Difference: 091207_LGS_WFS (1 vs. 17)

Revision 172010-05-05 - ColetteTyau

Line: 1 to 1
 
META TOPICPARENT name="WFS"

Keck NGAO PD Phase LGS WFS Mini-Review

Line: 13 to 13
 
*In effigie (e.g. on the phone or video): Dekany, Delacroix, Gavel (Chair), Lockwood (Reviewer), Max, Stalcup (Reviewer), Velur, Wizinowich

Final Reviewer Report

Changed:
<
<
KAON 699 - Summary of the NGAO Laser Guide Star Wavefront Sensor Design mini-review
>
>
KAON 699 - Summary of the NGAO Laser Guide Star Wavefront Sensor Design mini-review
 

Minutes and Action Items:

Revision 162010-05-05 - ColetteTyau

Line: 1 to 1
 
META TOPICPARENT name="WFS"

Keck NGAO PD Phase LGS WFS Mini-Review

Line: 12 to 12
 
*In effigie (e.g. on the phone or video): Dekany, Delacroix, Gavel (Chair), Lockwood (Reviewer), Max, Stalcup (Reviewer), Velur, Wizinowich
Changed:
<
<
Minutes and Action Items:
>
>

Final Reviewer Report

KAON 699 - Summary of the NGAO Laser Guide Star Wavefront Sensor Design mini-review

Minutes and Action Items:

 

Input materials

  • Charge to Reviewers .pdf

Revision 152009-12-15 - ViswaVelur

Line: 1 to 1
 
META TOPICPARENT name="WFS"

Keck NGAO PD Phase LGS WFS Mini-Review

Line: 38 to 38
 
  • 12:40 p Debrief and Recommendations
  • 01:00 p Adjourn
Added:
>
>
Notes from the meeting (RGD, VNV)
 

Helpful Links

Line: 66 to 70
 
META FILEATTACHMENT attachment="NGAO_LGS_Review_Optics_Velur_rev2.pdf" attr="" comment="" date="1260206143" name="NGAO_LGS_Review_Optics_Velur_rev2.pdf" path="C:\Documents and Settings\Viswa Velur\Desktop\lgswfs_design_folder\NGAO LGS Review Optics Velur rev2.pdf" size="3270893" stream="C:\Documents and Settings\Viswa Velur\Desktop\lgswfs_design_folder\NGAO LGS Review Optics Velur rev2.pdf" user="Main.ViswaVelur" version="1"
META FILEATTACHMENT attachment="NGAO_LGS_Review_Optics_Velur_rev1.ppt" attr="" comment="Optics Presentation (PPT)" date="1260209419" name="NGAO_LGS_Review_Optics_Velur_rev1.ppt" path="NGAO_LGS_Review_Optics_Velur_rev1.ppt" size="7882752" stream="NGAO_LGS_Review_Optics_Velur_rev1.ppt" user="Main.ViswaVelur" version="1"
META FILEATTACHMENT attachment="Wavefront_Error_Budget_Tool_v1.48.xlsm" attr="" comment="Wavefront error budget 1.48" date="1260210808" name="Wavefront_Error_Budget_Tool_v1.48.xlsm" path="Wavefront Error Budget Tool v1.48.xlsm" size="1121280" stream="Wavefront Error Budget Tool v1.48.xlsm" user="Main.ViswaVelur" version="1"
Added:
>
>
META FILEATTACHMENT attachment="091207_LGS_WFS_Mini-Review_Minutes_Dekany.pdf" attr="" comment="" date="1260909579" name="091207_LGS_WFS_Mini-Review_Minutes_Dekany.pdf" path="091207 LGS WFS Mini-Review Minutes Dekany.pdf" size="36534" stream="091207 LGS WFS Mini-Review Minutes Dekany.pdf" user="Main.ViswaVelur" version="1"
META FILEATTACHMENT attachment="Viswas_notes.rtf" attr="" comment="Viswa's notes" date="1260910127" name="Viswas_notes.rtf" path="Viswa's notes.rtf" size="2144" stream="Viswa's notes.rtf" user="Main.ViswaVelur" version="1"

Revision 142009-12-07 - RichardDekany

Line: 1 to 1
 
META TOPICPARENT name="WFS"

Keck NGAO PD Phase LGS WFS Mini-Review

Line: 41 to 41
 

Helpful Links

Changed:
<
<
>
>
 
META FILEATTACHMENT attachment="091207_LGS_WFS_Mini-Review_Charge_v2.pdf" attr="" comment="" date="1258750611" name="091207_LGS_WFS_Mini-Review_Charge_v2.pdf" path="091207 LGS WFS Mini-Review Charge v2.pdf" size="72535" stream="091207 LGS WFS Mini-Review Charge v2.pdf" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attachment="091207_LGS_WFS_PD_Risk_Register_v1.pdf" attr="" comment="" date="1258867078" name="091207_LGS_WFS_PD_Risk_Register_v1.pdf" path="091207 LGS WFS PD Risk Register v1.pdf" size="100565" stream="091207 LGS WFS PD Risk Register v1.pdf" user="Main.RichardDekany" version="1"

Revision 132009-12-07 - ViswaVelur

Line: 1 to 1
 
META TOPICPARENT name="WFS"

Keck NGAO PD Phase LGS WFS Mini-Review

Line: 29 to 29
 

Agenda (Draft) - All times PST

  • 10:00 a Requirements (Dekany) .ppt .pdf
Changed:
<
<
>
>
 
  • 11:00 a Mechanical (Delacroix) .pdf
  • 11:30 a Risk Summary (Dekany) .pdf
  • 11:40 a Break
Line: 41 to 41
 

Helpful Links

Added:
>
>
 
META FILEATTACHMENT attachment="091207_LGS_WFS_Mini-Review_Charge_v2.pdf" attr="" comment="" date="1258750611" name="091207_LGS_WFS_Mini-Review_Charge_v2.pdf" path="091207 LGS WFS Mini-Review Charge v2.pdf" size="72535" stream="091207 LGS WFS Mini-Review Charge v2.pdf" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attachment="091207_LGS_WFS_PD_Risk_Register_v1.pdf" attr="" comment="" date="1258867078" name="091207_LGS_WFS_PD_Risk_Register_v1.pdf" path="091207 LGS WFS PD Risk Register v1.pdf" size="100565" stream="091207 LGS WFS PD Risk Register v1.pdf" user="Main.RichardDekany" version="1"
Line: 60 to 61
 
META FILEATTACHMENT attachment="Ed_Wetherall_comments.pdf" attr="" comment="" date="1260163658" name="Ed_Wetherall_comments.pdf" path="Ed_Wetherall_comments.pdf" size="40436" stream="Ed_Wetherall_comments.pdf" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attachment="091207_NGAO_LGS_Review_Intro.ppt" attr="" comment="" date="1260171481" name="091207_NGAO_LGS_Review_Intro.ppt" path="091207 NGAO LGS Review Intro.ppt" size="339968" stream="091207 NGAO LGS Review Intro.ppt" user="Main.RichardDekany" version="2"
META FILEATTACHMENT attachment="091207_NGAO_LGS_Review_Intro.pdf" attr="" comment="" date="1260171456" name="091207_NGAO_LGS_Review_Intro.pdf" path="091207 NGAO LGS Review Intro.pdf" size="294797" stream="091207 NGAO LGS Review Intro.pdf" user="Main.RichardDekany" version="1"
Added:
>
>
META FILEATTACHMENT attachment="NGAO_LGS_Review_Optics_Velur_rev1.pdf" attr="" comment="Optics Presentation (PDF)" date="1260206013" name="NGAO_LGS_Review_Optics_Velur_rev1.pdf" path="C:\Documents and Settings\Viswa Velur\Desktop\lgswfs_design_folder\NGAO LGS Review Optics Velur rev1.pdf" size="3270893" stream="C:\Documents and Settings\Viswa Velur\Desktop\lgswfs_design_folder\NGAO LGS Review Optics Velur rev1.pdf" user="Main.ViswaVelur" version="2"
META FILEATTACHMENT attachment="NGAO_LGS_Review_Optics_Velur_rev1.pptx" attr="" comment="" date="1260205918" name="NGAO_LGS_Review_Optics_Velur_rev1.pptx" path="C:\Documents and Settings\Viswa Velur\Desktop\lgswfs_design_folder\NGAO LGS Review Optics Velur rev1.pptx" size="2876358" stream="C:\Documents and Settings\Viswa Velur\Desktop\lgswfs_design_folder\NGAO LGS Review Optics Velur rev1.pptx" user="Main.ViswaVelur" version="2"
META FILEATTACHMENT attachment="NGAO_LGS_Review_Optics_Velur_rev2.pdf" attr="" comment="" date="1260206143" name="NGAO_LGS_Review_Optics_Velur_rev2.pdf" path="C:\Documents and Settings\Viswa Velur\Desktop\lgswfs_design_folder\NGAO LGS Review Optics Velur rev2.pdf" size="3270893" stream="C:\Documents and Settings\Viswa Velur\Desktop\lgswfs_design_folder\NGAO LGS Review Optics Velur rev2.pdf" user="Main.ViswaVelur" version="1"
META FILEATTACHMENT attachment="NGAO_LGS_Review_Optics_Velur_rev1.ppt" attr="" comment="Optics Presentation (PPT)" date="1260209419" name="NGAO_LGS_Review_Optics_Velur_rev1.ppt" path="NGAO_LGS_Review_Optics_Velur_rev1.ppt" size="7882752" stream="NGAO_LGS_Review_Optics_Velur_rev1.ppt" user="Main.ViswaVelur" version="1"
META FILEATTACHMENT attachment="Wavefront_Error_Budget_Tool_v1.48.xlsm" attr="" comment="Wavefront error budget 1.48" date="1260210808" name="Wavefront_Error_Budget_Tool_v1.48.xlsm" path="Wavefront Error Budget Tool v1.48.xlsm" size="1121280" stream="Wavefront Error Budget Tool v1.48.xlsm" user="Main.ViswaVelur" version="1"

Revision 122009-12-07 - RichardDekany

Line: 1 to 1
 
META TOPICPARENT name="WFS"

Keck NGAO PD Phase LGS WFS Mini-Review

Line: 15 to 15
 Minutes and Action Items:

Input materials

Changed:
<
<
>
>
  • Charge to Reviewers .pdf
  • LGS WFS Preliminary Design Document Version 1.5 (KAON 692) .pdf
  • Requirements/Compliance Matrix v2 .pdf
  • LGS WFS Risk Register v1 .pdf
 
  • Response To Reviewer Comments
Changed:
<
<
>
>
    • Response to Peter's comments part1 v1 .doc
    • Response to Peter's comments part2 v0.1.docx .doc
    • Response to Thomas' comments v1 .doc
    • Response to Don's comments v1 .doc
    • Response to Ed's comments .docx .pdf
    • Response to Chris's comments .doc .docx
 

Agenda (Draft) - All times PST

Changed:
<
<
>
>
  • 10:00 a Requirements (Dekany) .ppt .pdf
  • 10:30 a Optical (Velur) .pptx .pdf
  • 11:00 a Mechanical (Delacroix) .pdf
  • 11:30 a Risk Summary (Dekany) .pdf
 
  • 11:40 a Break
  • 11:50 a General discussion (All)
  • 12:10 p Review Committee discussion
Line: 57 to 57
 
META FILEATTACHMENT attachment="LGS_WFS_PDR_KAON_rev1_5.pdf" attr="" comment="LGS WFS mini-PDR KAON Version 1.5" date="1259972028" name="LGS_WFS_PDR_KAON_rev1_5.pdf" path="C:\Documents and Settings\Viswa Velur\Desktop\lgswfs_design_folder\LGS_WFS_PDR_KAON_rev1_5.pdf" size="2795446" stream="C:\Documents and Settings\Viswa Velur\Desktop\lgswfs_design_folder\LGS_WFS_PDR_KAON_rev1_5.pdf" user="Main.ViswaVelur" version="1"
META FILEATTACHMENT attachment="NGAO_LGS_Review_Optics_Velur.pptx" attr="" comment="Optics Presentation" date="1260123234" name="NGAO_LGS_Review_Optics_Velur.pptx" path="C:\Documents and Settings\Viswa Velur\Desktop\lgswfs_design_folder\NGAO LGS Review Optics Velur.pptx" size="2876225" stream="C:\Documents and Settings\Viswa Velur\Desktop\lgswfs_design_folder\NGAO LGS Review Optics Velur.pptx" user="Main.ViswaVelur" version="1"
META FILEATTACHMENT attachment="NGAO_LGS_Review_Optics_Velur.pdf" attr="" comment="PDF Optics Presentation" date="1260123643" name="NGAO_LGS_Review_Optics_Velur.pdf" path="C:\Documents and Settings\Viswa Velur\Desktop\lgswfs_design_folder\NGAO LGS Review Optics Velur.pdf" size="3127313" stream="C:\Documents and Settings\Viswa Velur\Desktop\lgswfs_design_folder\NGAO LGS Review Optics Velur.pdf" user="Main.ViswaVelur" version="1"
Added:
>
>
META FILEATTACHMENT attachment="Ed_Wetherall_comments.pdf" attr="" comment="" date="1260163658" name="Ed_Wetherall_comments.pdf" path="Ed_Wetherall_comments.pdf" size="40436" stream="Ed_Wetherall_comments.pdf" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attachment="091207_NGAO_LGS_Review_Intro.ppt" attr="" comment="" date="1260171481" name="091207_NGAO_LGS_Review_Intro.ppt" path="091207 NGAO LGS Review Intro.ppt" size="339968" stream="091207 NGAO LGS Review Intro.ppt" user="Main.RichardDekany" version="2"
META FILEATTACHMENT attachment="091207_NGAO_LGS_Review_Intro.pdf" attr="" comment="" date="1260171456" name="091207_NGAO_LGS_Review_Intro.pdf" path="091207 NGAO LGS Review Intro.pdf" size="294797" stream="091207 NGAO LGS Review Intro.pdf" user="Main.RichardDekany" version="1"

Revision 112009-12-06 - ViswaVelur

Line: 1 to 1
 
META TOPICPARENT name="WFS"

Keck NGAO PD Phase LGS WFS Mini-Review

Line: 29 to 29
 

Agenda (Draft) - All times PST

  • 10:00 a Requirements (Dekany)
Changed:
<
<
  • 10:30 a Optical (Velur)
>
>
 
  • 11:00 a Mechanical (Delacroix)
  • 11:30 a Conclusion (Dekany)
  • 11:40 a Break
Line: 55 to 55
 
META FILEATTACHMENT attachment="Peters__commentary_on_LGSWFS_part2_doc.doc" attr="" comment="Answers to Peter's Questions and comments (part2)" date="1259952369" name="Peters__commentary_on_LGSWFS_part2_doc.doc" path="C:\Documents and Settings\Viswa Velur\Desktop\lgswfs_design_folder\Peter's_ commentary_on_LGSWFS_part2_doc.doc" size="40960" stream="C:\Documents and Settings\Viswa Velur\Desktop\lgswfs_design_folder\Peter's_ commentary_on_LGSWFS_part2_doc.doc" user="Main.ViswaVelur" version="1"
META FILEATTACHMENT attachment="Ed_Wetherall_comments_doc.docx" attr="" comment="Answers to Wetherall's Questions and comments" date="1259952402" name="Ed_Wetherall_comments_doc.docx" path="C:\Documents and Settings\Viswa Velur\Desktop\lgswfs_design_folder\Ed Wetherall_comments_doc.docx" size="12092" stream="C:\Documents and Settings\Viswa Velur\Desktop\lgswfs_design_folder\Ed Wetherall_comments_doc.docx" user="Main.ViswaVelur" version="1"
META FILEATTACHMENT attachment="LGS_WFS_PDR_KAON_rev1_5.pdf" attr="" comment="LGS WFS mini-PDR KAON Version 1.5" date="1259972028" name="LGS_WFS_PDR_KAON_rev1_5.pdf" path="C:\Documents and Settings\Viswa Velur\Desktop\lgswfs_design_folder\LGS_WFS_PDR_KAON_rev1_5.pdf" size="2795446" stream="C:\Documents and Settings\Viswa Velur\Desktop\lgswfs_design_folder\LGS_WFS_PDR_KAON_rev1_5.pdf" user="Main.ViswaVelur" version="1"
Added:
>
>
META FILEATTACHMENT attachment="NGAO_LGS_Review_Optics_Velur.pptx" attr="" comment="Optics Presentation" date="1260123234" name="NGAO_LGS_Review_Optics_Velur.pptx" path="C:\Documents and Settings\Viswa Velur\Desktop\lgswfs_design_folder\NGAO LGS Review Optics Velur.pptx" size="2876225" stream="C:\Documents and Settings\Viswa Velur\Desktop\lgswfs_design_folder\NGAO LGS Review Optics Velur.pptx" user="Main.ViswaVelur" version="1"
META FILEATTACHMENT attachment="NGAO_LGS_Review_Optics_Velur.pdf" attr="" comment="PDF Optics Presentation" date="1260123643" name="NGAO_LGS_Review_Optics_Velur.pdf" path="C:\Documents and Settings\Viswa Velur\Desktop\lgswfs_design_folder\NGAO LGS Review Optics Velur.pdf" size="3127313" stream="C:\Documents and Settings\Viswa Velur\Desktop\lgswfs_design_folder\NGAO LGS Review Optics Velur.pdf" user="Main.ViswaVelur" version="1"

Revision 102009-12-05 - ViswaVelur

Line: 1 to 1
 
META TOPICPARENT name="WFS"

Keck NGAO PD Phase LGS WFS Mini-Review

Line: 16 to 16
 

Input materials

Changed:
<
<
>
>
 
Line: 54 to 54
 
META FILEATTACHMENT attachment="Chris_comments_w_Alex_Answers.doc" attr="" comment="Answers to Chris' Questions and comments" date="1259881005" name="Chris_comments_w_Alex_Answers.doc" path="C:\Documents and Settings\Viswa Velur\Desktop\lgswfs_design_folder\Chris comments w Alex Answers.doc" size="32768" stream="C:\Documents and Settings\Viswa Velur\Desktop\lgswfs_design_folder\Chris comments w Alex Answers.doc" user="Main.ViswaVelur" version="1"
META FILEATTACHMENT attachment="Peters__commentary_on_LGSWFS_part2_doc.doc" attr="" comment="Answers to Peter's Questions and comments (part2)" date="1259952369" name="Peters__commentary_on_LGSWFS_part2_doc.doc" path="C:\Documents and Settings\Viswa Velur\Desktop\lgswfs_design_folder\Peter's_ commentary_on_LGSWFS_part2_doc.doc" size="40960" stream="C:\Documents and Settings\Viswa Velur\Desktop\lgswfs_design_folder\Peter's_ commentary_on_LGSWFS_part2_doc.doc" user="Main.ViswaVelur" version="1"
META FILEATTACHMENT attachment="Ed_Wetherall_comments_doc.docx" attr="" comment="Answers to Wetherall's Questions and comments" date="1259952402" name="Ed_Wetherall_comments_doc.docx" path="C:\Documents and Settings\Viswa Velur\Desktop\lgswfs_design_folder\Ed Wetherall_comments_doc.docx" size="12092" stream="C:\Documents and Settings\Viswa Velur\Desktop\lgswfs_design_folder\Ed Wetherall_comments_doc.docx" user="Main.ViswaVelur" version="1"
Added:
>
>
META FILEATTACHMENT attachment="LGS_WFS_PDR_KAON_rev1_5.pdf" attr="" comment="LGS WFS mini-PDR KAON Version 1.5" date="1259972028" name="LGS_WFS_PDR_KAON_rev1_5.pdf" path="C:\Documents and Settings\Viswa Velur\Desktop\lgswfs_design_folder\LGS_WFS_PDR_KAON_rev1_5.pdf" size="2795446" stream="C:\Documents and Settings\Viswa Velur\Desktop\lgswfs_design_folder\LGS_WFS_PDR_KAON_rev1_5.pdf" user="Main.ViswaVelur" version="1"

Revision 92009-12-04 - ViswaVelur

Line: 1 to 1
 
META TOPICPARENT name="WFS"

Keck NGAO PD Phase LGS WFS Mini-Review

Line: 21 to 21
 
Changed:
<
<
>
>
 
Changed:
<
<
>
>
 

Agenda (Draft) - All times PST

  • 10:00 a Requirements (Dekany)
  • 10:30 a Optical (Velur)
Line: 51 to 52
 
META FILEATTACHMENT attachment="Ed_Wetherall_comments.docx" attr="" comment="Answers to Wetherall's Questions and comments" date="1259861348" name="Ed_Wetherall_comments.docx" path="C:\Documents and Settings\Viswa Velur\Desktop\lgswfs_design_folder\Ed Wetherall_comments.docx" size="11539" stream="C:\Documents and Settings\Viswa Velur\Desktop\lgswfs_design_folder\Ed Wetherall_comments.docx" user="Main.ViswaVelur" version="1"
META FILEATTACHMENT attachment="Peters__commentary_on_LGSWFS_part2.docx" attr="" comment="Answers to Peter's Questions and comments" date="1259880973" name="Peters__commentary_on_LGSWFS_part2.docx" path="C:\Documents and Settings\Viswa Velur\Desktop\lgswfs_design_folder\Peter's_ commentary_on_LGSWFS_part2.docx" size="17395" stream="C:\Documents and Settings\Viswa Velur\Desktop\lgswfs_design_folder\Peter's_ commentary_on_LGSWFS_part2.docx" user="Main.ViswaVelur" version="1"
META FILEATTACHMENT attachment="Chris_comments_w_Alex_Answers.doc" attr="" comment="Answers to Chris' Questions and comments" date="1259881005" name="Chris_comments_w_Alex_Answers.doc" path="C:\Documents and Settings\Viswa Velur\Desktop\lgswfs_design_folder\Chris comments w Alex Answers.doc" size="32768" stream="C:\Documents and Settings\Viswa Velur\Desktop\lgswfs_design_folder\Chris comments w Alex Answers.doc" user="Main.ViswaVelur" version="1"
Added:
>
>
META FILEATTACHMENT attachment="Peters__commentary_on_LGSWFS_part2_doc.doc" attr="" comment="Answers to Peter's Questions and comments (part2)" date="1259952369" name="Peters__commentary_on_LGSWFS_part2_doc.doc" path="C:\Documents and Settings\Viswa Velur\Desktop\lgswfs_design_folder\Peter's_ commentary_on_LGSWFS_part2_doc.doc" size="40960" stream="C:\Documents and Settings\Viswa Velur\Desktop\lgswfs_design_folder\Peter's_ commentary_on_LGSWFS_part2_doc.doc" user="Main.ViswaVelur" version="1"
META FILEATTACHMENT attachment="Ed_Wetherall_comments_doc.docx" attr="" comment="Answers to Wetherall's Questions and comments" date="1259952402" name="Ed_Wetherall_comments_doc.docx" path="C:\Documents and Settings\Viswa Velur\Desktop\lgswfs_design_folder\Ed Wetherall_comments_doc.docx" size="12092" stream="C:\Documents and Settings\Viswa Velur\Desktop\lgswfs_design_folder\Ed Wetherall_comments_doc.docx" user="Main.ViswaVelur" version="1"

Revision 82009-12-03 - ViswaVelur

Line: 1 to 1
 
META TOPICPARENT name="WFS"

Keck NGAO PD Phase LGS WFS Mini-Review

Line: 21 to 21
 
Changed:
<
<
    • Response to Peter's comments part2
>
>
 
Changed:
<
<
    • Chris Lockwood's comments
>
>
 

Agenda (Draft) - All times PST

  • 10:00 a Requirements (Dekany)
  • 10:30 a Optical (Velur)
Line: 49 to 49
 
META FILEATTACHMENT attachment="LGWFS_minireview_stalcup_comments_response_v1.doc" attr="" comment="" date="1259824762" name="LGWFS_minireview_stalcup_comments_response_v1.doc" path="LGWFS_minireview_stalcup_comments_response_v1.doc" size="45568" stream="LGWFS_minireview_stalcup_comments_response_v1.doc" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attachment="Commentary_on_the_LGS_WFS_design_Gavel_response_v1.doc" attr="" comment="" date="1259824778" name="Commentary_on_the_LGS_WFS_design_Gavel_response_v1.doc" path="Commentary_on_the_LGS_WFS_design_Gavel_response_v1.doc" size="25088" stream="Commentary_on_the_LGS_WFS_design_Gavel_response_v1.doc" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attachment="Ed_Wetherall_comments.docx" attr="" comment="Answers to Wetherall's Questions and comments" date="1259861348" name="Ed_Wetherall_comments.docx" path="C:\Documents and Settings\Viswa Velur\Desktop\lgswfs_design_folder\Ed Wetherall_comments.docx" size="11539" stream="C:\Documents and Settings\Viswa Velur\Desktop\lgswfs_design_folder\Ed Wetherall_comments.docx" user="Main.ViswaVelur" version="1"
Added:
>
>
META FILEATTACHMENT attachment="Peters__commentary_on_LGSWFS_part2.docx" attr="" comment="Answers to Peter's Questions and comments" date="1259880973" name="Peters__commentary_on_LGSWFS_part2.docx" path="C:\Documents and Settings\Viswa Velur\Desktop\lgswfs_design_folder\Peter's_ commentary_on_LGSWFS_part2.docx" size="17395" stream="C:\Documents and Settings\Viswa Velur\Desktop\lgswfs_design_folder\Peter's_ commentary_on_LGSWFS_part2.docx" user="Main.ViswaVelur" version="1"
META FILEATTACHMENT attachment="Chris_comments_w_Alex_Answers.doc" attr="" comment="Answers to Chris' Questions and comments" date="1259881005" name="Chris_comments_w_Alex_Answers.doc" path="C:\Documents and Settings\Viswa Velur\Desktop\lgswfs_design_folder\Chris comments w Alex Answers.doc" size="32768" stream="C:\Documents and Settings\Viswa Velur\Desktop\lgswfs_design_folder\Chris comments w Alex Answers.doc" user="Main.ViswaVelur" version="1"

Revision 72009-12-03 - ViswaVelur

Line: 1 to 1
 
META TOPICPARENT name="WFS"

Keck NGAO PD Phase LGS WFS Mini-Review

Line: 24 to 24
 
Changed:
<
<
    • Response to Ed's comments
>
>
 

Agenda (Draft) - All times PST

  • 10:00 a Requirements (Dekany)
  • 10:30 a Optical (Velur)
Line: 48 to 48
 
META FILEATTACHMENT attachment="Peters__commentary_on_LGSWFS_part1_response_v1.doc" attr="" comment="" date="1259824742" name="Peters__commentary_on_LGSWFS_part1_response_v1.doc" path="Peters__commentary_on_LGSWFS_part1_response_v1.doc" size="33792" stream="Peters__commentary_on_LGSWFS_part1_response_v1.doc" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attachment="LGWFS_minireview_stalcup_comments_response_v1.doc" attr="" comment="" date="1259824762" name="LGWFS_minireview_stalcup_comments_response_v1.doc" path="LGWFS_minireview_stalcup_comments_response_v1.doc" size="45568" stream="LGWFS_minireview_stalcup_comments_response_v1.doc" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attachment="Commentary_on_the_LGS_WFS_design_Gavel_response_v1.doc" attr="" comment="" date="1259824778" name="Commentary_on_the_LGS_WFS_design_Gavel_response_v1.doc" path="Commentary_on_the_LGS_WFS_design_Gavel_response_v1.doc" size="25088" stream="Commentary_on_the_LGS_WFS_design_Gavel_response_v1.doc" user="Main.RichardDekany" version="1"
Added:
>
>
META FILEATTACHMENT attachment="Ed_Wetherall_comments.docx" attr="" comment="Answers to Wetherall's Questions and comments" date="1259861348" name="Ed_Wetherall_comments.docx" path="C:\Documents and Settings\Viswa Velur\Desktop\lgswfs_design_folder\Ed Wetherall_comments.docx" size="11539" stream="C:\Documents and Settings\Viswa Velur\Desktop\lgswfs_design_folder\Ed Wetherall_comments.docx" user="Main.ViswaVelur" version="1"

Revision 62009-12-03 - RichardDekany

Line: 1 to 1
 
META TOPICPARENT name="WFS"

Keck NGAO PD Phase LGS WFS Mini-Review

Line: 20 to 20
 
Added:
>
>
 

Agenda (Draft) - All times PST

  • 10:00 a Requirements (Dekany)
Line: 40 to 45
 
META FILEATTACHMENT attachment="091207_LGS_WFS_PD_Risk_Register_v1.pdf" attr="" comment="" date="1258867078" name="091207_LGS_WFS_PD_Risk_Register_v1.pdf" path="091207 LGS WFS PD Risk Register v1.pdf" size="100565" stream="091207 LGS WFS PD Risk Register v1.pdf" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attachment="1.2.7-LGS_WFS_Functional_Requirements_091121_v2.pdf" attr="" comment="" date="1258867843" name="1.2.7-LGS_WFS_Functional_Requirements_091121_v2.pdf" path="1.2.7-LGS WFS Functional Requirements 091121 v2.pdf" size="27663" stream="1.2.7-LGS WFS Functional Requirements 091121 v2.pdf" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attachment="LGS_WFS_PDR_KAON_v1_0.pdf" attr="" comment="" date="1259137491" name="LGS_WFS_PDR_KAON_v1_0.pdf" path="LGS_WFS_PDR_KAON_v1_0.pdf" size="2907167" stream="LGS_WFS_PDR_KAON_v1_0.pdf" user="Main.RichardDekany" version="1"
Added:
>
>
META FILEATTACHMENT attachment="Peters__commentary_on_LGSWFS_part1_response_v1.doc" attr="" comment="" date="1259824742" name="Peters__commentary_on_LGSWFS_part1_response_v1.doc" path="Peters__commentary_on_LGSWFS_part1_response_v1.doc" size="33792" stream="Peters__commentary_on_LGSWFS_part1_response_v1.doc" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attachment="LGWFS_minireview_stalcup_comments_response_v1.doc" attr="" comment="" date="1259824762" name="LGWFS_minireview_stalcup_comments_response_v1.doc" path="LGWFS_minireview_stalcup_comments_response_v1.doc" size="45568" stream="LGWFS_minireview_stalcup_comments_response_v1.doc" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attachment="Commentary_on_the_LGS_WFS_design_Gavel_response_v1.doc" attr="" comment="" date="1259824778" name="Commentary_on_the_LGS_WFS_design_Gavel_response_v1.doc" path="Commentary_on_the_LGS_WFS_design_Gavel_response_v1.doc" size="25088" stream="Commentary_on_the_LGS_WFS_design_Gavel_response_v1.doc" user="Main.RichardDekany" version="1"

Revision 52009-11-25 - RichardDekany

Line: 1 to 1
 
META TOPICPARENT name="WFS"

Keck NGAO PD Phase LGS WFS Mini-Review

Line: 16 to 16
 

Input materials

Changed:
<
<
>
>
 
Line: 39 to 39
 
META FILEATTACHMENT attachment="091207_LGS_WFS_Mini-Review_Charge_v2.pdf" attr="" comment="" date="1258750611" name="091207_LGS_WFS_Mini-Review_Charge_v2.pdf" path="091207 LGS WFS Mini-Review Charge v2.pdf" size="72535" stream="091207 LGS WFS Mini-Review Charge v2.pdf" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attachment="091207_LGS_WFS_PD_Risk_Register_v1.pdf" attr="" comment="" date="1258867078" name="091207_LGS_WFS_PD_Risk_Register_v1.pdf" path="091207 LGS WFS PD Risk Register v1.pdf" size="100565" stream="091207 LGS WFS PD Risk Register v1.pdf" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attachment="1.2.7-LGS_WFS_Functional_Requirements_091121_v2.pdf" attr="" comment="" date="1258867843" name="1.2.7-LGS_WFS_Functional_Requirements_091121_v2.pdf" path="1.2.7-LGS WFS Functional Requirements 091121 v2.pdf" size="27663" stream="1.2.7-LGS WFS Functional Requirements 091121 v2.pdf" user="Main.RichardDekany" version="1"
Changed:
<
<
META FILEATTACHMENT attachment="LGS_WFS_PDR_KAON_rev0_8_RD.pdf" attr="" comment="" date="1258959987" name="LGS_WFS_PDR_KAON_rev0_8_RD.pdf" path="LGS_WFS_PDR_KAON_rev0_8_RD.pdf" size="1963220" stream="LGS_WFS_PDR_KAON_rev0_8_RD.pdf" user="Main.RichardDekany" version="1"
>
>
META FILEATTACHMENT attachment="LGS_WFS_PDR_KAON_v1_0.pdf" attr="" comment="" date="1259137491" name="LGS_WFS_PDR_KAON_v1_0.pdf" path="LGS_WFS_PDR_KAON_v1_0.pdf" size="2907167" stream="LGS_WFS_PDR_KAON_v1_0.pdf" user="Main.RichardDekany" version="1"

Revision 42009-11-23 - RichardDekany

Line: 1 to 1
 
META TOPICPARENT name="WFS"

Keck NGAO PD Phase LGS WFS Mini-Review

Line: 16 to 16
 

Input materials

Changed:
<
<
  • Design Document (KAON XXX)
>
>
 
Line: 39 to 39
 
META FILEATTACHMENT attachment="091207_LGS_WFS_Mini-Review_Charge_v2.pdf" attr="" comment="" date="1258750611" name="091207_LGS_WFS_Mini-Review_Charge_v2.pdf" path="091207 LGS WFS Mini-Review Charge v2.pdf" size="72535" stream="091207 LGS WFS Mini-Review Charge v2.pdf" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attachment="091207_LGS_WFS_PD_Risk_Register_v1.pdf" attr="" comment="" date="1258867078" name="091207_LGS_WFS_PD_Risk_Register_v1.pdf" path="091207 LGS WFS PD Risk Register v1.pdf" size="100565" stream="091207 LGS WFS PD Risk Register v1.pdf" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attachment="1.2.7-LGS_WFS_Functional_Requirements_091121_v2.pdf" attr="" comment="" date="1258867843" name="1.2.7-LGS_WFS_Functional_Requirements_091121_v2.pdf" path="1.2.7-LGS WFS Functional Requirements 091121 v2.pdf" size="27663" stream="1.2.7-LGS WFS Functional Requirements 091121 v2.pdf" user="Main.RichardDekany" version="1"
Added:
>
>
META FILEATTACHMENT attachment="LGS_WFS_PDR_KAON_rev0_8_RD.pdf" attr="" comment="" date="1258959987" name="LGS_WFS_PDR_KAON_rev0_8_RD.pdf" path="LGS_WFS_PDR_KAON_rev0_8_RD.pdf" size="1963220" stream="LGS_WFS_PDR_KAON_rev0_8_RD.pdf" user="Main.RichardDekany" version="1"

Revision 32009-11-22 - RichardDekany

Line: 1 to 1
 
META TOPICPARENT name="WFS"

Keck NGAO PD Phase LGS WFS Mini-Review

Line: 17 to 17
 

Input materials

Changed:
<
<
  • Requirements Compliance Matrix
>
>
 
  • Response To Reviewer Comments

Agenda (Draft) - All times PST

Line: 35 to 36
 
Deleted:
<
<
 
META FILEATTACHMENT attachment="091207_LGS_WFS_Mini-Review_Charge_v2.pdf" attr="" comment="" date="1258750611" name="091207_LGS_WFS_Mini-Review_Charge_v2.pdf" path="091207 LGS WFS Mini-Review Charge v2.pdf" size="72535" stream="091207 LGS WFS Mini-Review Charge v2.pdf" user="Main.RichardDekany" version="1"
Added:
>
>
META FILEATTACHMENT attachment="091207_LGS_WFS_PD_Risk_Register_v1.pdf" attr="" comment="" date="1258867078" name="091207_LGS_WFS_PD_Risk_Register_v1.pdf" path="091207 LGS WFS PD Risk Register v1.pdf" size="100565" stream="091207 LGS WFS PD Risk Register v1.pdf" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attachment="1.2.7-LGS_WFS_Functional_Requirements_091121_v2.pdf" attr="" comment="" date="1258867843" name="1.2.7-LGS_WFS_Functional_Requirements_091121_v2.pdf" path="1.2.7-LGS WFS Functional Requirements 091121 v2.pdf" size="27663" stream="1.2.7-LGS WFS Functional Requirements 091121 v2.pdf" user="Main.RichardDekany" version="1"

Revision 22009-11-20 - RichardDekany

Line: 1 to 1
 
META TOPICPARENT name="WFS"

Keck NGAO PD Phase LGS WFS Mini-Review

Changed:
<
<
10:00a - 01:00p PDT
08:00a - 11:00a HST
>
>
10:00a - 02:00p PDT
08:00a - 12:00p HST
 
Monday, December 7, 2009
Tele/Videoconference
Line: 15 to 15
 Minutes and Action Items:

Input materials

Changed:
<
<
  • Charge to Reviewers
>
>
 
  • Design Document (KAON XXX)
  • Requirements Compliance Matrix
  • Response To Reviewer Comments
Changed:
<
<

Agenda (Draft)

  • 10:00 am PST Introduction (Dekany)
  • 10:20 am PST Optical (Velur)
  • 11:20 am PST Mechanical (Delacroix)
  • 12:20 pm PST Conclusion (Dekany)
  • 12:40 pm PST General discussion (All)
  • 01:00 pm PST Review Committee discussion
  • 01:30 pm PST Debrief and Recommendations
  • 02:00 pm PST Adjourn
>
>

Agenda (Draft) - All times PST

  • 10:00 a Requirements (Dekany)
  • 10:30 a Optical (Velur)
  • 11:00 a Mechanical (Delacroix)
  • 11:30 a Conclusion (Dekany)
  • 11:40 a Break
  • 11:50 a General discussion (All)
  • 12:10 p Review Committee discussion
  • 12:40 p Debrief and Recommendations
  • 01:00 p Adjourn
 

Helpful Links

Added:
>
>

META FILEATTACHMENT attachment="091207_LGS_WFS_Mini-Review_Charge_v2.pdf" attr="" comment="" date="1258750611" name="091207_LGS_WFS_Mini-Review_Charge_v2.pdf" path="091207 LGS WFS Mini-Review Charge v2.pdf" size="72535" stream="091207 LGS WFS Mini-Review Charge v2.pdf" user="Main.RichardDekany" version="1"

Revision 12009-11-19 - RichardDekany

Line: 1 to 1
Added:
>
>
META TOPICPARENT name="WFS"

Keck NGAO PD Phase LGS WFS Mini-Review

10:00a - 01:00p PDT
08:00a - 11:00a HST
Monday, December 7, 2009
Tele/Videoconference

Dial-in Number: 877-280-4645 Passcode: 540030
Videoconference IP: TBD


*In effigie (e.g. on the phone or video): Dekany, Delacroix, Gavel (Chair), Lockwood (Reviewer), Max, Stalcup (Reviewer), Velur, Wizinowich

Minutes and Action Items:

Input materials

  • Charge to Reviewers
  • Design Document (KAON XXX)
  • Requirements Compliance Matrix
  • Response To Reviewer Comments

Agenda (Draft)

  • 10:00 am PST Introduction (Dekany)
  • 10:20 am PST Optical (Velur)
  • 11:20 am PST Mechanical (Delacroix)
  • 12:20 pm PST Conclusion (Dekany)
  • 12:40 pm PST General discussion (All)
  • 01:00 pm PST Review Committee discussion
  • 01:30 pm PST Debrief and Recommendations
  • 02:00 pm PST Adjourn