Difference: SingleLGS (1 vs. 14)

Revision 142010-12-01 - ChrisNeyman

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Reduced Focal Anisoplanatism Error Demonstration at Keck

Line: 27 to 27
 

References

Changed:
<
<
>
>
 

Simulation and Analysis

  • Reduced FA with Cn2 measurements

Revision 132010-11-08 - ChrisNeyman

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Reduced Focal Anisoplanatism Error Demonstration at Keck

Line: 13 to 13
 

Meeting Minutes & Actions

Action Assigned Comments Due Date
Changed:
<
<
Document intial Simulations Chris from LAOS circa 2006 11/18/2010
>
>
Document intial Simulations Chris from LAOS circa 2006 Done
 
Check Keck Bayesian vs MVE Brent Essentially the same Done
Initial Round of Simulations Chris Is Cn2 or POLC more important 9/17/2010
Present results in revised units Brent nm rms and Effective FA Done

Revision 122010-11-08 - ChrisNeyman

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Reduced Focal Anisoplanatism Error Demonstration at Keck

Line: 14 to 14
 
Action Assigned Comments Due Date
Document intial Simulations Chris from LAOS circa 2006 11/18/2010
Changed:
<
<
Check Keck Bayesian vs MVE Brent   11/19/2010
>
>
Check Keck Bayesian vs MVE Brent Essentially the same Done
 
Initial Round of Simulations Chris Is Cn2 or POLC more important 9/17/2010
Present results in revised units Brent nm rms and Effective FA Done
Cost & Schedule for testing with K2 AO Chris Closed loop MVE only Done

Revision 112010-11-05 - ChrisNeyman

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Reduced Focal Anisoplanatism Error Demonstration at Keck

Line: 13 to 13
 

Meeting Minutes & Actions

Action Assigned Comments Due Date
Changed:
<
<
Present results in revised units Brent nm rms and Effective FA 10/30/2010
Cost & Schedule for testing with K2 AO Chris Closed loop MVE only 10/30/2010
>
>
Document intial Simulations Chris from LAOS circa 2006 11/18/2010
Check Keck Bayesian vs MVE Brent   11/19/2010
 
Initial Round of Simulations Chris Is Cn2 or POLC more important 9/17/2010
Changed:
<
<
Microgate estimate for RTC mods Chris/Peter Estimate only not a formal proposal 11/18/2010
>
>
Present results in revised units Brent nm rms and Effective FA Done
Cost & Schedule for testing with K2 AO Chris Closed loop MVE only Done
 
Next Meeting in 4 weeks ALL Exchange emails as needed, before date TBD

Meeting 1 August 20, 2010 Link
Changed:
<
<
Meeting 2 October 1, 2010 Link
>
>
Meeting 2 October 1, 2010 Link
Meeting 3 November 5, 2010 Link
 

References

Line: 65 to 67
 
META FILEATTACHMENT attachment="reconproc.pro" attr="h" comment="IDL reconstuctor tool" date="1285717443" name="reconproc.pro" path="reconproc.pro" size="30218" stream="reconproc.pro" user="Main.ChrisNeyman" version="1"
META FILEATTACHMENT attachment="benchmark_recon.txt" attr="h" comment="Summary IDL code profiler report" date="1285803013" name="benchmark_recon.txt" path="benchmark_recon.txt" size="1615" stream="benchmark_recon.txt" user="Main.ChrisNeyman" version="2"
META FILEATTACHMENT attachment="Meeting2_Oct01_2010.doc" attr="h" comment="Meeting2: 3 Oct. 2010" date="1286246324" name="Meeting2_Oct01_2010.doc" path="Meeting2_Oct01_2010.doc" size="23040" stream="Meeting2_Oct01_2010.doc" user="Main.ChrisNeyman" version="1"
Added:
>
>
META FILEATTACHMENT attachment="Meeting3_Nov05_2010.doc" attr="h" comment="Meeting 3 Nov 5 2010" date="1288992094" name="Meeting3_Nov05_2010.doc" path="Meeting3_Nov05_2010.doc" size="27136" stream="Meeting3_Nov05_2010.doc" user="Main.ChrisNeyman" version="1"

Revision 102010-11-03 - ChrisNeyman

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Reduced Focal Anisoplanatism Error Demonstration at Keck

Line: 46 to 46
 

Milestones

Milestone Date Comments
Changed:
<
<
Requirement Review 12/31/2112
>
>
Requirement Review TBD
 

Project Management

Changed:
<
<
  • WBS Description
  • Schedule
>
>
  • WBS Description (TBD)
  • Schedule (TBD)
 

Revision 92010-10-05 - ChrisNeyman

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Reduced Focal Anisoplanatism Error Demonstration at Keck

Line: 13 to 13
 

Meeting Minutes & Actions

Action Assigned Comments Due Date
Added:
>
>
Present results in revised units Brent nm rms and Effective FA 10/30/2010
Cost & Schedule for testing with K2 AO Chris Closed loop MVE only 10/30/2010
 
Initial Round of Simulations Chris Is Cn2 or POLC more important 9/17/2010
Deleted:
<
<
Convert RATFOR code to MATLAB Brent Done for Single LGS/NGS 10/1/2010
Draft Obs. Plan Rich First Draft Aug-24 10/1/2010
Benchmark Keck IDL recon.pro Chris Done: see analysis below 9/17/2010
 
Microgate estimate for RTC mods Chris/Peter Estimate only not a formal proposal 11/18/2010
Next Meeting in 4 weeks ALL Exchange emails as needed, before date TBD
Changed:
<
<
Meeting 1 August 20, 2010 Link
>
>
Meeting 1 August 20, 2010 Link
Meeting 2 October 1, 2010 Link
 

References

Line: 59 to 58
 
META FILEATTACHMENT attachment="Ellerbroek_JOSAA_1994a.pdf" attr="" comment="Ellerbroek JOSA A 1994, Constrained Min. Variance" date="1282350638" name="Ellerbroek_JOSAA_1994a.pdf" path="Ellerbroek_JOSAA_1994a.pdf" size="2943467" stream="Ellerbroek_JOSAA_1994a.pdf" user="Main.ChrisNeyman" version="1"
META FILEATTACHMENT attachment="vanDam_SPIE_2010_ModelingGMTAO.pdf" attr="" comment="van Dam SPIE 2010" date="1282351048" name="vanDam_SPIE_2010_ModelingGMTAO.pdf" path="vanDam_SPIE_2010_ModelingGMTAO.pdf" size="247383" stream="vanDam_SPIE_2010_ModelingGMTAO.pdf" user="Main.ChrisNeyman" version="1"
Changed:
<
<
META FILEATTACHMENT attachment="Meeting1_Aug20_2010.doc" attr="" comment="Minutes Meeting 1" date="1282353133" name="Meeting1_Aug20_2010.doc" path="Meeting1_Aug20_2010.doc" size="28160" stream="Meeting1_Aug20_2010.doc" user="Main.ChrisNeyman" version="1"
>
>
META FILEATTACHMENT attachment="Meeting1_Aug20_2010.doc" attr="h" comment="Meeting 1: 20 august 2010" date="1286245235" name="Meeting1_Aug20_2010.doc" path="Meeting1_Aug20_2010.doc" size="28160" stream="Meeting1_Aug20_2010.doc" user="Main.ChrisNeyman" version="1"
 
META FILEATTACHMENT attachment="Cn2_optimal_LGS_reconstructors_V0.1" attr="" comment="" date="1282695030" name="Cn2_optimal_LGS_reconstructors_V0.1" path="Cn2_optimal_LGS_reconstructors_V0.1" size="73728" stream="Cn2_optimal_LGS_reconstructors_V0.1" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attachment="Cn2_optimal_LGS_reconstructors_V0_1.doc" attr="" comment="" date="1282760030" name="Cn2_optimal_LGS_reconstructors_V0_1.doc" path="Cn2_optimal_LGS_reconstructors_V0_1.doc" size="73216" stream="Cn2_optimal_LGS_reconstructors_V0_1.doc" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attachment="report_recon.txt" attr="h" comment="Summary IDL code profiler report" date="1285717420" name="report_recon.txt" path="report_recon.txt" size="5178" stream="report_recon.txt" user="Main.ChrisNeyman" version="1"
META FILEATTACHMENT attachment="reconproc.pro" attr="h" comment="IDL reconstuctor tool" date="1285717443" name="reconproc.pro" path="reconproc.pro" size="30218" stream="reconproc.pro" user="Main.ChrisNeyman" version="1"
META FILEATTACHMENT attachment="benchmark_recon.txt" attr="h" comment="Summary IDL code profiler report" date="1285803013" name="benchmark_recon.txt" path="benchmark_recon.txt" size="1615" stream="benchmark_recon.txt" user="Main.ChrisNeyman" version="2"
Added:
>
>
META FILEATTACHMENT attachment="Meeting2_Oct01_2010.doc" attr="h" comment="Meeting2: 3 Oct. 2010" date="1286246324" name="Meeting2_Oct01_2010.doc" path="Meeting2_Oct01_2010.doc" size="23040" stream="Meeting2_Oct01_2010.doc" user="Main.ChrisNeyman" version="1"

Revision 82010-10-01 - ChrisNeyman

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Reduced Focal Anisoplanatism Error Demonstration at Keck

Line: 14 to 14
 
Action Assigned Comments Due Date
Initial Round of Simulations Chris Is Cn2 or POLC more important 9/17/2010
Changed:
<
<
Convert RATFOR code to MATLAB Brent 6 Wks, Report if feasible or not in 2 Wks 10/1/2010
>
>
Convert RATFOR code to MATLAB Brent Done for Single LGS/NGS 10/1/2010
 
Draft Obs. Plan Rich First Draft Aug-24 10/1/2010
Benchmark Keck IDL recon.pro Chris Done: see analysis below 9/17/2010
Microgate estimate for RTC mods Chris/Peter Estimate only not a formal proposal 11/18/2010

Revision 72010-09-29 - ChrisNeyman

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Reduced Focal Anisoplanatism Error Demonstration at Keck

Line: 64 to 64
 
META FILEATTACHMENT attachment="Cn2_optimal_LGS_reconstructors_V0_1.doc" attr="" comment="" date="1282760030" name="Cn2_optimal_LGS_reconstructors_V0_1.doc" path="Cn2_optimal_LGS_reconstructors_V0_1.doc" size="73216" stream="Cn2_optimal_LGS_reconstructors_V0_1.doc" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attachment="report_recon.txt" attr="h" comment="Summary IDL code profiler report" date="1285717420" name="report_recon.txt" path="report_recon.txt" size="5178" stream="report_recon.txt" user="Main.ChrisNeyman" version="1"
META FILEATTACHMENT attachment="reconproc.pro" attr="h" comment="IDL reconstuctor tool" date="1285717443" name="reconproc.pro" path="reconproc.pro" size="30218" stream="reconproc.pro" user="Main.ChrisNeyman" version="1"
Added:
>
>
META FILEATTACHMENT attachment="benchmark_recon.txt" attr="h" comment="Summary IDL code profiler report" date="1285803013" name="benchmark_recon.txt" path="benchmark_recon.txt" size="1615" stream="benchmark_recon.txt" user="Main.ChrisNeyman" version="2"

Revision 62010-09-28 - ChrisNeyman

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Reduced Focal Anisoplanatism Error Demonstration at Keck

Line: 16 to 16
 
Initial Round of Simulations Chris Is Cn2 or POLC more important 9/17/2010
Convert RATFOR code to MATLAB Brent 6 Wks, Report if feasible or not in 2 Wks 10/1/2010
Draft Obs. Plan Rich First Draft Aug-24 10/1/2010
Changed:
<
<
Benchmark Keck IDL recon.pro Chris Alpha Parameter, Pupil rotation, Zenith Blind Spot 9/17/2010
>
>
Benchmark Keck IDL recon.pro Chris Done: see analysis below 9/17/2010
 
Microgate estimate for RTC mods Chris/Peter Estimate only not a formal proposal 11/18/2010
Next Meeting in 4 weeks ALL Exchange emails as needed, before date TBD
Changed:
<
<

Meeting 1 August 20, 2010 Link

>
>
Meeting 1 August 20, 2010 Link
 

References

Line: 37 to 38
 

Analysis and Reports

Added:
>
>
Performance of Current Keck Reconstructor
 

Milestones

Line: 56 to 62
 
META FILEATTACHMENT attachment="Meeting1_Aug20_2010.doc" attr="" comment="Minutes Meeting 1" date="1282353133" name="Meeting1_Aug20_2010.doc" path="Meeting1_Aug20_2010.doc" size="28160" stream="Meeting1_Aug20_2010.doc" user="Main.ChrisNeyman" version="1"
META FILEATTACHMENT attachment="Cn2_optimal_LGS_reconstructors_V0.1" attr="" comment="" date="1282695030" name="Cn2_optimal_LGS_reconstructors_V0.1" path="Cn2_optimal_LGS_reconstructors_V0.1" size="73728" stream="Cn2_optimal_LGS_reconstructors_V0.1" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attachment="Cn2_optimal_LGS_reconstructors_V0_1.doc" attr="" comment="" date="1282760030" name="Cn2_optimal_LGS_reconstructors_V0_1.doc" path="Cn2_optimal_LGS_reconstructors_V0_1.doc" size="73216" stream="Cn2_optimal_LGS_reconstructors_V0_1.doc" user="Main.RichardDekany" version="1"
Added:
>
>
META FILEATTACHMENT attachment="report_recon.txt" attr="h" comment="Summary IDL code profiler report" date="1285717420" name="report_recon.txt" path="report_recon.txt" size="5178" stream="report_recon.txt" user="Main.ChrisNeyman" version="1"
META FILEATTACHMENT attachment="reconproc.pro" attr="h" comment="IDL reconstuctor tool" date="1285717443" name="reconproc.pro" path="reconproc.pro" size="30218" stream="reconproc.pro" user="Main.ChrisNeyman" version="1"

Revision 52010-08-25 - RichardDekany

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Reduced Focal Anisoplanatism Error Demonstration at Keck

Line: 34 to 34
 
  • Other

Observing Experiment Plans

Changed:
<
<
>
>
 

Analysis and Reports

Line: 56 to 55
 
META FILEATTACHMENT attachment="vanDam_SPIE_2010_ModelingGMTAO.pdf" attr="" comment="van Dam SPIE 2010" date="1282351048" name="vanDam_SPIE_2010_ModelingGMTAO.pdf" path="vanDam_SPIE_2010_ModelingGMTAO.pdf" size="247383" stream="vanDam_SPIE_2010_ModelingGMTAO.pdf" user="Main.ChrisNeyman" version="1"
META FILEATTACHMENT attachment="Meeting1_Aug20_2010.doc" attr="" comment="Minutes Meeting 1" date="1282353133" name="Meeting1_Aug20_2010.doc" path="Meeting1_Aug20_2010.doc" size="28160" stream="Meeting1_Aug20_2010.doc" user="Main.ChrisNeyman" version="1"
META FILEATTACHMENT attachment="Cn2_optimal_LGS_reconstructors_V0.1" attr="" comment="" date="1282695030" name="Cn2_optimal_LGS_reconstructors_V0.1" path="Cn2_optimal_LGS_reconstructors_V0.1" size="73728" stream="Cn2_optimal_LGS_reconstructors_V0.1" user="Main.RichardDekany" version="1"
Added:
>
>
META FILEATTACHMENT attachment="Cn2_optimal_LGS_reconstructors_V0_1.doc" attr="" comment="" date="1282760030" name="Cn2_optimal_LGS_reconstructors_V0_1.doc" path="Cn2_optimal_LGS_reconstructors_V0_1.doc" size="73216" stream="Cn2_optimal_LGS_reconstructors_V0_1.doc" user="Main.RichardDekany" version="1"

Revision 42010-08-25 - ChrisNeyman

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Reduced Focal Anisoplanatism Error Demonstration at Keck

Line: 13 to 13
 

Meeting Minutes & Actions

Action Assigned Comments Due Date
Deleted:
<
<
Make this Web page Chris Done 8/20/2010
 
Initial Round of Simulations Chris Is Cn2 or POLC more important 9/17/2010
Convert RATFOR code to MATLAB Brent 6 Wks, Report if feasible or not in 2 Wks 10/1/2010
Changed:
<
<
Draft Obs. Plan Rich   10/1/2010
>
>
Draft Obs. Plan Rich First Draft Aug-24 10/1/2010
 
Benchmark Keck IDL recon.pro Chris Alpha Parameter, Pupil rotation, Zenith Blind Spot 9/17/2010
Microgate estimate for RTC mods Chris/Peter Estimate only not a formal proposal 11/18/2010
Next Meeting in 4 weeks ALL Exchange emails as needed, before date TBD

Revision 32010-08-25 - RichardDekany

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Reduced Focal Anisoplanatism Error Demonstration at Keck

Line: 34 to 34
 
  • NGS TT Sharpening
  • Other
Changed:
<
<

Observation Plans, Analysis and Reports

  • Test Plans
>
>

Observing Experiment Plans

Analysis and Reports

 

Milestones

Line: 53 to 56
 
META FILEATTACHMENT attachment="Ellerbroek_JOSAA_1994a.pdf" attr="" comment="Ellerbroek JOSA A 1994, Constrained Min. Variance" date="1282350638" name="Ellerbroek_JOSAA_1994a.pdf" path="Ellerbroek_JOSAA_1994a.pdf" size="2943467" stream="Ellerbroek_JOSAA_1994a.pdf" user="Main.ChrisNeyman" version="1"
META FILEATTACHMENT attachment="vanDam_SPIE_2010_ModelingGMTAO.pdf" attr="" comment="van Dam SPIE 2010" date="1282351048" name="vanDam_SPIE_2010_ModelingGMTAO.pdf" path="vanDam_SPIE_2010_ModelingGMTAO.pdf" size="247383" stream="vanDam_SPIE_2010_ModelingGMTAO.pdf" user="Main.ChrisNeyman" version="1"
META FILEATTACHMENT attachment="Meeting1_Aug20_2010.doc" attr="" comment="Minutes Meeting 1" date="1282353133" name="Meeting1_Aug20_2010.doc" path="Meeting1_Aug20_2010.doc" size="28160" stream="Meeting1_Aug20_2010.doc" user="Main.ChrisNeyman" version="1"
Added:
>
>
META FILEATTACHMENT attachment="Cn2_optimal_LGS_reconstructors_V0.1" attr="" comment="" date="1282695030" name="Cn2_optimal_LGS_reconstructors_V0.1" path="Cn2_optimal_LGS_reconstructors_V0.1" size="73728" stream="Cn2_optimal_LGS_reconstructors_V0.1" user="Main.RichardDekany" version="1"

Revision 22010-08-23 - ChrisNeyman

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Reduced Focal Anisoplanatism Error Demonstration at Keck

Line: 8 to 8
 
  • Software: Kevin Tsubota

Goal

Changed:
<
<
This is a proof of concept demonstration identified as a NGAO Detailed Design Risk Reduction task. It also has potential benifit to existing AO systems at Keck and elsewhere. Use Cn2 information to reduced Focal Anisoplanatism Error. We will also consider other types of innovative single LGS reconstructors.

References

>
>
This is a proof of concept demonstration identified as a NGAO Detailed Design Risk Reduction task. It also has potential benefit to existing AO systems at Keck and elsewhere. Use Cn2 information to reduced Focal Anisoplanatism Error. We will also consider other types of innovative single LGS reconstructors.
 

Meeting Minutes & Actions

Action Assigned Comments Due Date
Make this Web page Chris Done 8/20/2010
Changed:
<
<
Intial Round of Simulations Chris Is Cn2 or POLC more important 9/17/2010
Convert RATFOR code to MATLAB Brent 6 Wks, feasible or not in 2 Wks 10/1/2010
>
>
Initial Round of Simulations Chris Is Cn2 or POLC more important 9/17/2010
Convert RATFOR code to MATLAB Brent 6 Wks, Report if feasible or not in 2 Wks 10/1/2010
 
Draft Obs. Plan Rich   10/1/2010
Benchmark Keck IDL recon.pro Chris Alpha Parameter, Pupil rotation, Zenith Blind Spot 9/17/2010
Microgate estimate for RTC mods Chris/Peter Estimate only not a formal proposal 11/18/2010
Next Meeting in 4 weeks ALL Exchange emails as needed, before date TBD
Changed:
<
<
  • Meeting 1 August 20, 2010 Link
>
>

Meeting 1 August 20, 2010 Link

References

 

Simulation and Analysis

  • Reduced FA with Cn2 measurements

Revision 12010-08-21 - ChrisNeyman

Line: 1 to 1
Added:
>
>
META TOPICPARENT name="WebHome"

Reduced Focal Anisoplanatism Error Demonstration at Keck

Team

  • Lead: Chris Neyman
  • Scientific Team: Peter Wizinowich, Rich Dekany, Don Gavel, Brent Ellerbroek(TMT).
  • Software: Kevin Tsubota

Goal

This is a proof of concept demonstration identified as a NGAO Detailed Design Risk Reduction task. It also has potential benifit to existing AO systems at Keck and elsewhere. Use Cn2 information to reduced Focal Anisoplanatism Error. We will also consider other types of innovative single LGS reconstructors.

References

Meeting Minutes & Actions

Action Assigned Comments Due Date
Make this Web page Chris Done 8/20/2010
Intial Round of Simulations Chris Is Cn2 or POLC more important 9/17/2010
Convert RATFOR code to MATLAB Brent 6 Wks, feasible or not in 2 Wks 10/1/2010
Draft Obs. Plan Rich   10/1/2010
Benchmark Keck IDL recon.pro Chris Alpha Parameter, Pupil rotation, Zenith Blind Spot 9/17/2010
Microgate estimate for RTC mods Chris/Peter Estimate only not a formal proposal 11/18/2010
Next Meeting in 4 weeks ALL Exchange emails as needed, before date TBD

  • Meeting 1 August 20, 2010 Link

Simulation and Analysis

  • Reduced FA with Cn2 measurements
  • NGS TT Sharpening
  • Other

Observation Plans, Analysis and Reports

  • Test Plans

Milestones

Milestone Date Comments
Requirement Review 12/31/2112

Project Management

  • WBS Description
  • Schedule

-- ChrisNeyman - 20 Aug 2010

META FILEATTACHMENT attachment="Ellerbroek_JOSAA_1994a.pdf" attr="" comment="Ellerbroek JOSA A 1994, Constrained Min. Variance" date="1282350638" name="Ellerbroek_JOSAA_1994a.pdf" path="Ellerbroek_JOSAA_1994a.pdf" size="2943467" stream="Ellerbroek_JOSAA_1994a.pdf" user="Main.ChrisNeyman" version="1"
META FILEATTACHMENT attachment="vanDam_SPIE_2010_ModelingGMTAO.pdf" attr="" comment="van Dam SPIE 2010" date="1282351048" name="vanDam_SPIE_2010_ModelingGMTAO.pdf" path="vanDam_SPIE_2010_ModelingGMTAO.pdf" size="247383" stream="vanDam_SPIE_2010_ModelingGMTAO.pdf" user="Main.ChrisNeyman" version="1"
META FILEATTACHMENT attachment="Meeting1_Aug20_2010.doc" attr="" comment="Minutes Meeting 1" date="1282353133" name="Meeting1_Aug20_2010.doc" path="Meeting1_Aug20_2010.doc" size="28160" stream="Meeting1_Aug20_2010.doc" user="Main.ChrisNeyman" version="1"
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2020 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback