r24 - 28 Feb 2007 - 21:35:30 - PeterWizinowichYou are here: TWiki >  Keck/NGAO Web > 061114_CIT_NGAO_Meeting_2

Keck NGAO Team Meeting #2>

8:30a - 5:30p
Tuesday, November 14, 2006
012 Robinson Laboratory, Caltech (moved to 023)
Telecon attendees: 877-280-4645 passcode 540030

Directions: Getting to Caltech (.html) and Caltech campus map (.pdf)


In propria persona: Adkins, Bouchez, Cameron (am), Dekany, Gavel, Ireland (am), Max, Moore, Neyman, Velur, Wizinowich
In effigie (e.g. on the phone): Bauman (potential), Flicker, Johannson, Le Mignant, Liu, Marchis

Action Items from the meeting. Status of Action Items as of 2/28/07.

Goals:

  • Introduce team structure and responsibilities
  • Review System Requirements Document (Release 1)
  • Review key drivers for each of the NGAO performance and efficiency budgets
  • Review recent trade studies
  • Review Keck Interferometer requirements (N.B. these are not (yet) NGAO requirements imposed by KI)
  • Review instrumentation study strategy for NGAO system design phase

Agenda:

  • 8:00 am Refreshments
  • 8:30 am Welcome and Team Introductions (All)
  • 9:00 am Management Report (Wizinowich) Management Report.ppt
    • Review study overall progress, progress against milestones, and summary financial situation
  • 9:30 am Science Requirements Document (Release 1) (Max) NGAO_SRD_Release1_v3-print.pdf Max_ScienceRequirements_v1a.ppt Max_ScienceRequirements_v1.ppt PerformanceRequirements_v2.xls
    • From the SD SEMP: The SRD describes the new system in terms of the needed scientific and technical performance. The document also expresses specific requirements for implementation or design where those requirements are essential to satisfactory integration and interoperation of the new system with other observatory systems.
    • Review changes to science requirements contained in SRD (Release 1) compared to June NGAO proposal
    • Discuss science / engineering team interactions
  • 10:30 am Break
  • 10:45 am Key Performance Drivers (Dekany) Perf_budget_dev_rgd.ppt (.pdf)
    • Review the NGAO Required Observing Modes
    • Review the key architecture and technology drivers for each of the 6 Performance and 2 Efficiency Budgets
        • Astrometric Accuracy (Cameron)
        • Background and Sensitivity (Bouchez)
        • Encircled Energy (Gavel)
        • High-Contrast (Macintosh)
        • Photometric Precision (Britton)
        • Polarimetric Precision (Ireland)
        • Wavefront Error (Dekany)
        • Observing Efficiency (LeMignant)
        • Observing Uptime (Johansson) Uptime budget presentation
  • 12:15 pm Box Lunch (provided)
  • 1:00 pm Trade Study Report: LGS Asterism Geometry and Size (Flicker) TS-tomo.pdf
    • From the WBS Dictionary: Find the simplest LGS asterism geometry meeting the performance budget goals (e.g. quincunx, ring, 1+triangle, or hex) and the asterism radii. Consider optimization of the Strehl of the tip/tilt stars and the resultant sky coverage as well. Complete when LGS asterism, HO WFS, and LO WFS requirements have been documented.
  • 1:30 pm Trade Study Report: Fixed vs. Variable LGS Asterism (Velur) NGAO_m2_VFA_final.ppt
    • From the WBS DIctionary: Consider the cost/benefit of continually varying the LGS asterism radius vs. a fixed number of radii (e.g. 5", 25", 50"). Complete when LGS asterism requirements have been documented.
  • 2:00 pm Keck Interferometry Requirements (Neyman) KI_req_NGAO_crn.ppt
    • Review the KI requirements on delivered wavefront, including wavefront error and polarization
  • 2:30 pm NGAO Instrument Study Strategy (Adkins) NGAO Instrumentation.ppt NGAO Instruments Working Group.pdf
    • Review the strategy, scope, organization, and expectations for instrument "proposal-level" development within the NGAO system design phase
    • Discuss science /engineering team interactions
    • Review schedule for initial NGAO instrument concepts (proposed:)
      • Near-infrared Imager
      • Visible Imager
      • Deployable Near-Infrared IFU Spectrograph
    • Review scope of upcoming Trade Study: Science Instrument Reuse
  • 3:45 Break
  • 4:00 Discussion: Upcoming tasks and milestones (Wizinowich) .ppt
  • 4:30 General Discussion (All)
  • 5:30 Adjourn

  • Evening NGAO Dinner in Old Town Pasadena (6:30p)
    • Akbar Cuisine of India ($20) (Wizinowich, Neyman, Dekany, Moore)
    • Gaucho Grill (Argentinian) ($20) (vote here)
    • Il Fornaio (Italian) ($30) (vote here)
    • Twin Palms (Californian) ($40) (vote here)

Topic attachments
I Attachment Action Size Date Who Comment
pptppt KI_req_NGAO_crn.ppt manage 3290.0 K 11 Nov 2006 - 18:23 ChrisNeyman Interferometer requirements for NGAO
pptppt Max_ScienceRequirements_v1.ppt manage 2452.0 K 14 Nov 2006 - 06:59 ClaireMax  
pptppt Max_ScienceRequirements_v1a.ppt manage 2452.5 K 14 Nov 2006 - 18:00 ClaireMax  
docdoc Meeting_2_Action_Items.doc manage 28.5 K 16 Nov 2006 - 01:59 PeterWizinowich Action items from Meeting 2
docdoc Meeting_2_Action_Items_Status.doc manage 32.0 K 28 Feb 2007 - 21:35 PeterWizinowich Status of action items (2/28/07)
pptppt Minimum_Variance_Wavefront_Reconstruction.ppt manage 204.0 K 14 Nov 2006 - 21:33 DonaldGavel  
pptppt NGAO_Instrumentation_Version_1.ppt manage 221.0 K 13 Nov 2006 - 01:11 PeterWizinowich NGAO Instrumentation report from Adkins for meeting 2.
pdfpdf NGAO_SRD_Release1_v3-print.pdf manage 1139.1 K 13 Nov 2006 - 23:49 ClaireMax  
pptppt NGAO_m2_VFA.ppt manage 883.0 K 14 Nov 2006 - 03:32 ViswaVelur latest version of variable vs. fixed asterism TS
pptppt NGAO_m2_VFA_final.ppt manage 880.5 K 14 Nov 2006 - 03:43 ViswaVelur  
pptppt NGAO_m2_vnv_rev2.ppt manage 680.5 K 13 Nov 2006 - 20:06 RichardDekany  
pptppt NGAO_meeting_#2_1106.ppt manage 396.5 K 13 Nov 2006 - 01:08 PeterWizinowich Management Report
pptppt NGAO_meeting_#2_1106_rgd_draft.ppt manage 334.5 K 13 Nov 2006 - 08:47 RichardDekany  
pdfpdf Perf_budget_dev_rgd.pdf manage 1073.2 K 14 Nov 2006 - 01:41 RichardDekany  
pptppt Perf_budget_dev_rgd.ppt manage 663.0 K 14 Nov 2006 - 01:33 RichardDekany  
pptppt Perf_budget_dev_rgd_draft.ppt manage 286.5 K 13 Nov 2006 - 08:59 RichardDekany  
xlsxls PerformanceRequirements_v2.xls manage 21.5 K 14 Nov 2006 - 07:02 ClaireMax  
pdfpdf TS-tomo.pdf manage 3075.3 K 13 Nov 2006 - 02:51 RalfFlicker LGS asterisms trade study report
pdfpdf The_NGAO_Instruments_Working_Group_revised.pdf manage 37.4 K 13 Nov 2006 - 01:12 PeterWizinowich NGAO Instruments Working Group proposal from Adkins.
pptppt uptime.ppt manage 112.0 K 14 Nov 2006 - 19:03 RichardDekany  
Edit | Attach | Printable | Raw View | Backlinks: Web, All Webs | History: r24 < r23 < r22 < r21 < r20 | More topic actions
 
Keck Next Generation Adaptive Optics
This site is powered by the TWiki collaboration platformCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback