NGAO Science Operations

Line: 9 to 9
 

1. Science Operations during the PD phase (from May 2008 till 2010)

Changed:
<
<
I start with more questions than answers for our planning. Here is a ppt file presenting my way to look at the process with many questions..
>
>
I start with more questions than answers for our planning. Here is a ppt file presenting my way to look at the process with many questions..
  Certainly, the main activities for the Science Operations will be:
  • Develop the Observing Scenarios. This is a task under WBS 3.1.2 (Science Observing Planning and Execution). The Observing scenarios and the Use Cases are captured in the Operations Concept Document (which is a deliverable of WBS 3.2 (Requirements).
Line: 17 to 17
 
  • Develop the Operations Sequences Architecture (WBS 3.4.4) which are likely to be derived from the Use Cases in the OCD. I am not sure yet whether the Operations Sequences Architecture will be included in the OCD.
  • Develop the design for the Multi-system Command Sequencer (WBS 6.1) and User Interfaces (WBS 6.2), etc
Changed:
<
<
META FILEATTACHMENT attachment="plan_my_mess.ppt" attr="" comment="" date="1217389300" name="plan_my_mess.ppt" path="plan_my_mess.ppt" size="108032" stream="plan_my_mess.ppt" user="Main.DavidLeMignant" version="1"
>
>
META FILEATTACHMENT attachment="plan_my_work.ppt" attr="" comment="" date="1219085580" name="plan_my_work.ppt" path="plan_my_work.ppt" size="116736" stream="plan_my_work.ppt" user="Main.DavidLeMignant" version="1"

Revision 42008-07-30 - DavidLeMignant

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

NGAO Science Operations

Line: 9 to 9
 

1. Science Operations during the PD phase (from May 2008 till 2010)

Added:
>
>
I start with more questions than answers for our planning. Here is a ppt file presenting my way to look at the process with many questions..
  Certainly, the main activities for the Science Operations will be:
  • Develop the Observing Scenarios. This is a task under WBS 3.1.2 (Science Observing Planning and Execution). The Observing scenarios and the Use Cases are captured in the Operations Concept Document (which is a deliverable of WBS 3.2 (Requirements).
  • Develop the Operations Sequences Architecture (WBS 3.4.4) which are likely to be derived from the Use Cases in the OCD. I am not sure yet whether the Operations Sequences Architecture will be included in the OCD.
  • Develop the design for the Multi-system Command Sequencer (WBS 6.1) and User Interfaces (WBS 6.2), etc
\ No newline at end of file
Added:
>
>
META FILEATTACHMENT attachment="plan_my_mess.ppt" attr="" comment="" date="1217389300" name="plan_my_mess.ppt" path="plan_my_mess.ppt" size="108032" stream="plan_my_mess.ppt" user="Main.DavidLeMignant" version="1"

Revision 32008-07-25 - DavidLeMignant

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

NGAO Science Operations

Line: 8 to 8
  Follow this link to access the Twiki page that presents the work & studies performed during the System Design phase for NGAO science operations.

1. Science Operations during the PD phase (from May 2008 till 2010)

Added:
>
>
Certainly, the main activities for the Science Operations will be:
  • Develop the Observing Scenarios. This is a task under WBS 3.1.2 (Science Observing Planning and Execution). The Observing scenarios and the Use Cases are captured in the Operations Concept Document (which is a deliverable of WBS 3.2 (Requirements).
  • Develop the Operations Sequences Architecture (WBS 3.4.4) which are likely to be derived from the Use Cases in the OCD. I am not sure yet whether the Operations Sequences Architecture will be included in the OCD.
  • Develop the design for the Multi-system Command Sequencer (WBS 6.1) and User Interfaces (WBS 6.2), etc
 \ No newline at end of file

Revision 22008-07-19 - DavidLeMignant

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

NGAO Science Operations

Changed:
<
<
Your comments are welcome on these documents. I am always looking for inputs and suggestions.. Ask me for the latest versions of the documents if needed.

0. Science Operations during the SD phase

>
>

0. Science Operations during the SD phase (up to April 2008)

  Follow this link to access the Twiki page that presents the work & studies performed during the System Design phase for NGAO science operations.

Changed:
<
<

1. Science Operations during the PD phase

>
>

1. Science Operations during the PD phase (from May 2008 till 2010)

Revision 12008-07-19 - DavidLeMignant

Line: 1 to 1
Added:
>
>
META TOPICPARENT name="WebHome"

NGAO Science Operations

Your comments are welcome on these documents. I am always looking for inputs and suggestions.. Ask me for the latest versions of the documents if needed.

0. Science Operations during the SD phase

Follow this link to access the Twiki page that presents the work & studies performed during the System Design phase for NGAO science operations.