NGAO Opto Mechanics Mini Design Review, November 17, 2009 NOTE CHANGE The review date has been changed to November 17 to allow more time for the reviewers to read ...
This collection is for maintaining the Preliminary Design Phase Reports and tracked versions of the schedule. NGAO Project Schedules Tracked version of the Build ...
NGAO Systems Engineering Group Twiki Page A. Meetings 1. Friday, January 9, 2009 Minutes 1. Friday, January 23, 2009 Minutes 1. Friday, February 6, 2009 ...
Project Scope: Enabling front page astronomical science by designing, building, and deploying the world's most advanced astronomical adaptive optics instrumentation ...
NGAO Science Instrumentation This is the working area for NGAO science instrumentation development. It is access controlled as a private working area for the NGAO ...
Real Time Controller (RTC) Design, Preliminary Design Phase Project Plan RTC Project Plan Rebaseline (Revision 1, dated June 1,2009) RTC Project Plan Rebaseline ...
NGAO Performance Flowdown Worksheets A performance flowdown is the allocation of error terms to constituent subsystems or components Version Controlled Flowdown Summary ...
Keck/NGAO Web Preferences The following settings are web preferences of the Keck/NGAO web. These preferences overwrite the site level preferences in ., and ...
NGAO Controls Systems Twiki Page A. NGAO Background Information From the System Design Review: System Design Report This is a high level overview of ...
WFE budget documentation WFE budget tool outline overview.pdf: Initial draft of outline form of spreadsheet tool documentation 1/4/07 R. Dekany The ...
NGAO Performance Budgets Working Groups (updated Aug 25, 2009) Performance Budget Team Membership Modelling Tools and Validation Dekany, Gavel, Neyman ...
Keck NGAO PD Team Meeting #7 11:30a 3:30p PDT 8:30a 12:30p HST Wednesday, May 27, 2009 (rescheduled from an original May 15 date) Tele/Videoconference Dial ...
This collection is for the NGAO Science Advisory Team SAT Members: Laird Close, George Djorgovski, Richard Ellis, James Graham, Michael Liu, Keith Matthews, Mark ...
AO System Design Effort (WBS 3.2 3.3), System Design Phase Link to PDR Phase Opto Mechanical Design page Management Meeting minutes Team Meeting #9 ...
This page presents various drafts and background information on the NGAO functional requirements: of NGAO Requirements Documents, P. Wizinowich, May 24, 2007 ...
Irregular Asterisms Plot key: Orange stars LGS location, Blue cross evaluation point (5" spacing on axis) (15" spacing off axis) ChrisNeyman 05 Mar 2009 ...