astronomy Point Spread Functions MCAO (2 Deformable Mirror) PSFs for V,R,I,J,H,K http://lao.ucolick.org/psfs.html . The tip/tilt uncertainty is ...
LGS quincunx asterism 10" radius Plot key: Orange stars LGS location, Blue cross evaluation point (5" spacing on axis) (15" spacing off axis) ChrisNeyman ...
LGS quincunx asterism 20" radius Plot key: Orange stars LGS location, Blue cross evaluation point (5" spacing on axis) (15" spacing off axis) ChrisNeyman ...
LGS quincunx asterism 40" radius Plot key: Orange stars LGS location, Blue cross evaluation point (5" spacing on axis) (15" spacing off axis) ChrisNeyman ...
NGAO Real Time Controller Mini Design Review, December 2009 Review Schedule Design group posts material to web site: end of day Dec 1 Response from reviewers ...
Real Time Controller (RTC) Design, Preliminary Design Phase Link to mini Design Review Page Project Plan RTC Project Plan Rebaseline (Revision 1, dated ...
AO for Extragalactic Astronomy Drafts of Extragalactic Science Section, NGAO Proposal This is the TWiki page where we will upload our draft extragalactic subsections ...
NGAO Systems Architecture Excel spreadsheets for LOWFS pickoffs, nodding and dithering and k mirror versus instrumet field de rotators PeterWizinowich 09 ...
This collection is for producing the Systems Engineering Management Plan to be presented at the System Design Review. WBS 4.1.1 Work Breakdown Structure Task Definitions ...
KNGAO Science Case GOODS N sky coverage simulation AntoninBouchez 04 May 2006
Follow link to access the Twiki page that presents the work studies performed during the System Design phase for NGAO science operations. I start with more questions ...
This page presents various simulations in progress or completed for the NGAO Science Cases: 1 PSF Libraries 1 PSF Simulation Parameters (active) 1 Asteroid ...
NGAO Proposal PeterWizinowich 09 Jun 2006
Split 20" Narrow field instruments / 120" d NIRI relay architecture to NGAO Architecture Retreat Starting definitions NGAO architecture retreat split 20 120 relay ...
AO for Extragalactic Astronomy Stellar Populations in Crowded Fields This is the place for drafts, questions, comments, images, etc. To see how to upload files or ...
NGAO System Architecture WBS 3.1.3 Please create a bookmark to this page now. Draft Work Package Schedule Subsystem Evaluation Criteria Form.xls. Please ...
This collection is for System Design Phase Planning and Tracking Documents EC Telecon Dial in Number 877 280 4645 with passcode 540030 (via WMKO) Systems Engineering ...
NGAO Systems Engineering Analysis Point and shoot study Point and Shoot Trade Study propagration in LGS tomography (KAON 621) and Shoot SPIE paper ...
Systems Engineering Indian Wells charts Point Design chart Point design spitter farm v2 AntoninBouchez 28 Apr 2006 Indian Wells point design Point Design spread ...
NGAO Systems Engineering Group Twiki Page A. Mini Design Review Action list 1. Actions from Software, AO Bench and Relay, LGS Faciity excel B. Meetings 1. ...
Optical transmission calculation RichardDekany 20 Apr 2006
NGAO Proposal Template Document.doc: MS Word .doc template RichardDekany 16 May 2006
Chris Neyman TestPage Where am I?
NGAO Proposal PeterWizinowich 09 Jun 2006
test parent page ChrisNeyman 11 09 2006
LGS tetrad asterism 5" radius Plot key: Orange stars LGS location, Blue cross evaluation point (5" spacing on axis) (15" spacing off axis) ChrisNeyman 02 ...
LGS tetrad asterism 10" radius Plot key: Orange stars LGS location, Blue cross evaluation point (5" spacing on axis) (15" spacing off axis) ChrisNeyman 02 ...
LGS tetrad asterism 15" radius Plot key: Orange stars LGS location, Blue cross evaluation point (5" spacing on axis) (15" spacing off axis) ChrisNeyman 02 ...
LGS tetrad asterism 20" radius Plot key: Orange stars LGS location, Blue cross evaluation point (5" spacing on axis) (15" spacing off axis) ChrisNeyman 02 ...
LGS tetrad asterism 30" radius Plot key: Orange stars LGS location, Blue cross evaluation point (5" spacing on axis) (15" spacing off axis) ChrisNeyman 02 ...
LGS tetrad asterism 40" radius Plot key: Orange stars LGS location, Blue cross evaluation point (5" spacing on axis) (15" spacing off axis) ChrisNeyman 02 ...
LGS tetrad asterism 50" radius Plot key: Orange stars LGS location, Blue cross evaluation point (5" spacing on axis) (15" spacing off axis) ChrisNeyman 02 ...
LGS tetrad asterism 60" radius Plot key: Orange stars LGS location, Blue cross evaluation point (5" spacing on axis) (15" spacing off axis) ChrisNeyman 02 ...
WBS 3.1.2.3.3. LGS Asterism Geometry Size Trade Study LGSasterism.doc WBS 3.1.2.3.4. KAON 427. Fixed vs Variable LGS Asterism Cost/benefit Trade Study KAON427 ...
Transmission and Background Budget pages Documents KAON 501: NGAO Background and Transmission Budgets: AHB 8/28/07 Old versions: v1.0 (8/8/07) Modeling ...
Here are the basic transmission factors for the NGAO point design (as currently envisioned): Telescope transmission (H band) # of mirrors (exposed) ...
LGS triangle asterism 10" radius Plot key: Orange stars LGS location, Blue cross evaluation point (5" spacing on axis) (15" spacing off axis) ChrisNeyman ...
LGS triangle asterism 20" radius Plot key: Orange stars LGS location, Blue cross evaluation point (5" spacing on axis) (15" spacing off axis) ChrisNeyman ...
LGS triangle asterism 30" radius Plot key: Orange stars LGS location, Blue cross evaluation point (5" spacing on axis) (15" spacing off axis) ChrisNeyman ...
LGS triangle asterism 40" radius Plot key: Orange stars LGS location, Blue cross evaluation point (5" spacing on axis) (15" spacing off axis) ChrisNeyman ...
LGS triangle asterism 50" radius Plot key: Orange stars LGS location, Blue cross evaluation point (5" spacing on axis) (15" spacing off axis) ChrisNeyman ...
LGS triangle asterism 60" radius Plot key: Orange stars LGS location, Blue cross evaluation point (5" spacing on axis) (15" spacing off axis) GS triangle asterism ...
NGAO Proposal WBS Dictionary (Goal is a dictionary entry for each line of the WBS; make no entries here, rather submit to Peter by email) 1 System Design Phase ...
Preliminary Design Phase Laser Guide Star (LGS) !WFS Subsystem Consisting of the Fixed LGS asterism assembly and Patrolling LGS asterism assembly (aka Point and Shoot ...
WFE budget documentation WFE budget tool outline overview.pdf: Initial draft of outline form of spreadsheet tool documentation 1/4/07 R. Dekany The ...
Project Scope: Enabling front page astronomical science by designing, building, and deploying the world's most advanced astronomical adaptive optics instrumentation ...
TWikiGuest example #64;your.company EdWetherell ewetherell #64;keck.hawaii.edu .WebChangesAlert, ., .TWikiRegistration
Keck/NGAO Web Preferences The following settings are web preferences of the Keck/NGAO web. These preferences overwrite the site level preferences in ., and ...
TWiki's Keck/NGAO web /Keck/NGAO
Statistics for Keck/NGAO Web Month: Topic views: Topic saves: File uploads: Most popular topic views: Top contributors for topic save and ...
NGAO Proposal PeterWizinowich 09 Jun 2006
Link to all NGAO KAON's All Work Packages listed here require a Scope Planning Sheet, unless otherwise noted WBS Work Package Lead Scope Planning ...
Number of topics: 170

See also the faster WebTopicList

Edit | Attach | Printable | Raw View | Backlinks: Web, All Webs | History: r3 < r2 < r1 | More topic actions
 
Keck Next Generation Adaptive Optics
This site is powered by the TWiki collaboration platformCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback