Difference: SystemDesignPhasePlanning (1 vs. 94)

Revision 942008-02-21 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
This collection is for System Design Phase Planning and Tracking Documents
Line: 47 to 47
 
Added:
>
>
  NGAO Executive Committee Telecon Summaries:
Line: 163 to 164
 
META FILEATTACHMENT attachment="Project_Report_6.doc" attr="" comment="" date="1201918799" name="Project_Report_6.doc" path="V:\ngao system design\Project Reporting\Project Report 6.doc" size="216576" stream="V:\ngao system design\Project Reporting\Project Report 6.doc" user="Main.PeterWizinowich" version="2"
META FILEATTACHMENT attachment="NGAO_SD_schedule_v30_tracked.gif" attr="" comment="" date="1201904336" name="NGAO_SD_schedule_v30_tracked.gif" path="V:\ngao system design\SD Plans\NGAO SD schedule v30_tracked.mpp" size="1481216" stream="V:\ngao system design\SD Plans\NGAO SD schedule v30_tracked.mpp" user="Main.PeterWizinowich" version="2"
META FILEATTACHMENT attachment="NGAO_SD_schedule_v30_tracked.mpp" attr="" comment="" date="1201918760" name="NGAO_SD_schedule_v30_tracked.mpp" path="V:\ngao system design\SD Plans\NGAO SD schedule v30_tracked.mpp" size="1495040" stream="V:\ngao system design\SD Plans\NGAO SD schedule v30_tracked.mpp" user="Main.PeterWizinowich" version="2"
Added:
>
>
META FILEATTACHMENT attachment="SSC_NGAO_Report_0208.ppt" attr="" comment="" date="1203563164" name="SSC_NGAO_Report_0208.ppt" path="V:\ngao system design\Project Reporting\SSC NGAO Report 0208.ppt" size="2531840" stream="V:\ngao system design\Project Reporting\SSC NGAO Report 0208.ppt" user="Main.PeterWizinowich" version="1"

Revision 932008-02-02 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
This collection is for System Design Phase Planning and Tracking Documents
Line: 160 to 160
 
META FILEATTACHMENT attr="" autoattached="1" comment="Suggestion for Work Breakdown Structure - in org-chart format" date="1156543102" name="WBS_Architecture_DG_Aug2506.pdf" path="WBS_Architecture_DG_Aug2506.pdf" size="16915" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Replan version 24" date="1177439583" name="NGAO_SD_schedule_v24.mpp" path="NGAO_SD_schedule_v24.mpp" size="1205760" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Early draft, WBS structure unclear" date="1156449903" name="SD_phase_WBS_dictionary_v03.xls" path="SD_phase_WBS_dictionary_v03.xls" size="37376" user="Main.RichardDekany" version="1"
Changed:
<
<
META FILEATTACHMENT attachment="Project_Report_6.doc" attr="" comment="" date="1201903948" name="Project_Report_6.doc" path="V:\ngao system design\Project Reporting\Project Report 6.doc" size="208384" stream="V:\ngao system design\Project Reporting\Project Report 6.doc" user="Main.PeterWizinowich" version="1"
>
>
META FILEATTACHMENT attachment="Project_Report_6.doc" attr="" comment="" date="1201918799" name="Project_Report_6.doc" path="V:\ngao system design\Project Reporting\Project Report 6.doc" size="216576" stream="V:\ngao system design\Project Reporting\Project Report 6.doc" user="Main.PeterWizinowich" version="2"
 
META FILEATTACHMENT attachment="NGAO_SD_schedule_v30_tracked.gif" attr="" comment="" date="1201904336" name="NGAO_SD_schedule_v30_tracked.gif" path="V:\ngao system design\SD Plans\NGAO SD schedule v30_tracked.mpp" size="1481216" stream="V:\ngao system design\SD Plans\NGAO SD schedule v30_tracked.mpp" user="Main.PeterWizinowich" version="2"
Changed:
<
<
META FILEATTACHMENT attachment="NGAO_SD_schedule_v30_tracked.mpp" attr="" comment="" date="1201904561" name="NGAO_SD_schedule_v30_tracked.mpp" path="V:\ngao system design\SD Plans\NGAO SD schedule v30_tracked.mpp" size="1481216" stream="V:\ngao system design\SD Plans\NGAO SD schedule v30_tracked.mpp" user="Main.PeterWizinowich" version="1"
>
>
META FILEATTACHMENT attachment="NGAO_SD_schedule_v30_tracked.mpp" attr="" comment="" date="1201918760" name="NGAO_SD_schedule_v30_tracked.mpp" path="V:\ngao system design\SD Plans\NGAO SD schedule v30_tracked.mpp" size="1495040" stream="V:\ngao system design\SD Plans\NGAO SD schedule v30_tracked.mpp" user="Main.PeterWizinowich" version="2"

Revision 922008-02-01 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
This collection is for System Design Phase Planning and Tracking Documents
Line: 30 to 30
 
Added:
>
>
 

Project Reports:

Line: 45 to 46
 
Added:
>
>
  NGAO Executive Committee Telecon Summaries:
Line: 158 to 160
 
META FILEATTACHMENT attr="" autoattached="1" comment="Suggestion for Work Breakdown Structure - in org-chart format" date="1156543102" name="WBS_Architecture_DG_Aug2506.pdf" path="WBS_Architecture_DG_Aug2506.pdf" size="16915" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Replan version 24" date="1177439583" name="NGAO_SD_schedule_v24.mpp" path="NGAO_SD_schedule_v24.mpp" size="1205760" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Early draft, WBS structure unclear" date="1156449903" name="SD_phase_WBS_dictionary_v03.xls" path="SD_phase_WBS_dictionary_v03.xls" size="37376" user="Main.RichardDekany" version="1"
Added:
>
>
META FILEATTACHMENT attachment="Project_Report_6.doc" attr="" comment="" date="1201903948" name="Project_Report_6.doc" path="V:\ngao system design\Project Reporting\Project Report 6.doc" size="208384" stream="V:\ngao system design\Project Reporting\Project Report 6.doc" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attachment="NGAO_SD_schedule_v30_tracked.gif" attr="" comment="" date="1201904336" name="NGAO_SD_schedule_v30_tracked.gif" path="V:\ngao system design\SD Plans\NGAO SD schedule v30_tracked.mpp" size="1481216" stream="V:\ngao system design\SD Plans\NGAO SD schedule v30_tracked.mpp" user="Main.PeterWizinowich" version="2"
META FILEATTACHMENT attachment="NGAO_SD_schedule_v30_tracked.mpp" attr="" comment="" date="1201904561" name="NGAO_SD_schedule_v30_tracked.mpp" path="V:\ngao system design\SD Plans\NGAO SD schedule v30_tracked.mpp" size="1481216" stream="V:\ngao system design\SD Plans\NGAO SD schedule v30_tracked.mpp" user="Main.PeterWizinowich" version="1"

Revision 912007-12-12 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
This collection is for System Design Phase Planning and Tracking Documents
Line: 26 to 26
 
  • NGAO_SD_schedule_v26_tracked.mpp: MS Project version of the tracked plan (post-replan) - Peter Wizinowich, Nov. 3, 2007
  • NGAO_SD_schedule_v26_tracked.xls: Excel version of the tracked project plan. See the color code at the bottom of the spreadsheet. Also note that the "Plan" column indicates which WBS elements requires Work Scope Planning Sheets - Peter Wizinowich, Nov. 3, 2007.
Changed:
<
<
Early-FY08 Revised SEMP (DRAFT result of Nov/07 replan):
>
>
Early-FY08 Revised SEMP (Result of Nov/07 replan):
 
Changed:
<
<
>
>
 

Project Reports:

Line: 81 to 81
 
META FILEATTACHMENT attr="" autoattached="1" comment="9/14/07 version" date="1189825897" name="NGAO_SD_schedule_v26_tracked.mpp" path="NGAO_SD_schedule_v26_tracked.mpp" size="1344512" user="Main.PeterWizinowich" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/25/06)" date="1159240938" name="NGAO_SD_schedule_v10.mpp" path="NGAO_SD_schedule_v10.mpp" size="579584" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1194139424" name="Project_Report_5.doc" path="Project_Report_5.doc" size="205312" user="Main.PeterWizinowich" version="1"
Changed:
<
<
META FILEATTACHMENT attr="" autoattached="1" comment="Early FY08 Replan" date="1196392842" name="NGAO_SD_schedule_v30.mpp" path="NGAO_SD_schedule_v30.mpp" size="1456640" user="Main.PeterWizinowich" version="1"
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Early FY08 Replan" date="1197419929" name="NGAO_SD_schedule_v30.mpp" path="NGAO_SD_schedule_v30.mpp" size="1463808" user="Main.PeterWizinowich" version="2"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/22/06)" date="1158979993" name="NGAO_SD_schedule_v9.mpp" path="NGAO_SD_schedule_v9.mpp" size="630784" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/12/06)" date="1158089961" name="NGAO_SD_schedule_v7.mpp" path="NGAO_SD_schedule_v7.mpp" size="449536" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Few minor corrections" date="1179872342" name="NGAO_SD_schedule_v26.xls" path="NGAO_SD_schedule_v26.xls" size="120832" user="Main.PeterWizinowich" version="2"
Line: 102 to 102
 
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept. 12, 2006" date="1158090082" name="NGAO_SD_System_Eng_Mgmt_Plan_v09.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v09.doc" size="1249792" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/26/06)" date="1159309314" name="NGAO_SD_schedule_v11.mpp" path="NGAO_SD_schedule_v11.mpp" size="766976" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="revised - includes enties for real-time controller" date="1156545727" name="Keck_NGAO_WBS_Dictionary_(partial,_draft_8-25-06_rev1,_DG).pdf" path="Keck_NGAO_WBS_Dictionary_(partial,_draft_8-25-06_rev1,_DG).pdf" size="93422" user="Main.DonaldGavel" version="1"
Changed:
<
<
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1196392877" name="NGAO_SD_schedule_v30.pdf" path="NGAO_SD_schedule_v30.pdf" size="127334" user="Main.PeterWizinowich" version="1"
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1197420101" name="NGAO_SD_schedule_v30.pdf" path="NGAO_SD_schedule_v30.pdf" size="133124" user="Main.PeterWizinowich" version="2"
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1186792772" name="NGAO_Update_060607.doc" path="NGAO_Update_060607.doc" size="35840" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Tracked version with deleted trade studies removed" date="1194139861" name="NGAO_SD_schedule_v26_tracked_TS_deleted.mpp" path="NGAO_SD_schedule_v26_tracked_TS_deleted.mpp" size="1359360" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="TIFF format" date="1159392091" name="Sci_requirement_Performance_budget_Iterations_v1.tiff" path="Sci_requirement_Performance_budget_Iterations_v1.tiff" size="155728" user="Main.RichardDekany" version="1"

Revision 902007-11-30 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
This collection is for System Design Phase Planning and Tracking Documents
Line: 15 to 15
 
  • NGAO_SD_schedule_v20_tracked.mpp: Final tracked version of the original project plan (pre-replan) - Peter Wizinowich, April 16, 2007 (v20_tracked.pdf)
  • NGAO_SD_schedule_v20_tracked_final.xls: Excel version of the tracked project plan. See the color code at the bottom of the spreadsheet. Also note that the "Plan" column indicates which WBS elements requires Work Scope Planning Sheets - Peter Wizinowich, April 16, 2007 (This is the final tracked version prior to the replan).
Changed:
<
<
Revised SEMP (result of Apr-May/07 replan):
>
>
Mid-FY07 Revised SEMP (result of Apr-May/07 replan):
 
Line: 26 to 26
 
  • NGAO_SD_schedule_v26_tracked.mpp: MS Project version of the tracked plan (post-replan) - Peter Wizinowich, Nov. 3, 2007
  • NGAO_SD_schedule_v26_tracked.xls: Excel version of the tracked project plan. See the color code at the bottom of the spreadsheet. Also note that the "Plan" column indicates which WBS elements requires Work Scope Planning Sheets - Peter Wizinowich, Nov. 3, 2007.
Added:
>
>
Early-FY08 Revised SEMP (DRAFT result of Nov/07 replan):

  Project Reports:
Line: 76 to 81
 
META FILEATTACHMENT attr="" autoattached="1" comment="9/14/07 version" date="1189825897" name="NGAO_SD_schedule_v26_tracked.mpp" path="NGAO_SD_schedule_v26_tracked.mpp" size="1344512" user="Main.PeterWizinowich" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/25/06)" date="1159240938" name="NGAO_SD_schedule_v10.mpp" path="NGAO_SD_schedule_v10.mpp" size="579584" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1194139424" name="Project_Report_5.doc" path="Project_Report_5.doc" size="205312" user="Main.PeterWizinowich" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Early FY08 Replan" date="1196392842" name="NGAO_SD_schedule_v30.mpp" path="NGAO_SD_schedule_v30.mpp" size="1456640" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/22/06)" date="1158979993" name="NGAO_SD_schedule_v9.mpp" path="NGAO_SD_schedule_v9.mpp" size="630784" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/12/06)" date="1158089961" name="NGAO_SD_schedule_v7.mpp" path="NGAO_SD_schedule_v7.mpp" size="449536" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Few minor corrections" date="1179872342" name="NGAO_SD_schedule_v26.xls" path="NGAO_SD_schedule_v26.xls" size="120832" user="Main.PeterWizinowich" version="2"
Line: 84 to 90
 
META FILEATTACHMENT attr="" autoattached="1" comment="9/14/07 version" date="1194139767" name="NGAO_SD_schedule_v26_tracked.xls" path="NGAO_SD_schedule_v26_tracked.xls" size="177664" user="Main.PeterWizinowich" version="7"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept 7, 2006" date="1157660734" name="NGAO_SD_System_Eng_Mgmt_Plan_v05.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v05.doc" size="559616" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Final version used in SEMP + change to Nov. meeting date." date="1162939856" name="NGAO_SD_Team_Meetings_v_10.xls" path="NGAO_SD_Team_Meetings_v_10.xls" size="41472" user="Main.PeterWizinowich" version="1"
Changed:
<
<
META FILEATTACHMENT attachment="SSC_NGAO_Report_1107.ppt" attr="" comment="SSC report" date="1194550290" name="SSC_NGAO_Report_1107.ppt" path="V:\ngao system design\SSC NGAO Report 1107.ppt" size="3448832" stream="V:\ngao system design\SSC NGAO Report 1107.ppt" user="Main.PeterWizinowich" version="3"
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="SSC report" date="1194550291" name="SSC_NGAO_Report_1107.ppt" path="SSC_NGAO_Report_1107.ppt" size="3448832" user="Main.PeterWizinowich" version="3"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Replan Version 25" date="1178563739" name="NGAO_SD_schedule_v25.xls" path="NGAO_SD_schedule_v25.xls" size="113664" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1174685917" name="NGAO_SD_System_Eng_Mgmt_Plan_v20.pdf" path="NGAO_SD_System_Eng_Mgmt_Plan_v20.pdf" size="1209970" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Update 1/25/07" date="1169767836" name="NGAO_update_012507.doc" path="NGAO_update_012507.doc" size="29184" user="Main.PeterWizinowich" version="1"
Line: 96 to 102
 
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept. 12, 2006" date="1158090082" name="NGAO_SD_System_Eng_Mgmt_Plan_v09.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v09.doc" size="1249792" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/26/06)" date="1159309314" name="NGAO_SD_schedule_v11.mpp" path="NGAO_SD_schedule_v11.mpp" size="766976" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="revised - includes enties for real-time controller" date="1156545727" name="Keck_NGAO_WBS_Dictionary_(partial,_draft_8-25-06_rev1,_DG).pdf" path="Keck_NGAO_WBS_Dictionary_(partial,_draft_8-25-06_rev1,_DG).pdf" size="93422" user="Main.DonaldGavel" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1196392877" name="NGAO_SD_schedule_v30.pdf" path="NGAO_SD_schedule_v30.pdf" size="127334" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1186792772" name="NGAO_Update_060607.doc" path="NGAO_Update_060607.doc" size="35840" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Tracked version with deleted trade studies removed" date="1194139861" name="NGAO_SD_schedule_v26_tracked_TS_deleted.mpp" path="NGAO_SD_schedule_v26_tracked_TS_deleted.mpp" size="1359360" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="TIFF format" date="1159392091" name="Sci_requirement_Performance_budget_Iterations_v1.tiff" path="Sci_requirement_Performance_budget_Iterations_v1.tiff" size="155728" user="Main.RichardDekany" version="1"

Revision 892007-11-08 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
This collection is for System Design Phase Planning and Tracking Documents
Line: 84 to 84
 
META FILEATTACHMENT attr="" autoattached="1" comment="9/14/07 version" date="1194139767" name="NGAO_SD_schedule_v26_tracked.xls" path="NGAO_SD_schedule_v26_tracked.xls" size="177664" user="Main.PeterWizinowich" version="7"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept 7, 2006" date="1157660734" name="NGAO_SD_System_Eng_Mgmt_Plan_v05.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v05.doc" size="559616" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Final version used in SEMP + change to Nov. meeting date." date="1162939856" name="NGAO_SD_Team_Meetings_v_10.xls" path="NGAO_SD_Team_Meetings_v_10.xls" size="41472" user="Main.PeterWizinowich" version="1"
Changed:
<
<
META FILEATTACHMENT attr="" autoattached="1" comment="Draft SSC report" date="1194325701" name="SSC_NGAO_Report_1107.ppt" path="SSC_NGAO_Report_1107.ppt" size="3272704" user="Main.PeterWizinowich" version="2"
>
>
META FILEATTACHMENT attachment="SSC_NGAO_Report_1107.ppt" attr="" comment="SSC report" date="1194550290" name="SSC_NGAO_Report_1107.ppt" path="V:\ngao system design\SSC NGAO Report 1107.ppt" size="3448832" stream="V:\ngao system design\SSC NGAO Report 1107.ppt" user="Main.PeterWizinowich" version="3"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Replan Version 25" date="1178563739" name="NGAO_SD_schedule_v25.xls" path="NGAO_SD_schedule_v25.xls" size="113664" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1174685917" name="NGAO_SD_System_Eng_Mgmt_Plan_v20.pdf" path="NGAO_SD_System_Eng_Mgmt_Plan_v20.pdf" size="1209970" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Update 1/25/07" date="1169767836" name="NGAO_update_012507.doc" path="NGAO_update_012507.doc" size="29184" user="Main.PeterWizinowich" version="1"

Revision 882007-11-06 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
This collection is for System Design Phase Planning and Tracking Documents
Line: 39 to 39
 
Added:
>
>
  NGAO Executive Committee Telecon Summaries:
Line: 83 to 84
 
META FILEATTACHMENT attr="" autoattached="1" comment="9/14/07 version" date="1194139767" name="NGAO_SD_schedule_v26_tracked.xls" path="NGAO_SD_schedule_v26_tracked.xls" size="177664" user="Main.PeterWizinowich" version="7"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept 7, 2006" date="1157660734" name="NGAO_SD_System_Eng_Mgmt_Plan_v05.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v05.doc" size="559616" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Final version used in SEMP + change to Nov. meeting date." date="1162939856" name="NGAO_SD_Team_Meetings_v_10.xls" path="NGAO_SD_Team_Meetings_v_10.xls" size="41472" user="Main.PeterWizinowich" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Draft SSC report" date="1194325701" name="SSC_NGAO_Report_1107.ppt" path="SSC_NGAO_Report_1107.ppt" size="3272704" user="Main.PeterWizinowich" version="2"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Replan Version 25" date="1178563739" name="NGAO_SD_schedule_v25.xls" path="NGAO_SD_schedule_v25.xls" size="113664" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1174685917" name="NGAO_SD_System_Eng_Mgmt_Plan_v20.pdf" path="NGAO_SD_System_Eng_Mgmt_Plan_v20.pdf" size="1209970" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Update 1/25/07" date="1169767836" name="NGAO_update_012507.doc" path="NGAO_update_012507.doc" size="29184" user="Main.PeterWizinowich" version="1"
Line: 149 to 151
 
META FILEATTACHMENT attr="" autoattached="1" comment="Suggestion for Work Breakdown Structure - in org-chart format" date="1156543102" name="WBS_Architecture_DG_Aug2506.pdf" path="WBS_Architecture_DG_Aug2506.pdf" size="16915" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Replan version 24" date="1177439583" name="NGAO_SD_schedule_v24.mpp" path="NGAO_SD_schedule_v24.mpp" size="1205760" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Early draft, WBS structure unclear" date="1156449903" name="SD_phase_WBS_dictionary_v03.xls" path="SD_phase_WBS_dictionary_v03.xls" size="37376" user="Main.RichardDekany" version="1"
Deleted:
<
<
META FILEATTACHMENT attachment="SSC_NGAO_Report_1107.ppt" attr="" comment="Draft SSC report" date="1194289636" name="SSC_NGAO_Report_1107.ppt" path="D:\peter\Travel 1107\SSC NGAO Report 1107.ppt" size="3699200" stream="D:\peter\Travel 1107\SSC NGAO Report 1107.ppt" user="Main.PeterWizinowich" version="1"

Revision 872007-11-05 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
This collection is for System Design Phase Planning and Tracking Documents
Line: 149 to 149
 
META FILEATTACHMENT attr="" autoattached="1" comment="Suggestion for Work Breakdown Structure - in org-chart format" date="1156543102" name="WBS_Architecture_DG_Aug2506.pdf" path="WBS_Architecture_DG_Aug2506.pdf" size="16915" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Replan version 24" date="1177439583" name="NGAO_SD_schedule_v24.mpp" path="NGAO_SD_schedule_v24.mpp" size="1205760" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Early draft, WBS structure unclear" date="1156449903" name="SD_phase_WBS_dictionary_v03.xls" path="SD_phase_WBS_dictionary_v03.xls" size="37376" user="Main.RichardDekany" version="1"
Added:
>
>
META FILEATTACHMENT attachment="SSC_NGAO_Report_1107.ppt" attr="" comment="Draft SSC report" date="1194289636" name="SSC_NGAO_Report_1107.ppt" path="D:\peter\Travel 1107\SSC NGAO Report 1107.ppt" size="3699200" stream="D:\peter\Travel 1107\SSC NGAO Report 1107.ppt" user="Main.PeterWizinowich" version="1"

Revision 862007-11-04 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
This collection is for System Design Phase Planning and Tracking Documents
Line: 23 to 23
  Tracked version of revised SEMP:
Changed:
<
<
  • NGAO_SD_schedule_v26_tracked.mpp: MS Project version of the tracked plan (post-replan) - Peter Wizinowich, Sept. 14, 2007
  • NGAO_SD_schedule_v26_tracked.xls: Excel version of the tracked project plan. See the color code at the bottom of the spreadsheet. Also note that the "Plan" column indicates which WBS elements requires Work Scope Planning Sheets - Peter Wizinowich, Sept. 14, 2007.
>
>
  • NGAO_SD_schedule_v26_tracked.mpp: MS Project version of the tracked plan (post-replan) - Peter Wizinowich, Nov. 3, 2007
  • NGAO_SD_schedule_v26_tracked.xls: Excel version of the tracked project plan. See the color code at the bottom of the spreadsheet. Also note that the "Plan" column indicates which WBS elements requires Work Scope Planning Sheets - Peter Wizinowich, Nov. 3, 2007.
 

Project Reports:

Line: 38 to 38
 
Added:
>
>
  NGAO Executive Committee Telecon Summaries:
Line: 73 to 74
 
META FILEATTACHMENT attr="" autoattached="1" comment="Keck Strategic Planning Meeting - NGAO Strong Gravitational Lensing presentation" date="1190426215" name="KSPM07_lensing.ppt" path="KSPM07_lensing.ppt" size="2509312" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="9/14/07 version" date="1189825897" name="NGAO_SD_schedule_v26_tracked.mpp" path="NGAO_SD_schedule_v26_tracked.mpp" size="1344512" user="Main.PeterWizinowich" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/25/06)" date="1159240938" name="NGAO_SD_schedule_v10.mpp" path="NGAO_SD_schedule_v10.mpp" size="579584" user="Main.PeterWizinowich" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1194139424" name="Project_Report_5.doc" path="Project_Report_5.doc" size="205312" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/22/06)" date="1158979993" name="NGAO_SD_schedule_v9.mpp" path="NGAO_SD_schedule_v9.mpp" size="630784" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/12/06)" date="1158089961" name="NGAO_SD_schedule_v7.mpp" path="NGAO_SD_schedule_v7.mpp" size="449536" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Few minor corrections" date="1179872342" name="NGAO_SD_schedule_v26.xls" path="NGAO_SD_schedule_v26.xls" size="120832" user="Main.PeterWizinowich" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="Summary of NGAO EC 01/11/07 telecon" date="1168559219" name="Summary_of_NGAO_EC_011107.doc" path="Summary_of_NGAO_EC_011107.doc" size="32768" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1157577088" name="NGAO_SD_System_Eng_Mgmt_Plan_v04.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v04.doc" size="480256" user="Main.DonaldGavel" version="1"
Changed:
<
<
META FILEATTACHMENT attr="" autoattached="1" comment="9/14/07 version" date="1189826194" name="NGAO_SD_schedule_v26_tracked.xls" path="NGAO_SD_schedule_v26_tracked.xls" size="177664" user="Main.PeterWizinowich" version="6"
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="9/14/07 version" date="1194139767" name="NGAO_SD_schedule_v26_tracked.xls" path="NGAO_SD_schedule_v26_tracked.xls" size="177664" user="Main.PeterWizinowich" version="7"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept 7, 2006" date="1157660734" name="NGAO_SD_System_Eng_Mgmt_Plan_v05.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v05.doc" size="559616" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Final version used in SEMP + change to Nov. meeting date." date="1162939856" name="NGAO_SD_Team_Meetings_v_10.xls" path="NGAO_SD_Team_Meetings_v_10.xls" size="41472" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Replan Version 25" date="1178563739" name="NGAO_SD_schedule_v25.xls" path="NGAO_SD_schedule_v25.xls" size="113664" user="Main.PeterWizinowich" version="1"
Line: 93 to 95
 
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/26/06)" date="1159309314" name="NGAO_SD_schedule_v11.mpp" path="NGAO_SD_schedule_v11.mpp" size="766976" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="revised - includes enties for real-time controller" date="1156545727" name="Keck_NGAO_WBS_Dictionary_(partial,_draft_8-25-06_rev1,_DG).pdf" path="Keck_NGAO_WBS_Dictionary_(partial,_draft_8-25-06_rev1,_DG).pdf" size="93422" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1186792772" name="NGAO_Update_060607.doc" path="NGAO_Update_060607.doc" size="35840" user="Main.PeterWizinowich" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Tracked version with deleted trade studies removed" date="1194139861" name="NGAO_SD_schedule_v26_tracked_TS_deleted.mpp" path="NGAO_SD_schedule_v26_tracked_TS_deleted.mpp" size="1359360" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="TIFF format" date="1159392091" name="Sci_requirement_Performance_budget_Iterations_v1.tiff" path="Sci_requirement_Performance_budget_Iterations_v1.tiff" size="155728" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Project Report #1 (1/19/07)" date="1169261614" name="Project_Report_1.pdf" path="Project_Report_1.pdf" size="131067" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1186792977" name="NGAO_Update_081007.doc" path="NGAO_Update_081007.doc" size="35328" user="Main.PeterWizinowich" version="1"

Revision 852007-09-27 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
This collection is for System Design Phase Planning and Tracking Documents
Line: 36 to 36
 
Added:
>
>
 

NGAO Executive Committee Telecon Summaries:

Line: 96 to 97
 
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Project Report #1 (1/19/07)" date="1169261614" name="Project_Report_1.pdf" path="Project_Report_1.pdf" size="131067" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1186792977" name="NGAO_Update_081007.doc" path="NGAO_Update_081007.doc" size="35328" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Project Report #1 (1/19/07)" date="1169261351" name="Project_Report_1.doc" path="Project_Report_1.doc" size="155136" user="Main.PeterWizinowich" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1190917828" name="KSPM07_astrometry.ppt" path="KSPM07_astrometry.ppt" size="2302464" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Project Report #2" date="1175546968" name="Project_Report_2.pdf" path="Project_Report_2.pdf" size="111962" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Replan v25" date="1178563699" name="NGAO_SD_schedule_v25.mpp" path="NGAO_SD_schedule_v25.mpp" size="1253376" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Tracked version of schedule. 1/19/07" date="1169239343" name="NGAO_SD_schedule_v20.mpp" path="NGAO_SD_schedule_v20.mpp" size="638464" user="Main.PeterWizinowich" version="2"

Revision 842007-09-22 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
This collection is for System Design Phase Planning and Tracking Documents
Line: 35 to 35
 
Added:
>
>
  NGAO Executive Committee Telecon Summaries:
Line: 67 to 69
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1159476728" name="NGAO_SD_System_Eng_Mgmt_Plan_v14.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v14.doc" size="1353216" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Summary of 11/29/06 telecon" date="1164912197" name="Summary_of_NGAO_EC_112906.doc" path="Summary_of_NGAO_EC_112906.doc" size="27648" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Corrected SDM v1 date" date="1179872294" name="NGAO_SD_schedule_v26.mpp" path="NGAO_SD_schedule_v26.mpp" size="1300480" user="Main.PeterWizinowich" version="2"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Keck Strategic Planning Meeting - NGAO Strong Gravitational Lensing presentation" date="1190426215" name="KSPM07_lensing.ppt" path="KSPM07_lensing.ppt" size="2509312" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="9/14/07 version" date="1189825897" name="NGAO_SD_schedule_v26_tracked.mpp" path="NGAO_SD_schedule_v26_tracked.mpp" size="1344512" user="Main.PeterWizinowich" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/25/06)" date="1159240938" name="NGAO_SD_schedule_v10.mpp" path="NGAO_SD_schedule_v10.mpp" size="579584" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/22/06)" date="1158979993" name="NGAO_SD_schedule_v9.mpp" path="NGAO_SD_schedule_v9.mpp" size="630784" user="Main.PeterWizinowich" version="1"
Line: 121 to 124
 
META FILEATTACHMENT attr="" autoattached="1" comment="Peter's 9/27/06 version" date="1159413795" name="NGAO_SD_schedule_v14.mpp" path="NGAO_SD_schedule_v14.mpp" size="615936" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="WBS cleaned, but not perfect; work flow updated" date="1159557592" name="NGAO_SD_System_Eng_Mgmt_Plan_v17.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v17.doc" size="1526784" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Org chart as of Sept 7, 2006" date="1157660777" name="NGAO_SD_org_chart.vsd" path="NGAO_SD_org_chart.vsd" size="113664" user="Main.DonaldGavel" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Keck Strategic Planning Meeting - Team presentation" date="1190426119" name="KSPM07_NGAO.ppt" path="KSPM07_NGAO.ppt" size="2273792" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Updated 9/22/06" date="1158965020" name="NGAO_SD_Team_Meetings_v_08.xls" path="NGAO_SD_Team_Meetings_v_08.xls" size="62976" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 6" date="1156533887" name="NGAO_WBS_RGD_v_01_level_6.pdf" path="NGAO_WBS_RGD_v_01_level_6.pdf" size="46247" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Planning sheet to be used for defining the work scope for a WBS element. To be used prior to performing significant work on a WBS element." date="1163033650" name="NGAOWorkScopePlanningSheet.doc" path="NGAOWorkScopePlanningSheet.doc" size="126976" user="Main.PeterWizinowich" version="2"

Revision 832007-09-19 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
This collection is for System Design Phase Planning and Tracking Documents
Line: 34 to 34
 
Changed:
<
<
>
>
  NGAO Executive Committee Telecon Summaries:
Line: 117 to 117
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1179869358" name="Summary_of_NGAO_EC_052207.doc" path="Summary_of_NGAO_EC_052207.doc" size="29696" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="pdf version of tracked schedule (3/30/07)" date="1175282812" name="NGAO_SD_schedule_v20_tracked.pdf" path="NGAO_SD_schedule_v20_tracked.pdf" size="104849" user="Main.PeterWizinowich" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1158965808" name="Sci_requirement_Performance_budget_Iterations.pdf" path="Sci_requirement_Performance_budget_Iterations.pdf" size="45806" user="Main.RichardDekany" version="2"
Changed:
<
<
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1190041382" name="Project_Report_4.doc" path="Project_Report_4.doc" size="151552" user="Main.PeterWizinowich" version="1"
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1190216131" name="Project_Report_4.doc" path="Project_Report_4.doc" size="182272" user="Main.PeterWizinowich" version="2"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Peter's 9/27/06 version" date="1159413795" name="NGAO_SD_schedule_v14.mpp" path="NGAO_SD_schedule_v14.mpp" size="615936" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="WBS cleaned, but not perfect; work flow updated" date="1159557592" name="NGAO_SD_System_Eng_Mgmt_Plan_v17.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v17.doc" size="1526784" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Org chart as of Sept 7, 2006" date="1157660777" name="NGAO_SD_org_chart.vsd" path="NGAO_SD_org_chart.vsd" size="113664" user="Main.DonaldGavel" version="1"

Revision 822007-09-17 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
This collection is for System Design Phase Planning and Tracking Documents
Line: 34 to 34
 
Added:
>
>
  NGAO Executive Committee Telecon Summaries:
Line: 116 to 117
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1179869358" name="Summary_of_NGAO_EC_052207.doc" path="Summary_of_NGAO_EC_052207.doc" size="29696" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="pdf version of tracked schedule (3/30/07)" date="1175282812" name="NGAO_SD_schedule_v20_tracked.pdf" path="NGAO_SD_schedule_v20_tracked.pdf" size="104849" user="Main.PeterWizinowich" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1158965808" name="Sci_requirement_Performance_budget_Iterations.pdf" path="Sci_requirement_Performance_budget_Iterations.pdf" size="45806" user="Main.RichardDekany" version="2"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1190041382" name="Project_Report_4.doc" path="Project_Report_4.doc" size="151552" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Peter's 9/27/06 version" date="1159413795" name="NGAO_SD_schedule_v14.mpp" path="NGAO_SD_schedule_v14.mpp" size="615936" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="WBS cleaned, but not perfect; work flow updated" date="1159557592" name="NGAO_SD_System_Eng_Mgmt_Plan_v17.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v17.doc" size="1526784" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Org chart as of Sept 7, 2006" date="1157660777" name="NGAO_SD_org_chart.vsd" path="NGAO_SD_org_chart.vsd" size="113664" user="Main.DonaldGavel" version="1"

Revision 812007-09-15 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
This collection is for System Design Phase Planning and Tracking Documents
Line: 23 to 23
  Tracked version of revised SEMP:
Changed:
<
<
  • NGAO_SD_schedule_v26_tracked.mpp: MS Project version of the tracked plan (post-replan) - Peter Wizinowich, June 18, 2007
  • NGAO_SD_schedule_v26_tracked.xls: Excel version of the tracked project plan. See the color code at the bottom of the spreadsheet. Also note that the "Plan" column indicates which WBS elements requires Work Scope Planning Sheets - Peter Wizinowich, Aug. 29, 2007.
>
>
  • NGAO_SD_schedule_v26_tracked.mpp: MS Project version of the tracked plan (post-replan) - Peter Wizinowich, Sept. 14, 2007
  • NGAO_SD_schedule_v26_tracked.xls: Excel version of the tracked project plan. See the color code at the bottom of the spreadsheet. Also note that the "Plan" column indicates which WBS elements requires Work Scope Planning Sheets - Peter Wizinowich, Sept. 14, 2007.
 

Project Reports:

Line: 66 to 66
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1159476728" name="NGAO_SD_System_Eng_Mgmt_Plan_v14.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v14.doc" size="1353216" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Summary of 11/29/06 telecon" date="1164912197" name="Summary_of_NGAO_EC_112906.doc" path="Summary_of_NGAO_EC_112906.doc" size="27648" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Corrected SDM v1 date" date="1179872294" name="NGAO_SD_schedule_v26.mpp" path="NGAO_SD_schedule_v26.mpp" size="1300480" user="Main.PeterWizinowich" version="2"
Changed:
<
<
META FILEATTACHMENT attr="" autoattached="1" comment="6/18/07 version" date="1182230607" name="NGAO_SD_schedule_v26_tracked.mpp" path="NGAO_SD_schedule_v26_tracked.mpp" size="1296896" user="Main.PeterWizinowich" version="1"
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="9/14/07 version" date="1189825897" name="NGAO_SD_schedule_v26_tracked.mpp" path="NGAO_SD_schedule_v26_tracked.mpp" size="1344512" user="Main.PeterWizinowich" version="2"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/25/06)" date="1159240938" name="NGAO_SD_schedule_v10.mpp" path="NGAO_SD_schedule_v10.mpp" size="579584" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/22/06)" date="1158979993" name="NGAO_SD_schedule_v9.mpp" path="NGAO_SD_schedule_v9.mpp" size="630784" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/12/06)" date="1158089961" name="NGAO_SD_schedule_v7.mpp" path="NGAO_SD_schedule_v7.mpp" size="449536" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Few minor corrections" date="1179872342" name="NGAO_SD_schedule_v26.xls" path="NGAO_SD_schedule_v26.xls" size="120832" user="Main.PeterWizinowich" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="Summary of NGAO EC 01/11/07 telecon" date="1168559219" name="Summary_of_NGAO_EC_011107.doc" path="Summary_of_NGAO_EC_011107.doc" size="32768" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1157577088" name="NGAO_SD_System_Eng_Mgmt_Plan_v04.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v04.doc" size="480256" user="Main.DonaldGavel" version="1"
Changed:
<
<
META FILEATTACHMENT attr="" autoattached="1" comment="6/18/07 version" date="1182230564" name="NGAO_SD_schedule_v26_tracked.xls" path="NGAO_SD_schedule_v26_tracked.xls" size="177152" user="Main.PeterWizinowich" version="5"
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="9/14/07 version" date="1189826194" name="NGAO_SD_schedule_v26_tracked.xls" path="NGAO_SD_schedule_v26_tracked.xls" size="177664" user="Main.PeterWizinowich" version="6"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept 7, 2006" date="1157660734" name="NGAO_SD_System_Eng_Mgmt_Plan_v05.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v05.doc" size="559616" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Final version used in SEMP + change to Nov. meeting date." date="1162939856" name="NGAO_SD_Team_Meetings_v_10.xls" path="NGAO_SD_Team_Meetings_v_10.xls" size="41472" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Replan Version 25" date="1178563739" name="NGAO_SD_schedule_v25.xls" path="NGAO_SD_schedule_v25.xls" size="113664" user="Main.PeterWizinowich" version="1"
Line: 98 to 98
 
META FILEATTACHMENT attr="" autoattached="1" comment="Rich's pass - now handing back to Peter" date="1159343456" name="NGAO_SD_schedule_v13.mpp" path="NGAO_SD_schedule_v13.mpp" size="610816" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Includes wk-hrs mapped onto SD SEMP .mpp v10" date="1159249216" name="NGAO_SD_Team_Meetings_v_09.xls" path="NGAO_SD_Team_Meetings_v_09.xls" size="61440" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1172112060" name="Summary_of_NGAO_EC_022107.doc" path="Summary_of_NGAO_EC_022107.doc" size="32256" user="Main.PeterWizinowich" version="1"
Changed:
<
<
META FILEATTACHMENT attachment="NGAO_SD_schedule_v26_tracked_v2.xls" attr="" comment="" date="1188438598" name="NGAO_SD_schedule_v26_tracked_v2.xls" path="h:\ngao system design\NGAO SD schedule v26 tracked v2.xls" size="177152" stream="h:\ngao system design\NGAO SD schedule v26 tracked v2.xls" user="Main.PeterWizinowich" version="2"
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1188438599" name="NGAO_SD_schedule_v26_tracked_v2.xls" path="NGAO_SD_schedule_v26_tracked_v2.xls" size="177152" user="Main.PeterWizinowich" version="2"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept 11, 2006" date="1158006879" name="NGAO_SD_System_Eng_Mgmt_Plan_v08.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v08.doc" size="1090560" user="Main.PeterWizinowich" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan" date="1157577832" name="NGAO_SD_schedule_v6.mpp" path="NGAO_SD_schedule_v6.mpp" size="262656" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Excel version of the tracked project plan (updated 3/30/07)" date="1175283000" name="NGAO_SD_schedule_v20_tracked.xls" path="NGAO_SD_schedule_v20_tracked.xls" size="72704" user="Main.PeterWizinowich" version="10"

Revision 802007-08-30 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
This collection is for System Design Phase Planning and Tracking Documents
Line: 23 to 23
  Tracked version of revised SEMP:
Changed:
<
<
  • NGAO_SD_schedule_v26_tracked_v2.mpp: MS Project version of the tracked plan (post-replan) - Peter Wizinowich, Aug. 29, 2007
  • NGAO_SD_schedule_v26_tracked.xls: Excel version of the tracked project plan. See the color code at the bottom of the spreadsheet. Also note that the "Plan" column indicates which WBS elements requires Work Scope Planning Sheets - Peter Wizinowich, June 18, 2007.
>
>
  • NGAO_SD_schedule_v26_tracked.mpp: MS Project version of the tracked plan (post-replan) - Peter Wizinowich, June 18, 2007
  • NGAO_SD_schedule_v26_tracked.xls: Excel version of the tracked project plan. See the color code at the bottom of the spreadsheet. Also note that the "Plan" column indicates which WBS elements requires Work Scope Planning Sheets - Peter Wizinowich, Aug. 29, 2007.
 

Project Reports:

Line: 98 to 98
 
META FILEATTACHMENT attr="" autoattached="1" comment="Rich's pass - now handing back to Peter" date="1159343456" name="NGAO_SD_schedule_v13.mpp" path="NGAO_SD_schedule_v13.mpp" size="610816" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Includes wk-hrs mapped onto SD SEMP .mpp v10" date="1159249216" name="NGAO_SD_Team_Meetings_v_09.xls" path="NGAO_SD_Team_Meetings_v_09.xls" size="61440" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1172112060" name="Summary_of_NGAO_EC_022107.doc" path="Summary_of_NGAO_EC_022107.doc" size="32256" user="Main.PeterWizinowich" version="1"
Changed:
<
<
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1188420655" name="NGAO_SD_schedule_v26_tracked_v2.xls" path="NGAO_SD_schedule_v26_tracked_v2.xls" size="177152" user="Main.PeterWizinowich" version="1"
>
>
META FILEATTACHMENT attachment="NGAO_SD_schedule_v26_tracked_v2.xls" attr="" comment="" date="1188438598" name="NGAO_SD_schedule_v26_tracked_v2.xls" path="h:\ngao system design\NGAO SD schedule v26 tracked v2.xls" size="177152" stream="h:\ngao system design\NGAO SD schedule v26 tracked v2.xls" user="Main.PeterWizinowich" version="2"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept 11, 2006" date="1158006879" name="NGAO_SD_System_Eng_Mgmt_Plan_v08.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v08.doc" size="1090560" user="Main.PeterWizinowich" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan" date="1157577832" name="NGAO_SD_schedule_v6.mpp" path="NGAO_SD_schedule_v6.mpp" size="262656" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Excel version of the tracked project plan (updated 3/30/07)" date="1175283000" name="NGAO_SD_schedule_v20_tracked.xls" path="NGAO_SD_schedule_v20_tracked.xls" size="72704" user="Main.PeterWizinowich" version="10"

Revision 792007-08-29 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
This collection is for System Design Phase Planning and Tracking Documents
Line: 23 to 23
  Tracked version of revised SEMP:
Changed:
<
<
>
>
 
  • NGAO_SD_schedule_v26_tracked.xls: Excel version of the tracked project plan. See the color code at the bottom of the spreadsheet. Also note that the "Plan" column indicates which WBS elements requires Work Scope Planning Sheets - Peter Wizinowich, June 18, 2007.
Line: 90 to 90
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1186792772" name="NGAO_Update_060607.doc" path="NGAO_Update_060607.doc" size="35840" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="TIFF format" date="1159392091" name="Sci_requirement_Performance_budget_Iterations_v1.tiff" path="Sci_requirement_Performance_budget_Iterations_v1.tiff" size="155728" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Project Report #1 (1/19/07)" date="1169261614" name="Project_Report_1.pdf" path="Project_Report_1.pdf" size="131067" user="Main.PeterWizinowich" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1186792977" name="NGAO_Update_081007.doc" path="NGAO_Update_081007.doc" size="35328" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Project Report #1 (1/19/07)" date="1169261351" name="Project_Report_1.doc" path="Project_Report_1.doc" size="155136" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Project Report #2" date="1175546968" name="Project_Report_2.pdf" path="Project_Report_2.pdf" size="111962" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Replan v25" date="1178563699" name="NGAO_SD_schedule_v25.mpp" path="NGAO_SD_schedule_v25.mpp" size="1253376" user="Main.PeterWizinowich" version="1"
Line: 97 to 98
 
META FILEATTACHMENT attr="" autoattached="1" comment="Rich's pass - now handing back to Peter" date="1159343456" name="NGAO_SD_schedule_v13.mpp" path="NGAO_SD_schedule_v13.mpp" size="610816" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Includes wk-hrs mapped onto SD SEMP .mpp v10" date="1159249216" name="NGAO_SD_Team_Meetings_v_09.xls" path="NGAO_SD_Team_Meetings_v_09.xls" size="61440" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1172112060" name="Summary_of_NGAO_EC_022107.doc" path="Summary_of_NGAO_EC_022107.doc" size="32256" user="Main.PeterWizinowich" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1188420655" name="NGAO_SD_schedule_v26_tracked_v2.xls" path="NGAO_SD_schedule_v26_tracked_v2.xls" size="177152" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept 11, 2006" date="1158006879" name="NGAO_SD_System_Eng_Mgmt_Plan_v08.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v08.doc" size="1090560" user="Main.PeterWizinowich" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan" date="1157577832" name="NGAO_SD_schedule_v6.mpp" path="NGAO_SD_schedule_v6.mpp" size="262656" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Excel version of the tracked project plan (updated 3/30/07)" date="1175283000" name="NGAO_SD_schedule_v20_tracked.xls" path="NGAO_SD_schedule_v20_tracked.xls" size="72704" user="Main.PeterWizinowich" version="10"
Line: 136 to 138
 
META FILEATTACHMENT attr="" autoattached="1" comment="Suggestion for Work Breakdown Structure - in org-chart format" date="1156543102" name="WBS_Architecture_DG_Aug2506.pdf" path="WBS_Architecture_DG_Aug2506.pdf" size="16915" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Replan version 24" date="1177439583" name="NGAO_SD_schedule_v24.mpp" path="NGAO_SD_schedule_v24.mpp" size="1205760" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Early draft, WBS structure unclear" date="1156449903" name="SD_phase_WBS_dictionary_v03.xls" path="SD_phase_WBS_dictionary_v03.xls" size="37376" user="Main.RichardDekany" version="1"
Deleted:
<
<
META FILEATTACHMENT attachment="NGAO_Update_081007.doc" attr="" comment="" date="1186792977" name="NGAO_Update_081007.doc" path="h:\ngao system design\NGAO Update 081007.doc" size="35328" stream="h:\ngao system design\NGAO Update 081007.doc" user="Main.PeterWizinowich" version="1"

Revision 782007-08-11 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
This collection is for System Design Phase Planning and Tracking Documents
Line: 49 to 49
 
Added:
>
>
 
Changed:
<
<
META FILEATTACHMENT attachment="SSC_NGAO_Report_0607.ppt" attr="" comment="" date="1182299901" name="SSC_NGAO_Report_0607.ppt" path="h:\ngao system design\SSC NGAO Report 0607.ppt" size="1147904" stream="h:\ngao system design\SSC NGAO Report 0607.ppt" user="Main.PeterWizinowich" version="4"
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1182299902" name="SSC_NGAO_Report_0607.ppt" path="SSC_NGAO_Report_0607.ppt" size="1147904" user="Main.PeterWizinowich" version="4"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Replan version 24 excel spreadsheet" date="1177445006" name="NGAO_SD_schedule_v24.xls" path="NGAO_SD_schedule_v24.xls" size="109568" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="(PDF form of above)" date="1157577901" name="NGAO_SD_schedule_v6.pdf" path="NGAO_SD_schedule_v6.pdf" size="58177" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Month-by-month look at assignments" date="1170210406" name="NGAO_SD_Resource_Usage_Report.pdf" path="NGAO_SD_Resource_Usage_Report.pdf" size="69809" user="Main.RichardDekany" version="1"
Line: 85 to 87
 
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept. 12, 2006" date="1158090082" name="NGAO_SD_System_Eng_Mgmt_Plan_v09.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v09.doc" size="1249792" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/26/06)" date="1159309314" name="NGAO_SD_schedule_v11.mpp" path="NGAO_SD_schedule_v11.mpp" size="766976" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="revised - includes enties for real-time controller" date="1156545727" name="Keck_NGAO_WBS_Dictionary_(partial,_draft_8-25-06_rev1,_DG).pdf" path="Keck_NGAO_WBS_Dictionary_(partial,_draft_8-25-06_rev1,_DG).pdf" size="93422" user="Main.DonaldGavel" version="1"
Changed:
<
<
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1181156094" name="NGAO_Update_060607.doc" path="NGAO_Update_060607.doc" size="35840" user="Main.PeterWizinowich" version="1"
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1186792772" name="NGAO_Update_060607.doc" path="NGAO_Update_060607.doc" size="35840" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="TIFF format" date="1159392091" name="Sci_requirement_Performance_budget_Iterations_v1.tiff" path="Sci_requirement_Performance_budget_Iterations_v1.tiff" size="155728" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Project Report #1 (1/19/07)" date="1169261614" name="Project_Report_1.pdf" path="Project_Report_1.pdf" size="131067" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Project Report #1 (1/19/07)" date="1169261351" name="Project_Report_1.doc" path="Project_Report_1.doc" size="155136" user="Main.PeterWizinowich" version="1"
Line: 134 to 136
 
META FILEATTACHMENT attr="" autoattached="1" comment="Suggestion for Work Breakdown Structure - in org-chart format" date="1156543102" name="WBS_Architecture_DG_Aug2506.pdf" path="WBS_Architecture_DG_Aug2506.pdf" size="16915" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Replan version 24" date="1177439583" name="NGAO_SD_schedule_v24.mpp" path="NGAO_SD_schedule_v24.mpp" size="1205760" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Early draft, WBS structure unclear" date="1156449903" name="SD_phase_WBS_dictionary_v03.xls" path="SD_phase_WBS_dictionary_v03.xls" size="37376" user="Main.RichardDekany" version="1"
Added:
>
>
META FILEATTACHMENT attachment="NGAO_Update_081007.doc" attr="" comment="" date="1186792977" name="NGAO_Update_081007.doc" path="h:\ngao system design\NGAO Update 081007.doc" size="35328" stream="h:\ngao system design\NGAO Update 081007.doc" user="Main.PeterWizinowich" version="1"

Revision 772007-06-20 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
This collection is for System Design Phase Planning and Tracking Documents
Line: 51 to 51
 
Changed:
<
<
META FILEATTACHMENT attachment="SSC_NGAO_Report_0607.ppt" attr="" comment="" date="1182296262" name="SSC_NGAO_Report_0607.ppt" path="h:\ngao system design\SSC NGAO Report 0607.ppt" size="1110016" stream="h:\ngao system design\SSC NGAO Report 0607.ppt" user="Main.PeterWizinowich" version="3"
>
>
META FILEATTACHMENT attachment="SSC_NGAO_Report_0607.ppt" attr="" comment="" date="1182299901" name="SSC_NGAO_Report_0607.ppt" path="h:\ngao system design\SSC NGAO Report 0607.ppt" size="1147904" stream="h:\ngao system design\SSC NGAO Report 0607.ppt" user="Main.PeterWizinowich" version="4"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Replan version 24 excel spreadsheet" date="1177445006" name="NGAO_SD_schedule_v24.xls" path="NGAO_SD_schedule_v24.xls" size="109568" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="(PDF form of above)" date="1157577901" name="NGAO_SD_schedule_v6.pdf" path="NGAO_SD_schedule_v6.pdf" size="58177" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Month-by-month look at assignments" date="1170210406" name="NGAO_SD_Resource_Usage_Report.pdf" path="NGAO_SD_Resource_Usage_Report.pdf" size="69809" user="Main.RichardDekany" version="1"

Revision 762007-06-19 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
This collection is for System Design Phase Planning and Tracking Documents
Line: 51 to 51
 
Changed:
<
<
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1182237688" name="SSC_NGAO_Report_0607.ppt" path="SSC_NGAO_Report_0607.ppt" size="576512" user="Main.PeterWizinowich" version="1"
>
>
META FILEATTACHMENT attachment="SSC_NGAO_Report_0607.ppt" attr="" comment="" date="1182296262" name="SSC_NGAO_Report_0607.ppt" path="h:\ngao system design\SSC NGAO Report 0607.ppt" size="1110016" stream="h:\ngao system design\SSC NGAO Report 0607.ppt" user="Main.PeterWizinowich" version="3"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Replan version 24 excel spreadsheet" date="1177445006" name="NGAO_SD_schedule_v24.xls" path="NGAO_SD_schedule_v24.xls" size="109568" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="(PDF form of above)" date="1157577901" name="NGAO_SD_schedule_v6.pdf" path="NGAO_SD_schedule_v6.pdf" size="58177" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Month-by-month look at assignments" date="1170210406" name="NGAO_SD_Resource_Usage_Report.pdf" path="NGAO_SD_Resource_Usage_Report.pdf" size="69809" user="Main.RichardDekany" version="1"

Revision 752007-06-19 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
This collection is for System Design Phase Planning and Tracking Documents
Line: 33 to 33
 
Added:
>
>
  NGAO Executive Committee Telecon Summaries:
Line: 50 to 51
 
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1182237688" name="SSC_NGAO_Report_0607.ppt" path="SSC_NGAO_Report_0607.ppt" size="576512" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Replan version 24 excel spreadsheet" date="1177445006" name="NGAO_SD_schedule_v24.xls" path="NGAO_SD_schedule_v24.xls" size="109568" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="(PDF form of above)" date="1157577901" name="NGAO_SD_schedule_v6.pdf" path="NGAO_SD_schedule_v6.pdf" size="58177" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Month-by-month look at assignments" date="1170210406" name="NGAO_SD_Resource_Usage_Report.pdf" path="NGAO_SD_Resource_Usage_Report.pdf" size="69809" user="Main.RichardDekany" version="1"

Revision 742007-06-19 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
This collection is for System Design Phase Planning and Tracking Documents
Line: 23 to 23
  Tracked version of revised SEMP:
Changed:
<
<
  • NGAO_SD_schedule_v26_tracked.xls: Excel version of the tracked project plan. See the color code at the bottom of the spreadsheet. Also note that the "Plan" column indicates which WBS elements requires Work Scope Planning Sheets - Peter Wizinowich, June 5, 2007.
>
>
  • NGAO_SD_schedule_v26_tracked.mpp: MS Project version of the tracked plan (post-replan) - Peter Wizinowich, June 18, 2007
  • NGAO_SD_schedule_v26_tracked.xls: Excel version of the tracked project plan. See the color code at the bottom of the spreadsheet. Also note that the "Plan" column indicates which WBS elements requires Work Scope Planning Sheets - Peter Wizinowich, June 18, 2007.
 

Project Reports:

Line: 31 to 32
 
Added:
>
>
  NGAO Executive Committee Telecon Summaries:
Line: 60 to 62
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1159476728" name="NGAO_SD_System_Eng_Mgmt_Plan_v14.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v14.doc" size="1353216" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Summary of 11/29/06 telecon" date="1164912197" name="Summary_of_NGAO_EC_112906.doc" path="Summary_of_NGAO_EC_112906.doc" size="27648" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Corrected SDM v1 date" date="1179872294" name="NGAO_SD_schedule_v26.mpp" path="NGAO_SD_schedule_v26.mpp" size="1300480" user="Main.PeterWizinowich" version="2"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="6/18/07 version" date="1182230607" name="NGAO_SD_schedule_v26_tracked.mpp" path="NGAO_SD_schedule_v26_tracked.mpp" size="1296896" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/25/06)" date="1159240938" name="NGAO_SD_schedule_v10.mpp" path="NGAO_SD_schedule_v10.mpp" size="579584" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/22/06)" date="1158979993" name="NGAO_SD_schedule_v9.mpp" path="NGAO_SD_schedule_v9.mpp" size="630784" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/12/06)" date="1158089961" name="NGAO_SD_schedule_v7.mpp" path="NGAO_SD_schedule_v7.mpp" size="449536" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Few minor corrections" date="1179872342" name="NGAO_SD_schedule_v26.xls" path="NGAO_SD_schedule_v26.xls" size="120832" user="Main.PeterWizinowich" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="Summary of NGAO EC 01/11/07 telecon" date="1168559219" name="Summary_of_NGAO_EC_011107.doc" path="Summary_of_NGAO_EC_011107.doc" size="32768" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1157577088" name="NGAO_SD_System_Eng_Mgmt_Plan_v04.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v04.doc" size="480256" user="Main.DonaldGavel" version="1"
Changed:
<
<
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1181075553" name="NGAO_SD_schedule_v26_tracked.xls" path="NGAO_SD_schedule_v26_tracked.xls" size="174080" user="Main.PeterWizinowich" version="4"
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="6/18/07 version" date="1182230564" name="NGAO_SD_schedule_v26_tracked.xls" path="NGAO_SD_schedule_v26_tracked.xls" size="177152" user="Main.PeterWizinowich" version="5"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept 7, 2006" date="1157660734" name="NGAO_SD_System_Eng_Mgmt_Plan_v05.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v05.doc" size="559616" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Final version used in SEMP + change to Nov. meeting date." date="1162939856" name="NGAO_SD_Team_Meetings_v_10.xls" path="NGAO_SD_Team_Meetings_v_10.xls" size="41472" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Replan Version 25" date="1178563739" name="NGAO_SD_schedule_v25.xls" path="NGAO_SD_schedule_v25.xls" size="113664" user="Main.PeterWizinowich" version="1"

Revision 732007-06-06 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
This collection is for System Design Phase Planning and Tracking Documents
Line: 45 to 45
 
Added:
>
>
 

META FILEATTACHMENT attr="" autoattached="1" comment="Replan version 24 excel spreadsheet" date="1177445006" name="NGAO_SD_schedule_v24.xls" path="NGAO_SD_schedule_v24.xls" size="109568" user="Main.PeterWizinowich" version="1"
Line: 65 to 66
 
META FILEATTACHMENT attr="" autoattached="1" comment="Few minor corrections" date="1179872342" name="NGAO_SD_schedule_v26.xls" path="NGAO_SD_schedule_v26.xls" size="120832" user="Main.PeterWizinowich" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="Summary of NGAO EC 01/11/07 telecon" date="1168559219" name="Summary_of_NGAO_EC_011107.doc" path="Summary_of_NGAO_EC_011107.doc" size="32768" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1157577088" name="NGAO_SD_System_Eng_Mgmt_Plan_v04.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v04.doc" size="480256" user="Main.DonaldGavel" version="1"
Changed:
<
<
META FILEATTACHMENT attachment="NGAO_SD_schedule_v26_tracked.xls" attr="" comment="" date="1181075553" name="NGAO_SD_schedule_v26_tracked.xls" path="V:\ngao system design\NGAO SD schedule v26 tracked.xls" size="174080" stream="V:\ngao system design\NGAO SD schedule v26 tracked.xls" user="Main.PeterWizinowich" version="4"
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1181075553" name="NGAO_SD_schedule_v26_tracked.xls" path="NGAO_SD_schedule_v26_tracked.xls" size="174080" user="Main.PeterWizinowich" version="4"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept 7, 2006" date="1157660734" name="NGAO_SD_System_Eng_Mgmt_Plan_v05.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v05.doc" size="559616" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Final version used in SEMP + change to Nov. meeting date." date="1162939856" name="NGAO_SD_Team_Meetings_v_10.xls" path="NGAO_SD_Team_Meetings_v_10.xls" size="41472" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Replan Version 25" date="1178563739" name="NGAO_SD_schedule_v25.xls" path="NGAO_SD_schedule_v25.xls" size="113664" user="Main.PeterWizinowich" version="1"
Line: 79 to 80
 
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept. 12, 2006" date="1158090082" name="NGAO_SD_System_Eng_Mgmt_Plan_v09.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v09.doc" size="1249792" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/26/06)" date="1159309314" name="NGAO_SD_schedule_v11.mpp" path="NGAO_SD_schedule_v11.mpp" size="766976" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="revised - includes enties for real-time controller" date="1156545727" name="Keck_NGAO_WBS_Dictionary_(partial,_draft_8-25-06_rev1,_DG).pdf" path="Keck_NGAO_WBS_Dictionary_(partial,_draft_8-25-06_rev1,_DG).pdf" size="93422" user="Main.DonaldGavel" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1181156094" name="NGAO_Update_060607.doc" path="NGAO_Update_060607.doc" size="35840" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="TIFF format" date="1159392091" name="Sci_requirement_Performance_budget_Iterations_v1.tiff" path="Sci_requirement_Performance_budget_Iterations_v1.tiff" size="155728" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Project Report #1 (1/19/07)" date="1169261614" name="Project_Report_1.pdf" path="Project_Report_1.pdf" size="131067" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Project Report #1 (1/19/07)" date="1169261351" name="Project_Report_1.doc" path="Project_Report_1.doc" size="155136" user="Main.PeterWizinowich" version="1"

Revision 722007-06-05 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
This collection is for System Design Phase Planning and Tracking Documents
Line: 65 to 65
 
META FILEATTACHMENT attr="" autoattached="1" comment="Few minor corrections" date="1179872342" name="NGAO_SD_schedule_v26.xls" path="NGAO_SD_schedule_v26.xls" size="120832" user="Main.PeterWizinowich" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="Summary of NGAO EC 01/11/07 telecon" date="1168559219" name="Summary_of_NGAO_EC_011107.doc" path="Summary_of_NGAO_EC_011107.doc" size="32768" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1157577088" name="NGAO_SD_System_Eng_Mgmt_Plan_v04.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v04.doc" size="480256" user="Main.DonaldGavel" version="1"
Changed:
<
<
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1181071590" name="NGAO_SD_schedule_v26_tracked.xls" path="NGAO_SD_schedule_v26_tracked.xls" size="174080" user="Main.PeterWizinowich" version="3"
>
>
META FILEATTACHMENT attachment="NGAO_SD_schedule_v26_tracked.xls" attr="" comment="" date="1181075553" name="NGAO_SD_schedule_v26_tracked.xls" path="V:\ngao system design\NGAO SD schedule v26 tracked.xls" size="174080" stream="V:\ngao system design\NGAO SD schedule v26 tracked.xls" user="Main.PeterWizinowich" version="4"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept 7, 2006" date="1157660734" name="NGAO_SD_System_Eng_Mgmt_Plan_v05.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v05.doc" size="559616" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Final version used in SEMP + change to Nov. meeting date." date="1162939856" name="NGAO_SD_Team_Meetings_v_10.xls" path="NGAO_SD_Team_Meetings_v_10.xls" size="41472" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Replan Version 25" date="1178563739" name="NGAO_SD_schedule_v25.xls" path="NGAO_SD_schedule_v25.xls" size="113664" user="Main.PeterWizinowich" version="1"

Revision 712007-06-05 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
This collection is for System Design Phase Planning and Tracking Documents
Line: 23 to 23
  Tracked version of revised SEMP:
Changed:
<
<
  • NGAO_SD_schedule_v26_tracked.xls: Excel version of the tracked project plan. See the color code at the bottom of the spreadsheet. Also note that the "Plan" column indicates which WBS elements requires Work Scope Planning Sheets - Peter Wizinowich, May 22, 2007.
>
>
  • NGAO_SD_schedule_v26_tracked.xls: Excel version of the tracked project plan. See the color code at the bottom of the spreadsheet. Also note that the "Plan" column indicates which WBS elements requires Work Scope Planning Sheets - Peter Wizinowich, June 5, 2007.
 

Project Reports:

Line: 65 to 65
 
META FILEATTACHMENT attr="" autoattached="1" comment="Few minor corrections" date="1179872342" name="NGAO_SD_schedule_v26.xls" path="NGAO_SD_schedule_v26.xls" size="120832" user="Main.PeterWizinowich" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="Summary of NGAO EC 01/11/07 telecon" date="1168559219" name="Summary_of_NGAO_EC_011107.doc" path="Summary_of_NGAO_EC_011107.doc" size="32768" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1157577088" name="NGAO_SD_System_Eng_Mgmt_Plan_v04.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v04.doc" size="480256" user="Main.DonaldGavel" version="1"
Changed:
<
<
META FILEATTACHMENT attr="" autoattached="1" comment="Tracked version of replan" date="1179886750" name="NGAO_SD_schedule_v26_tracked.xls" path="NGAO_SD_schedule_v26_tracked.xls" size="174080" user="Main.PeterWizinowich" version="2"
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1181071590" name="NGAO_SD_schedule_v26_tracked.xls" path="NGAO_SD_schedule_v26_tracked.xls" size="174080" user="Main.PeterWizinowich" version="3"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept 7, 2006" date="1157660734" name="NGAO_SD_System_Eng_Mgmt_Plan_v05.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v05.doc" size="559616" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Final version used in SEMP + change to Nov. meeting date." date="1162939856" name="NGAO_SD_Team_Meetings_v_10.xls" path="NGAO_SD_Team_Meetings_v_10.xls" size="41472" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Replan Version 25" date="1178563739" name="NGAO_SD_schedule_v25.xls" path="NGAO_SD_schedule_v25.xls" size="113664" user="Main.PeterWizinowich" version="1"

Revision 702007-05-25 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
This collection is for System Design Phase Planning and Tracking Documents
Line: 44 to 44
 
Added:
>
>
 

META FILEATTACHMENT attr="" autoattached="1" comment="Replan version 24 excel spreadsheet" date="1177445006" name="NGAO_SD_schedule_v24.xls" path="NGAO_SD_schedule_v24.xls" size="109568" user="Main.PeterWizinowich" version="1"
Line: 64 to 65
 
META FILEATTACHMENT attr="" autoattached="1" comment="Few minor corrections" date="1179872342" name="NGAO_SD_schedule_v26.xls" path="NGAO_SD_schedule_v26.xls" size="120832" user="Main.PeterWizinowich" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="Summary of NGAO EC 01/11/07 telecon" date="1168559219" name="Summary_of_NGAO_EC_011107.doc" path="Summary_of_NGAO_EC_011107.doc" size="32768" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1157577088" name="NGAO_SD_System_Eng_Mgmt_Plan_v04.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v04.doc" size="480256" user="Main.DonaldGavel" version="1"
Changed:
<
<
META FILEATTACHMENT attachment="NGAO_SD_schedule_v26_tracked.xls" attr="" comment="Tracked version of replan" date="1179886749" name="NGAO_SD_schedule_v26_tracked.xls" path="V:\ngao system design\NGAO SD schedule v26 tracked.xls" size="174080" stream="V:\ngao system design\NGAO SD schedule v26 tracked.xls" user="Main.PeterWizinowich" version="2"
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Tracked version of replan" date="1179886750" name="NGAO_SD_schedule_v26_tracked.xls" path="NGAO_SD_schedule_v26_tracked.xls" size="174080" user="Main.PeterWizinowich" version="2"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept 7, 2006" date="1157660734" name="NGAO_SD_System_Eng_Mgmt_Plan_v05.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v05.doc" size="559616" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Final version used in SEMP + change to Nov. meeting date." date="1162939856" name="NGAO_SD_Team_Meetings_v_10.xls" path="NGAO_SD_Team_Meetings_v_10.xls" size="41472" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Replan Version 25" date="1178563739" name="NGAO_SD_schedule_v25.xls" path="NGAO_SD_schedule_v25.xls" size="113664" user="Main.PeterWizinowich" version="1"
Line: 111 to 112
 
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 6" date="1156533887" name="NGAO_WBS_RGD_v_01_level_6.pdf" path="NGAO_WBS_RGD_v_01_level_6.pdf" size="46247" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Planning sheet to be used for defining the work scope for a WBS element. To be used prior to performing significant work on a WBS element." date="1163033650" name="NGAOWorkScopePlanningSheet.doc" path="NGAOWorkScopePlanningSheet.doc" size="126976" user="Main.PeterWizinowich" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="02/28/07 EC meeting summary" date="1172709442" name="Summary_of_NGAO_EC_022807.doc" path="Summary_of_NGAO_EC_022807.doc" size="32768" user="Main.PeterWizinowich" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Team update" date="1180133810" name="NGAO_Team_Update_052407.doc" path="NGAO_Team_Update_052407.doc" size="25088" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept. 26, 2006" date="1159309264" name="NGAO_SD_System_Eng_Mgmt_Plan_v13.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v13.doc" size="1347584" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Final update of v20 tracked schedule" date="1177444855" name="NGAO_SD_schedule_v20_tracked_final.xls" path="NGAO_SD_schedule_v20_tracked_final.xls" size="72704" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1159466578" name="NGAO_SD_schedule_v15.mpp" path="NGAO_SD_schedule_v15.mpp" size="598528" user="Main.RichardDekany" version="1"

Revision 692007-05-23 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
This collection is for System Design Phase Planning and Tracking Documents
Line: 17 to 17
  Revised SEMP (result of Apr-May/07 replan):

Changed:
<
<
  • KAON 481 draft: KAON describing the replan - Peter Wizinowich, April 23, 2007.
>
>
  • KAON 481: KAON describing the replan - Peter Wizinowich, May 22, 2007.
 

Tracked version of revised SEMP:

Added:
>
>
  • NGAO_SD_schedule_v26_tracked.xls: Excel version of the tracked project plan. See the color code at the bottom of the spreadsheet. Also note that the "Plan" column indicates which WBS elements requires Work Scope Planning Sheets - Peter Wizinowich, May 22, 2007.
  Project Reports:
Line: 62 to 64
 
META FILEATTACHMENT attr="" autoattached="1" comment="Few minor corrections" date="1179872342" name="NGAO_SD_schedule_v26.xls" path="NGAO_SD_schedule_v26.xls" size="120832" user="Main.PeterWizinowich" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="Summary of NGAO EC 01/11/07 telecon" date="1168559219" name="Summary_of_NGAO_EC_011107.doc" path="Summary_of_NGAO_EC_011107.doc" size="32768" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1157577088" name="NGAO_SD_System_Eng_Mgmt_Plan_v04.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v04.doc" size="480256" user="Main.DonaldGavel" version="1"
Added:
>
>
META FILEATTACHMENT attachment="NGAO_SD_schedule_v26_tracked.xls" attr="" comment="Tracked version of replan" date="1179886749" name="NGAO_SD_schedule_v26_tracked.xls" path="V:\ngao system design\NGAO SD schedule v26 tracked.xls" size="174080" stream="V:\ngao system design\NGAO SD schedule v26 tracked.xls" user="Main.PeterWizinowich" version="2"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept 7, 2006" date="1157660734" name="NGAO_SD_System_Eng_Mgmt_Plan_v05.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v05.doc" size="559616" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Final version used in SEMP + change to Nov. meeting date." date="1162939856" name="NGAO_SD_Team_Meetings_v_10.xls" path="NGAO_SD_Team_Meetings_v_10.xls" size="41472" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Replan Version 25" date="1178563739" name="NGAO_SD_schedule_v25.xls" path="NGAO_SD_schedule_v25.xls" size="113664" user="Main.PeterWizinowich" version="1"
Line: 91 to 94
 
META FILEATTACHMENT attr="" autoattached="1" comment="Includes wk-hrs mapped onto SD SEMP .mpp v10" date="1159249289" name="NGAO_SD_Team_Meetings_v_09.pdf" path="NGAO_SD_Team_Meetings_v_09.pdf" size="15959" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 2" date="1156533845" name="NGAO_WBS_RGD_v_01_level_2.pdf" path="NGAO_WBS_RGD_v_01_level_2.pdf" size="22860" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="pdf version of tracked schedule (1/19/07)" date="1169239397" name="NGAO_SD_schedule_v20.pdf" path="NGAO_SD_schedule_v20.pdf" size="77105" user="Main.PeterWizinowich" version="1"
Changed:
<
<
META FILEATTACHMENT attachment="NGAO_SD_schedule_v26.pdf" attr="" comment="Correct SDM v1 dates" date="1179872401" name="NGAO_SD_schedule_v26.pdf" path="V:\ngao system design\NGAO SD schedule v26.pdf" size="126151" stream="V:\ngao system design\NGAO SD schedule v26.pdf" user="Main.PeterWizinowich" version="2"
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Correct SDM v1 dates" date="1179872401" name="NGAO_SD_schedule_v26.pdf" path="NGAO_SD_schedule_v26.pdf" size="126151" user="Main.PeterWizinowich" version="2"
 
META FILEATTACHMENT attr="" autoattached="1" comment="9/29/06 Version sent to Directors" date="1159587774" name="NGAO_SD_System_Eng_Mgmt_Plan_v20.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v20.doc" size="1435136" user="Main.PeterWizinowich" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1170897870" name="Summary_of_NGAO_EC_020707.doc" path="Summary_of_NGAO_EC_020707.doc" size="32256" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Tracked version of schedule. 3/30/07" date="1175282761" name="NGAO_SD_schedule_v20_tracked.mpp" path="NGAO_SD_schedule_v20_tracked.mpp" size="748544" user="Main.PeterWizinowich" version="3"

Revision 682007-05-22 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
This collection is for System Design Phase Planning and Tracking Documents
Line: 15 to 15
 
  • NGAO_SD_schedule_v20_tracked.mpp: Final tracked version of the original project plan (pre-replan) - Peter Wizinowich, April 16, 2007 (v20_tracked.pdf)
  • NGAO_SD_schedule_v20_tracked_final.xls: Excel version of the tracked project plan. See the color code at the bottom of the spreadsheet. Also note that the "Plan" column indicates which WBS elements requires Work Scope Planning Sheets - Peter Wizinowich, April 16, 2007 (This is the final tracked version prior to the replan).
Changed:
<
<
Revised SEMP (result of Apr/07 replan):
>
>
Revised SEMP (result of Apr-May/07 replan):
 
  • KAON 481 draft: KAON describing the replan - Peter Wizinowich, April 23, 2007.
Changed:
<
<
>
>
  Tracked version of revised SEMP:
Line: 43 to 41
 
Added:
>
>
 

META FILEATTACHMENT attr="" autoattached="1" comment="Replan version 24 excel spreadsheet" date="1177445006" name="NGAO_SD_schedule_v24.xls" path="NGAO_SD_schedule_v24.xls" size="109568" user="Main.PeterWizinowich" version="1"
Line: 56 to 55
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1158791801" name="NGAO_SD_Team_Meetings_v_07.xls" path="NGAO_SD_Team_Meetings_v_07.xls" size="62976" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1159476728" name="NGAO_SD_System_Eng_Mgmt_Plan_v14.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v14.doc" size="1353216" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Summary of 11/29/06 telecon" date="1164912197" name="Summary_of_NGAO_EC_112906.doc" path="Summary_of_NGAO_EC_112906.doc" size="27648" user="Main.PeterWizinowich" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Corrected SDM v1 date" date="1179872294" name="NGAO_SD_schedule_v26.mpp" path="NGAO_SD_schedule_v26.mpp" size="1300480" user="Main.PeterWizinowich" version="2"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/25/06)" date="1159240938" name="NGAO_SD_schedule_v10.mpp" path="NGAO_SD_schedule_v10.mpp" size="579584" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/22/06)" date="1158979993" name="NGAO_SD_schedule_v9.mpp" path="NGAO_SD_schedule_v9.mpp" size="630784" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/12/06)" date="1158089961" name="NGAO_SD_schedule_v7.mpp" path="NGAO_SD_schedule_v7.mpp" size="449536" user="Main.PeterWizinowich" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Few minor corrections" date="1179872342" name="NGAO_SD_schedule_v26.xls" path="NGAO_SD_schedule_v26.xls" size="120832" user="Main.PeterWizinowich" version="2"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Summary of NGAO EC 01/11/07 telecon" date="1168559219" name="Summary_of_NGAO_EC_011107.doc" path="Summary_of_NGAO_EC_011107.doc" size="32768" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1157577088" name="NGAO_SD_System_Eng_Mgmt_Plan_v04.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v04.doc" size="480256" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept 7, 2006" date="1157660734" name="NGAO_SD_System_Eng_Mgmt_Plan_v05.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v05.doc" size="559616" user="Main.DonaldGavel" version="1"
Line: 90 to 91
 
META FILEATTACHMENT attr="" autoattached="1" comment="Includes wk-hrs mapped onto SD SEMP .mpp v10" date="1159249289" name="NGAO_SD_Team_Meetings_v_09.pdf" path="NGAO_SD_Team_Meetings_v_09.pdf" size="15959" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 2" date="1156533845" name="NGAO_WBS_RGD_v_01_level_2.pdf" path="NGAO_WBS_RGD_v_01_level_2.pdf" size="22860" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="pdf version of tracked schedule (1/19/07)" date="1169239397" name="NGAO_SD_schedule_v20.pdf" path="NGAO_SD_schedule_v20.pdf" size="77105" user="Main.PeterWizinowich" version="1"
Added:
>
>
META FILEATTACHMENT attachment="NGAO_SD_schedule_v26.pdf" attr="" comment="Correct SDM v1 dates" date="1179872401" name="NGAO_SD_schedule_v26.pdf" path="V:\ngao system design\NGAO SD schedule v26.pdf" size="126151" stream="V:\ngao system design\NGAO SD schedule v26.pdf" user="Main.PeterWizinowich" version="2"
 
META FILEATTACHMENT attr="" autoattached="1" comment="9/29/06 Version sent to Directors" date="1159587774" name="NGAO_SD_System_Eng_Mgmt_Plan_v20.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v20.doc" size="1435136" user="Main.PeterWizinowich" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1170897870" name="Summary_of_NGAO_EC_020707.doc" path="Summary_of_NGAO_EC_020707.doc" size="32256" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Tracked version of schedule. 3/30/07" date="1175282761" name="NGAO_SD_schedule_v20_tracked.mpp" path="NGAO_SD_schedule_v20_tracked.mpp" size="748544" user="Main.PeterWizinowich" version="3"
META FILEATTACHMENT attr="" autoattached="1" comment="Summary of NGAO EC 12/5/06 telecon" date="1165891340" name="Summary_of_NGAO_EC_120506.doc" path="Summary_of_NGAO_EC_120506.doc" size="33280" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="9/28/06 8:45 pm PDT version" date="1159501554" name="NGAO_SD_System_Eng_Mgmt_Plan_v16.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v16.doc" size="1295872" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Replan version 24" date="1177439104" name="NGAO_SD_schedule_v24_tracked.mpp" path="NGAO_SD_schedule_v24_tracked.mpp" size="1215488" user="Main.PeterWizinowich" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1179869358" name="Summary_of_NGAO_EC_052207.doc" path="Summary_of_NGAO_EC_052207.doc" size="29696" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="pdf version of tracked schedule (3/30/07)" date="1175282812" name="NGAO_SD_schedule_v20_tracked.pdf" path="NGAO_SD_schedule_v20_tracked.pdf" size="104849" user="Main.PeterWizinowich" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1158965808" name="Sci_requirement_Performance_budget_Iterations.pdf" path="Sci_requirement_Performance_budget_Iterations.pdf" size="45806" user="Main.RichardDekany" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="Peter's 9/27/06 version" date="1159413795" name="NGAO_SD_schedule_v14.mpp" path="NGAO_SD_schedule_v14.mpp" size="615936" user="Main.PeterWizinowich" version="1"

Revision 672007-05-12 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
This collection is for System Design Phase Planning and Tracking Documents
Line: 42 to 42
 
Changed:
<
<
>
>
 

META FILEATTACHMENT attr="" autoattached="1" comment="Replan version 24 excel spreadsheet" date="1177445006" name="NGAO_SD_schedule_v24.xls" path="NGAO_SD_schedule_v24.xls" size="109568" user="Main.PeterWizinowich" version="1"
Line: 114 to 114
 
META FILEATTACHMENT attr="" autoattached="1" comment="Final tracked version of SEMP project plan (prior to replan)" date="1177109997" name="NGAO_SD_schedule_v20_final_tracked_version.pdf" path="NGAO_SD_schedule_v20_final_tracked_version.pdf" size="115054" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Summary of 11/22/06 telecon" date="1164912167" name="Summary_of_NGAO_EC_112206.doc" path="Summary_of_NGAO_EC_112206.doc" size="31232" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Final tracked version of original SEMP project plan (prior to replan)" date="1177109698" name="NGAO_SD_schedule_v20_final_tracked_version.mpp" path="NGAO_SD_schedule_v20_final_tracked_version.mpp" size="766464" user="Main.PeterWizinowich" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1178930805" name="Summary_of_NGAO_EC_051107.doc" path="Summary_of_NGAO_EC_051107.doc" size="29696" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/26/06 pm)" date="1159326225" name="NGAO_SD_schedule_v12.mpp" path="NGAO_SD_schedule_v12.mpp" size="631296" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Suggestion for Work Breakdown Structure - in org-chart format" date="1156543102" name="WBS_Architecture_DG_Aug2506.pdf" path="WBS_Architecture_DG_Aug2506.pdf" size="16915" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Replan version 24" date="1177439583" name="NGAO_SD_schedule_v24.mpp" path="NGAO_SD_schedule_v24.mpp" size="1205760" user="Main.PeterWizinowich" version="1"

Revision 662007-05-07 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
This collection is for System Design Phase Planning and Tracking Documents
Line: 19 to 19
 
Added:
>
>
 
Added:
>
>
  Tracked version of revised SEMP:
Line: 61 to 63
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1157577088" name="NGAO_SD_System_Eng_Mgmt_Plan_v04.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v04.doc" size="480256" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept 7, 2006" date="1157660734" name="NGAO_SD_System_Eng_Mgmt_Plan_v05.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v05.doc" size="559616" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Final version used in SEMP + change to Nov. meeting date." date="1162939856" name="NGAO_SD_Team_Meetings_v_10.xls" path="NGAO_SD_Team_Meetings_v_10.xls" size="41472" user="Main.PeterWizinowich" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Replan Version 25" date="1178563739" name="NGAO_SD_schedule_v25.xls" path="NGAO_SD_schedule_v25.xls" size="113664" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1174685917" name="NGAO_SD_System_Eng_Mgmt_Plan_v20.pdf" path="NGAO_SD_System_Eng_Mgmt_Plan_v20.pdf" size="1209970" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Update 1/25/07" date="1169767836" name="NGAO_update_012507.doc" path="NGAO_update_012507.doc" size="29184" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Replan v24" date="1177439607" name="NGAO_SD_schedule_v24.pdf" path="NGAO_SD_schedule_v24.pdf" size="123619" user="Main.PeterWizinowich" version="1"
Line: 75 to 78
 
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Project Report #1 (1/19/07)" date="1169261614" name="Project_Report_1.pdf" path="Project_Report_1.pdf" size="131067" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Project Report #1 (1/19/07)" date="1169261351" name="Project_Report_1.doc" path="Project_Report_1.doc" size="155136" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Project Report #2" date="1175546968" name="Project_Report_2.pdf" path="Project_Report_2.pdf" size="111962" user="Main.PeterWizinowich" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Replan v25" date="1178563699" name="NGAO_SD_schedule_v25.mpp" path="NGAO_SD_schedule_v25.mpp" size="1253376" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Tracked version of schedule. 1/19/07" date="1169239343" name="NGAO_SD_schedule_v20.mpp" path="NGAO_SD_schedule_v20.mpp" size="638464" user="Main.PeterWizinowich" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="Rich's pass - now handing back to Peter" date="1159343456" name="NGAO_SD_schedule_v13.mpp" path="NGAO_SD_schedule_v13.mpp" size="610816" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Includes wk-hrs mapped onto SD SEMP .mpp v10" date="1159249216" name="NGAO_SD_Team_Meetings_v_09.xls" path="NGAO_SD_Team_Meetings_v_09.xls" size="61440" user="Main.RichardDekany" version="1"

Revision 652007-04-24 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
This collection is for System Design Phase Planning and Tracking Documents

EC Telecon Dial-in Number 877-280-4645 with passcode 540030 (via WMKO)

Changed:
<
<
Systems Engineering Management Plan (SEMP):
>
>
Systems Engineering Management Plan (SEMP):
 
Changed:
<
<
Tracked Version of Original SEMP (valid Sept/06 through Apr/07):
>
>
Tracked Version of Original SEMP (valid Sept/06 through Apr/07):
 
Changed:
<
<
  • NGAO_SD_schedule_v20_tracked.xls: Excel version of the tracked project plan. See the color code at the bottom of the spreadsheet. Also note that the "Plan" column indicates which WBS elements requires Work Scope Planning Sheets - Peter Wizinowich, Mar. 30, 2007.
>
>
  • NGAO_SD_schedule_v20_tracked_final.xls: Excel version of the tracked project plan. See the color code at the bottom of the spreadsheet. Also note that the "Plan" column indicates which WBS elements requires Work Scope Planning Sheets - Peter Wizinowich, April 16, 2007 (This is the final tracked version prior to the replan).
 
Changed:
<
<
Revised SEMP (result of Apr/07 replan):
>
>
Revised SEMP (result of Apr/07 replan):
 
Changed:
<
<
  • KAON 481.doc: KAON describing the replan - Peter Wizinowich, April 23, 2007.
>
>
  • KAON 481 draft: KAON describing the replan - Peter Wizinowich, April 23, 2007.
 
Changed:
<
<
>
>
 
Changed:
<
<
Tracked version of revised SEMP:
>
>
Tracked version of revised SEMP:
 
Changed:
<
<
Project Reports:
>
>
Project Reports:
 
Changed:
<
<
NGAO Executive Committee Telecon Summaries:
>
>
NGAO Executive Committee Telecon Summaries:
 
Line: 43 to 43
 
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Replan version 24 excel spreadsheet" date="1177445006" name="NGAO_SD_schedule_v24.xls" path="NGAO_SD_schedule_v24.xls" size="109568" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="(PDF form of above)" date="1157577901" name="NGAO_SD_schedule_v6.pdf" path="NGAO_SD_schedule_v6.pdf" size="58177" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Month-by-month look at assignments" date="1170210406" name="NGAO_SD_Resource_Usage_Report.pdf" path="NGAO_SD_Resource_Usage_Report.pdf" size="69809" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="9/28/06 2:45 pm PDT version" date="1159479841" name="NGAO_SD_schedule_v16.mpp" path="NGAO_SD_schedule_v16.mpp" size="640000" user="Main.PeterWizinowich" version="2"
Line: 62 to 63
 
META FILEATTACHMENT attr="" autoattached="1" comment="Final version used in SEMP + change to Nov. meeting date." date="1162939856" name="NGAO_SD_Team_Meetings_v_10.xls" path="NGAO_SD_Team_Meetings_v_10.xls" size="41472" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1174685917" name="NGAO_SD_System_Eng_Mgmt_Plan_v20.pdf" path="NGAO_SD_System_Eng_Mgmt_Plan_v20.pdf" size="1209970" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Update 1/25/07" date="1169767836" name="NGAO_update_012507.doc" path="NGAO_update_012507.doc" size="29184" user="Main.PeterWizinowich" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Replan v24" date="1177439607" name="NGAO_SD_schedule_v24.pdf" path="NGAO_SD_schedule_v24.pdf" size="123619" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept. 22, 2006" date="1158979846" name="NGAO_SD_System_Eng_Mgmt_Plan_v11.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v11.doc" size="1267712" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Project Report #2" date="1175372953" name="Project_Report_2.doc" path="Project_Report_2.doc" size="138752" user="Main.PeterWizinowich" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept. 25, 2006" date="1159240995" name="NGAO_SD_System_Eng_Mgmt_Plan_v12.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v12.doc" size="1308672" user="Main.PeterWizinowich" version="1"
Line: 100 to 102
 
META FILEATTACHMENT attr="" autoattached="1" comment="Planning sheet to be used for defining the work scope for a WBS element. To be used prior to performing significant work on a WBS element." date="1163033650" name="NGAOWorkScopePlanningSheet.doc" path="NGAOWorkScopePlanningSheet.doc" size="126976" user="Main.PeterWizinowich" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="02/28/07 EC meeting summary" date="1172709442" name="Summary_of_NGAO_EC_022807.doc" path="Summary_of_NGAO_EC_022807.doc" size="32768" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept. 26, 2006" date="1159309264" name="NGAO_SD_System_Eng_Mgmt_Plan_v13.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v13.doc" size="1347584" user="Main.PeterWizinowich" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Final update of v20 tracked schedule" date="1177444855" name="NGAO_SD_schedule_v20_tracked_final.xls" path="NGAO_SD_schedule_v20_tracked_final.xls" size="72704" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1159466578" name="NGAO_SD_schedule_v15.mpp" path="NGAO_SD_schedule_v15.mpp" size="598528" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="SSC Report (1/24/07)" date="1169655025" name="SSC_NGAO_Report_0107.ppt" path="SSC_NGAO_Report_0107.ppt" size="1472000" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Final meeting schedule used in SEMP + change to Nov. meeting date." date="1162939993" name="NGAO_SD_Team_Meetings_v_10.pdf" path="NGAO_SD_Team_Meetings_v_10.pdf" size="16565" user="Main.PeterWizinowich" version="1"
Line: 111 to 114
 
META FILEATTACHMENT attr="" autoattached="1" comment="Suggestion for Work Breakdown Structure - in org-chart format" date="1156543102" name="WBS_Architecture_DG_Aug2506.pdf" path="WBS_Architecture_DG_Aug2506.pdf" size="16915" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Replan version 24" date="1177439583" name="NGAO_SD_schedule_v24.mpp" path="NGAO_SD_schedule_v24.mpp" size="1205760" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Early draft, WBS structure unclear" date="1156449903" name="SD_phase_WBS_dictionary_v03.xls" path="SD_phase_WBS_dictionary_v03.xls" size="37376" user="Main.RichardDekany" version="1"
Deleted:
<
<
META FILEATTACHMENT attachment="NGAO_SD_schedule_v24.pdf" attr="" comment="Replan v24" date="1177439607" name="NGAO_SD_schedule_v24.pdf" path="V:\ngao system design\NGAO SD schedule v24.pdf" size="123619" stream="V:\ngao system design\NGAO SD schedule v24.pdf" user="Main.PeterWizinowich" version="1"

Revision 642007-04-24 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
This collection is for System Design Phase Planning and Tracking Documents
Line: 22 to 22
 

Tracked version of revised SEMP:

Changed:
<
<
>
>
  Project Reports:
Line: 89 to 89
 
META FILEATTACHMENT attr="" autoattached="1" comment="Tracked version of schedule. 3/30/07" date="1175282761" name="NGAO_SD_schedule_v20_tracked.mpp" path="NGAO_SD_schedule_v20_tracked.mpp" size="748544" user="Main.PeterWizinowich" version="3"
META FILEATTACHMENT attr="" autoattached="1" comment="Summary of NGAO EC 12/5/06 telecon" date="1165891340" name="Summary_of_NGAO_EC_120506.doc" path="Summary_of_NGAO_EC_120506.doc" size="33280" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="9/28/06 8:45 pm PDT version" date="1159501554" name="NGAO_SD_System_Eng_Mgmt_Plan_v16.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v16.doc" size="1295872" user="Main.PeterWizinowich" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Replan version 24" date="1177439104" name="NGAO_SD_schedule_v24_tracked.mpp" path="NGAO_SD_schedule_v24_tracked.mpp" size="1215488" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="pdf version of tracked schedule (3/30/07)" date="1175282812" name="NGAO_SD_schedule_v20_tracked.pdf" path="NGAO_SD_schedule_v20_tracked.pdf" size="104849" user="Main.PeterWizinowich" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1158965808" name="Sci_requirement_Performance_budget_Iterations.pdf" path="Sci_requirement_Performance_budget_Iterations.pdf" size="45806" user="Main.RichardDekany" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="Peter's 9/27/06 version" date="1159413795" name="NGAO_SD_schedule_v14.mpp" path="NGAO_SD_schedule_v14.mpp" size="615936" user="Main.PeterWizinowich" version="1"
Line: 108 to 109
 
META FILEATTACHMENT attr="" autoattached="1" comment="Final tracked version of original SEMP project plan (prior to replan)" date="1177109698" name="NGAO_SD_schedule_v20_final_tracked_version.mpp" path="NGAO_SD_schedule_v20_final_tracked_version.mpp" size="766464" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/26/06 pm)" date="1159326225" name="NGAO_SD_schedule_v12.mpp" path="NGAO_SD_schedule_v12.mpp" size="631296" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Suggestion for Work Breakdown Structure - in org-chart format" date="1156543102" name="WBS_Architecture_DG_Aug2506.pdf" path="WBS_Architecture_DG_Aug2506.pdf" size="16915" user="Main.DonaldGavel" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Replan version 24" date="1177439583" name="NGAO_SD_schedule_v24.mpp" path="NGAO_SD_schedule_v24.mpp" size="1205760" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Early draft, WBS structure unclear" date="1156449903" name="SD_phase_WBS_dictionary_v03.xls" path="SD_phase_WBS_dictionary_v03.xls" size="37376" user="Main.RichardDekany" version="1"
Added:
>
>
META FILEATTACHMENT attachment="NGAO_SD_schedule_v24.pdf" attr="" comment="Replan v24" date="1177439607" name="NGAO_SD_schedule_v24.pdf" path="V:\ngao system design\NGAO SD schedule v24.pdf" size="123619" stream="V:\ngao system design\NGAO SD schedule v24.pdf" user="Main.PeterWizinowich" version="1"

Revision 632007-04-24 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
This collection is for System Design Phase Planning and Tracking Documents
Line: 16 to 16
 
  • NGAO_SD_schedule_v20_tracked.xls: Excel version of the tracked project plan. See the color code at the bottom of the spreadsheet. Also note that the "Plan" column indicates which WBS elements requires Work Scope Planning Sheets - Peter Wizinowich, Mar. 30, 2007.

Revised SEMP (result of Apr/07 replan):

Changed:
<
<
>
>
  Tracked version of revised SEMP: * NGAO_SD_schedule_v23_tracked.mpp: Tracked version of the revised project plan (post-replan) - Peter Wizinowich, April 16, 2007 (v23_tracked.pdf)

Revision 622007-04-20 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
This collection is for System Design Phase Planning and Tracking Documents
Line: 9 to 9
 
Deleted:
<
<
Work Assignments:
 
Changed:
<
<
Tracked Version of SEMP:
>
>
Tracked Version of Original SEMP (valid Sept/06 through Apr/07):
 
  • NGAO_SD_schedule_v20_tracked.xls: Excel version of the tracked project plan. See the color code at the bottom of the spreadsheet. Also note that the "Plan" column indicates which WBS elements requires Work Scope Planning Sheets - Peter Wizinowich, Mar. 30, 2007.
Added:
>
>
Revised SEMP (result of Apr/07 replan):

Tracked version of revised SEMP: * NGAO_SD_schedule_v23_tracked.mpp: Tracked version of the revised project plan (post-replan) - Peter Wizinowich, April 16, 2007 (v23_tracked.pdf)

 Project Reports:
Line: 36 to 41
 
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="(PDF form of above)" date="1157577901" name="NGAO_SD_schedule_v6.pdf" path="NGAO_SD_schedule_v6.pdf" size="58177" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Month-by-month look at assignments" date="1170210406" name="NGAO_SD_Resource_Usage_Report.pdf" path="NGAO_SD_Resource_Usage_Report.pdf" size="69809" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="9/28/06 2:45 pm PDT version" date="1159479841" name="NGAO_SD_schedule_v16.mpp" path="NGAO_SD_schedule_v16.mpp" size="640000" user="Main.PeterWizinowich" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="version insertable into SD SEMP" date="1159249694" name="NGAO_SD_Team_Meetings_v_09.tiff" path="NGAO_SD_Team_Meetings_v_09.tiff" size="11238144" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="SSC Report 04/03/07" date="1175558014" name="SSC_NGAO_Report_0407.ppt" path="SSC_NGAO_Report_0407.ppt" size="2852352" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 3" date="1156533867" name="NGAO_WBS_RGD_v_01_level_3.pdf" path="NGAO_WBS_RGD_v_01_level_3.pdf" size="36072" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1158183658" name="NGAO_SD_schedule_v7.pdf" path="NGAO_SD_schedule_v7.pdf" size="66532" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1158791801" name="NGAO_SD_Team_Meetings_v_07.xls" path="NGAO_SD_Team_Meetings_v_07.xls" size="62976" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1159476728" name="NGAO_SD_System_Eng_Mgmt_Plan_v14.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v14.doc" size="1353216" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Summary of 11/29/06 telecon" date="1164912197" name="Summary_of_NGAO_EC_112906.doc" path="Summary_of_NGAO_EC_112906.doc" size="27648" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/25/06)" date="1159240938" name="NGAO_SD_schedule_v10.mpp" path="NGAO_SD_schedule_v10.mpp" size="579584" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/22/06)" date="1158979993" name="NGAO_SD_schedule_v9.mpp" path="NGAO_SD_schedule_v9.mpp" size="630784" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/12/06)" date="1158089961" name="NGAO_SD_schedule_v7.mpp" path="NGAO_SD_schedule_v7.mpp" size="449536" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Summary of NGAO EC 01/11/07 telecon" date="1168559219" name="Summary_of_NGAO_EC_011107.doc" path="Summary_of_NGAO_EC_011107.doc" size="32768" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1157577088" name="NGAO_SD_System_Eng_Mgmt_Plan_v04.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v04.doc" size="480256" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept 7, 2006" date="1157660734" name="NGAO_SD_System_Eng_Mgmt_Plan_v05.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v05.doc" size="559616" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Final version used in SEMP + change to Nov. meeting date." date="1162939856" name="NGAO_SD_Team_Meetings_v_10.xls" path="NGAO_SD_Team_Meetings_v_10.xls" size="41472" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1174685917" name="NGAO_SD_System_Eng_Mgmt_Plan_v20.pdf" path="NGAO_SD_System_Eng_Mgmt_Plan_v20.pdf" size="1209970" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Update 1/25/07" date="1169767836" name="NGAO_update_012507.doc" path="NGAO_update_012507.doc" size="29184" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept. 22, 2006" date="1158979846" name="NGAO_SD_System_Eng_Mgmt_Plan_v11.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v11.doc" size="1267712" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Project Report #2" date="1175372953" name="Project_Report_2.doc" path="Project_Report_2.doc" size="138752" user="Main.PeterWizinowich" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept. 25, 2006" date="1159240995" name="NGAO_SD_System_Eng_Mgmt_Plan_v12.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v12.doc" size="1308672" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="9/28/07 8:40 pm PDT version" date="1159501283" name="NGAO_SD_schedule_v17.mpp" path="NGAO_SD_schedule_v17.mpp" size="660992" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept. 12, 2006" date="1158090082" name="NGAO_SD_System_Eng_Mgmt_Plan_v09.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v09.doc" size="1249792" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/26/06)" date="1159309314" name="NGAO_SD_schedule_v11.mpp" path="NGAO_SD_schedule_v11.mpp" size="766976" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="revised - includes enties for real-time controller" date="1156545727" name="Keck_NGAO_WBS_Dictionary_(partial,_draft_8-25-06_rev1,_DG).pdf" path="Keck_NGAO_WBS_Dictionary_(partial,_draft_8-25-06_rev1,_DG).pdf" size="93422" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="TIFF format" date="1159392091" name="Sci_requirement_Performance_budget_Iterations_v1.tiff" path="Sci_requirement_Performance_budget_Iterations_v1.tiff" size="155728" user="Main.RichardDekany" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Project Report #1 (1/19/07)" date="1169261614" name="Project_Report_1.pdf" path="Project_Report_1.pdf" size="131067" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Project Report #1 (1/19/07)" date="1169261351" name="Project_Report_1.doc" path="Project_Report_1.doc" size="155136" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Project Report #2" date="1175546968" name="Project_Report_2.pdf" path="Project_Report_2.pdf" size="111962" user="Main.PeterWizinowich" version="1"
Deleted:
<
<
META FILEATTACHMENT attr="" autoattached="1" comment="(PDF form of above)" date="1157577901" name="NGAO_SD_schedule_v6.pdf" path="NGAO_SD_schedule_v6.pdf" size="58177" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Month-by-month look at assignments" date="1170210406" name="NGAO_SD_Resource_Usage_Report.pdf" path="NGAO_SD_Resource_Usage_Report.pdf" size="69809" user="Main.RichardDekany" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Tracked version of schedule. 1/19/07" date="1169239343" name="NGAO_SD_schedule_v20.mpp" path="NGAO_SD_schedule_v20.mpp" size="638464" user="Main.PeterWizinowich" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="Rich's pass - now handing back to Peter" date="1159343456" name="NGAO_SD_schedule_v13.mpp" path="NGAO_SD_schedule_v13.mpp" size="610816" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Includes wk-hrs mapped onto SD SEMP .mpp v10" date="1159249216" name="NGAO_SD_Team_Meetings_v_09.xls" path="NGAO_SD_Team_Meetings_v_09.xls" size="61440" user="Main.RichardDekany" version="1"
Deleted:
<
<
META FILEATTACHMENT attr="" autoattached="1" comment="9/28/06 2:45 pm PDT version" date="1159479841" name="NGAO_SD_schedule_v16.mpp" path="NGAO_SD_schedule_v16.mpp" size="640000" user="Main.PeterWizinowich" version="2"
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1172112060" name="Summary_of_NGAO_EC_022107.doc" path="Summary_of_NGAO_EC_022107.doc" size="32256" user="Main.PeterWizinowich" version="1"
Deleted:
<
<
META FILEATTACHMENT attr="" autoattached="1" comment="version insertable into SD SEMP" date="1159249694" name="NGAO_SD_Team_Meetings_v_09.tiff" path="NGAO_SD_Team_Meetings_v_09.tiff" size="11238144" user="Main.RichardDekany" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept 11, 2006" date="1158006879" name="NGAO_SD_System_Eng_Mgmt_Plan_v08.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v08.doc" size="1090560" user="Main.PeterWizinowich" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan" date="1157577832" name="NGAO_SD_schedule_v6.mpp" path="NGAO_SD_schedule_v6.mpp" size="262656" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Excel version of the tracked project plan (updated 3/30/07)" date="1175283000" name="NGAO_SD_schedule_v20_tracked.xls" path="NGAO_SD_schedule_v20_tracked.xls" size="72704" user="Main.PeterWizinowich" version="10"
Deleted:
<
<
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 3" date="1156533867" name="NGAO_WBS_RGD_v_01_level_3.pdf" path="NGAO_WBS_RGD_v_01_level_3.pdf" size="36072" user="Main.RichardDekany" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1158967784" name="Sci_requirement_Performance_budget_Iterations_v02.pdf" path="Sci_requirement_Performance_budget_Iterations_v02.pdf" size="45806" user="Main.RichardDekany" version="1"
Deleted:
<
<
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1158183658" name="NGAO_SD_schedule_v7.pdf" path="NGAO_SD_schedule_v7.pdf" size="66532" user="Main.RichardDekany" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Includes wk-hrs mapped onto SD SEMP .mpp v10" date="1159249289" name="NGAO_SD_Team_Meetings_v_09.pdf" path="NGAO_SD_Team_Meetings_v_09.pdf" size="15959" user="Main.RichardDekany" version="1"
Deleted:
<
<
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1158791801" name="NGAO_SD_Team_Meetings_v_07.xls" path="NGAO_SD_Team_Meetings_v_07.xls" size="62976" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1159476728" name="NGAO_SD_System_Eng_Mgmt_Plan_v14.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v14.doc" size="1353216" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Summary of 11/29/06 telecon" date="1164912197" name="Summary_of_NGAO_EC_112906.doc" path="Summary_of_NGAO_EC_112906.doc" size="27648" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 2" date="1156533845" name="NGAO_WBS_RGD_v_01_level_2.pdf" path="NGAO_WBS_RGD_v_01_level_2.pdf" size="22860" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="pdf version of tracked schedule (1/19/07)" date="1169239397" name="NGAO_SD_schedule_v20.pdf" path="NGAO_SD_schedule_v20.pdf" size="77105" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="9/29/06 Version sent to Directors" date="1159587774" name="NGAO_SD_System_Eng_Mgmt_Plan_v20.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v20.doc" size="1435136" user="Main.PeterWizinowich" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1170897870" name="Summary_of_NGAO_EC_020707.doc" path="Summary_of_NGAO_EC_020707.doc" size="32256" user="Main.PeterWizinowich" version="1"
Deleted:
<
<
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/25/06)" date="1159240938" name="NGAO_SD_schedule_v10.mpp" path="NGAO_SD_schedule_v10.mpp" size="579584" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/22/06)" date="1158979993" name="NGAO_SD_schedule_v9.mpp" path="NGAO_SD_schedule_v9.mpp" size="630784" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Tracked version of schedule. 3/30/07" date="1175282761" name="NGAO_SD_schedule_v20_tracked.mpp" path="NGAO_SD_schedule_v20_tracked.mpp" size="748544" user="Main.PeterWizinowich" version="3"
META FILEATTACHMENT attr="" autoattached="1" comment="Summary of NGAO EC 12/5/06 telecon" date="1165891340" name="Summary_of_NGAO_EC_120506.doc" path="Summary_of_NGAO_EC_120506.doc" size="33280" user="Main.PeterWizinowich" version="1"
Deleted:
<
<
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/12/06)" date="1158089961" name="NGAO_SD_schedule_v7.mpp" path="NGAO_SD_schedule_v7.mpp" size="449536" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="9/28/06 8:45 pm PDT version" date="1159501554" name="NGAO_SD_System_Eng_Mgmt_Plan_v16.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v16.doc" size="1295872" user="Main.PeterWizinowich" version="1"
Deleted:
<
<
META FILEATTACHMENT attr="" autoattached="1" comment="Summary of NGAO EC 01/11/07 telecon" date="1168559219" name="Summary_of_NGAO_EC_011107.doc" path="Summary_of_NGAO_EC_011107.doc" size="32768" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="pdf version of tracked schedule (3/30/07)" date="1175282812" name="NGAO_SD_schedule_v20_tracked.pdf" path="NGAO_SD_schedule_v20_tracked.pdf" size="104849" user="Main.PeterWizinowich" version="2"
Deleted:
<
<
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1157577088" name="NGAO_SD_System_Eng_Mgmt_Plan_v04.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v04.doc" size="480256" user="Main.DonaldGavel" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1158965808" name="Sci_requirement_Performance_budget_Iterations.pdf" path="Sci_requirement_Performance_budget_Iterations.pdf" size="45806" user="Main.RichardDekany" version="2"
Deleted:
<
<
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept 7, 2006" date="1157660734" name="NGAO_SD_System_Eng_Mgmt_Plan_v05.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v05.doc" size="559616" user="Main.DonaldGavel" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Peter's 9/27/06 version" date="1159413795" name="NGAO_SD_schedule_v14.mpp" path="NGAO_SD_schedule_v14.mpp" size="615936" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="WBS cleaned, but not perfect; work flow updated" date="1159557592" name="NGAO_SD_System_Eng_Mgmt_Plan_v17.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v17.doc" size="1526784" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Org chart as of Sept 7, 2006" date="1157660777" name="NGAO_SD_org_chart.vsd" path="NGAO_SD_org_chart.vsd" size="113664" user="Main.DonaldGavel" version="1"
Deleted:
<
<
META FILEATTACHMENT attr="" autoattached="1" comment="Final version used in SEMP + change to Nov. meeting date." date="1162939856" name="NGAO_SD_Team_Meetings_v_10.xls" path="NGAO_SD_Team_Meetings_v_10.xls" size="41472" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Updated 9/22/06" date="1158965020" name="NGAO_SD_Team_Meetings_v_08.xls" path="NGAO_SD_Team_Meetings_v_08.xls" size="62976" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 6" date="1156533887" name="NGAO_WBS_RGD_v_01_level_6.pdf" path="NGAO_WBS_RGD_v_01_level_6.pdf" size="46247" user="Main.RichardDekany" version="1"
Deleted:
<
<
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1174685917" name="NGAO_SD_System_Eng_Mgmt_Plan_v20.pdf" path="NGAO_SD_System_Eng_Mgmt_Plan_v20.pdf" size="1209970" user="Main.DonaldGavel" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Planning sheet to be used for defining the work scope for a WBS element. To be used prior to performing significant work on a WBS element." date="1163033650" name="NGAOWorkScopePlanningSheet.doc" path="NGAOWorkScopePlanningSheet.doc" size="126976" user="Main.PeterWizinowich" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="02/28/07 EC meeting summary" date="1172709442" name="Summary_of_NGAO_EC_022807.doc" path="Summary_of_NGAO_EC_022807.doc" size="32768" user="Main.PeterWizinowich" version="1"
Deleted:
<
<
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Update 1/25/07" date="1169767836" name="NGAO_update_012507.doc" path="NGAO_update_012507.doc" size="29184" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept. 22, 2006" date="1158979846" name="NGAO_SD_System_Eng_Mgmt_Plan_v11.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v11.doc" size="1267712" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Project Report #2" date="1175372953" name="Project_Report_2.doc" path="Project_Report_2.doc" size="138752" user="Main.PeterWizinowich" version="2"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept. 26, 2006" date="1159309264" name="NGAO_SD_System_Eng_Mgmt_Plan_v13.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v13.doc" size="1347584" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1159466578" name="NGAO_SD_schedule_v15.mpp" path="NGAO_SD_schedule_v15.mpp" size="598528" user="Main.RichardDekany" version="1"
Deleted:
<
<
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept. 25, 2006" date="1159240995" name="NGAO_SD_System_Eng_Mgmt_Plan_v12.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v12.doc" size="1308672" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="9/28/07 8:40 pm PDT version" date="1159501283" name="NGAO_SD_schedule_v17.mpp" path="NGAO_SD_schedule_v17.mpp" size="660992" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="SSC Report (1/24/07)" date="1169655025" name="SSC_NGAO_Report_0107.ppt" path="SSC_NGAO_Report_0107.ppt" size="1472000" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Final meeting schedule used in SEMP + change to Nov. meeting date." date="1162939993" name="NGAO_SD_Team_Meetings_v_10.pdf" path="NGAO_SD_Team_Meetings_v_10.pdf" size="16565" user="Main.PeterWizinowich" version="1"
Deleted:
<
<
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept. 12, 2006" date="1158090082" name="NGAO_SD_System_Eng_Mgmt_Plan_v09.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v09.doc" size="1249792" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1168282149" name="Summary_of_NGAO_EC_121506.doc" path="Summary_of_NGAO_EC_121506.doc" size="30720" user="Main.DonaldGavel" version="1"
Changed:
<
<
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/26/06)" date="1159309314" name="NGAO_SD_schedule_v11.mpp" path="NGAO_SD_schedule_v11.mpp" size="766976" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="revised - includes enties for real-time controller" date="1156545727" name="Keck_NGAO_WBS_Dictionary_(partial,_draft_8-25-06_rev1,_DG).pdf" path="Keck_NGAO_WBS_Dictionary_(partial,_draft_8-25-06_rev1,_DG).pdf" size="93422" user="Main.DonaldGavel" version="1"
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Final tracked version of SEMP project plan (prior to replan)" date="1177109997" name="NGAO_SD_schedule_v20_final_tracked_version.pdf" path="NGAO_SD_schedule_v20_final_tracked_version.pdf" size="115054" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Summary of 11/22/06 telecon" date="1164912167" name="Summary_of_NGAO_EC_112206.doc" path="Summary_of_NGAO_EC_112206.doc" size="31232" user="Main.PeterWizinowich" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Final tracked version of original SEMP project plan (prior to replan)" date="1177109698" name="NGAO_SD_schedule_v20_final_tracked_version.mpp" path="NGAO_SD_schedule_v20_final_tracked_version.mpp" size="766464" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/26/06 pm)" date="1159326225" name="NGAO_SD_schedule_v12.mpp" path="NGAO_SD_schedule_v12.mpp" size="631296" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Suggestion for Work Breakdown Structure - in org-chart format" date="1156543102" name="WBS_Architecture_DG_Aug2506.pdf" path="WBS_Architecture_DG_Aug2506.pdf" size="16915" user="Main.DonaldGavel" version="1"
Deleted:
<
<
META FILEATTACHMENT attr="" autoattached="1" comment="TIFF format" date="1159392091" name="Sci_requirement_Performance_budget_Iterations_v1.tiff" path="Sci_requirement_Performance_budget_Iterations_v1.tiff" size="155728" user="Main.RichardDekany" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Early draft, WBS structure unclear" date="1156449903" name="SD_phase_WBS_dictionary_v03.xls" path="SD_phase_WBS_dictionary_v03.xls" size="37376" user="Main.RichardDekany" version="1"
Deleted:
<
<
META FILEATTACHMENT attachment="SSC_NGAO_Report_0407.ppt" attr="" comment="SSC Report 04/03/07" date="1175558014" name="SSC_NGAO_Report_0407.ppt" path="V:\ngao system design\SSC NGAO Report 0407.ppt" size="2852352" stream="V:\ngao system design\SSC NGAO Report 0407.ppt" user="Main.PeterWizinowich" version="1"

Revision 612007-04-02 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
This collection is for System Design Phase Planning and Tracking Documents
Line: 38 to 38
 
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Project Report #1 (1/19/07)" date="1169261614" name="Project_Report_1.pdf" path="Project_Report_1.pdf" size="131067" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Project Report #1 (1/19/07)" date="1169261351" name="Project_Report_1.doc" path="Project_Report_1.doc" size="155136" user="Main.PeterWizinowich" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Project Report #2" date="1175546968" name="Project_Report_2.pdf" path="Project_Report_2.pdf" size="111962" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="(PDF form of above)" date="1157577901" name="NGAO_SD_schedule_v6.pdf" path="NGAO_SD_schedule_v6.pdf" size="58177" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Month-by-month look at assignments" date="1170210406" name="NGAO_SD_Resource_Usage_Report.pdf" path="NGAO_SD_Resource_Usage_Report.pdf" size="69809" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Tracked version of schedule. 1/19/07" date="1169239343" name="NGAO_SD_schedule_v20.mpp" path="NGAO_SD_schedule_v20.mpp" size="638464" user="Main.PeterWizinowich" version="2"
Line: 98 to 99
 
META FILEATTACHMENT attr="" autoattached="1" comment="Suggestion for Work Breakdown Structure - in org-chart format" date="1156543102" name="WBS_Architecture_DG_Aug2506.pdf" path="WBS_Architecture_DG_Aug2506.pdf" size="16915" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="TIFF format" date="1159392091" name="Sci_requirement_Performance_budget_Iterations_v1.tiff" path="Sci_requirement_Performance_budget_Iterations_v1.tiff" size="155728" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Early draft, WBS structure unclear" date="1156449903" name="SD_phase_WBS_dictionary_v03.xls" path="SD_phase_WBS_dictionary_v03.xls" size="37376" user="Main.RichardDekany" version="1"
Changed:
<
<
META FILEATTACHMENT attachment="Project_Report_2.pdf" attr="" comment="Project Report #2" date="1175546968" name="Project_Report_2.pdf" path="V:\ngao system design\Project Report 2.pdf" size="111962" stream="V:\ngao system design\Project Report 2.pdf" user="Main.PeterWizinowich" version="1"
>
>
META FILEATTACHMENT attachment="SSC_NGAO_Report_0407.ppt" attr="" comment="SSC Report 04/03/07" date="1175558014" name="SSC_NGAO_Report_0407.ppt" path="V:\ngao system design\SSC NGAO Report 0407.ppt" size="2852352" stream="V:\ngao system design\SSC NGAO Report 0407.ppt" user="Main.PeterWizinowich" version="1"

Revision 602007-04-02 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
This collection is for System Design Phase Planning and Tracking Documents
Line: 98 to 98
 
META FILEATTACHMENT attr="" autoattached="1" comment="Suggestion for Work Breakdown Structure - in org-chart format" date="1156543102" name="WBS_Architecture_DG_Aug2506.pdf" path="WBS_Architecture_DG_Aug2506.pdf" size="16915" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="TIFF format" date="1159392091" name="Sci_requirement_Performance_budget_Iterations_v1.tiff" path="Sci_requirement_Performance_budget_Iterations_v1.tiff" size="155728" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Early draft, WBS structure unclear" date="1156449903" name="SD_phase_WBS_dictionary_v03.xls" path="SD_phase_WBS_dictionary_v03.xls" size="37376" user="Main.RichardDekany" version="1"
Added:
>
>
META FILEATTACHMENT attachment="Project_Report_2.pdf" attr="" comment="Project Report #2" date="1175546968" name="Project_Report_2.pdf" path="V:\ngao system design\Project Report 2.pdf" size="111962" stream="V:\ngao system design\Project Report 2.pdf" user="Main.PeterWizinowich" version="1"

Revision 592007-03-31 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
This collection is for System Design Phase Planning and Tracking Documents
Line: 20 to 20
 Project Reports:
Changed:
<
<
>
>
 

NGAO Executive Committee Telecon Summaries:

Line: 82 to 82
 
META FILEATTACHMENT attr="" autoattached="1" comment="02/28/07 EC meeting summary" date="1172709442" name="Summary_of_NGAO_EC_022807.doc" path="Summary_of_NGAO_EC_022807.doc" size="32768" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Update 1/25/07" date="1169767836" name="NGAO_update_012507.doc" path="NGAO_update_012507.doc" size="29184" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept. 22, 2006" date="1158979846" name="NGAO_SD_System_Eng_Mgmt_Plan_v11.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v11.doc" size="1267712" user="Main.PeterWizinowich" version="1"
Changed:
<
<
META FILEATTACHMENT attr="" autoattached="1" comment="Project Report #2" date="1175300879" name="Project_Report_2.doc" path="Project_Report_2.doc" size="147456" user="Main.PeterWizinowich" version="1"
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Project Report #2" date="1175372953" name="Project_Report_2.doc" path="Project_Report_2.doc" size="138752" user="Main.PeterWizinowich" version="2"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept. 26, 2006" date="1159309264" name="NGAO_SD_System_Eng_Mgmt_Plan_v13.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v13.doc" size="1347584" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1159466578" name="NGAO_SD_schedule_v15.mpp" path="NGAO_SD_schedule_v15.mpp" size="598528" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept. 25, 2006" date="1159240995" name="NGAO_SD_System_Eng_Mgmt_Plan_v12.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v12.doc" size="1308672" user="Main.PeterWizinowich" version="1"

Revision 582007-03-31 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
This collection is for System Design Phase Planning and Tracking Documents
Line: 20 to 20
 Project Reports:
Added:
>
>
  NGAO Executive Committee Telecon Summaries:
Line: 80 to 82
 
META FILEATTACHMENT attr="" autoattached="1" comment="02/28/07 EC meeting summary" date="1172709442" name="Summary_of_NGAO_EC_022807.doc" path="Summary_of_NGAO_EC_022807.doc" size="32768" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Update 1/25/07" date="1169767836" name="NGAO_update_012507.doc" path="NGAO_update_012507.doc" size="29184" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept. 22, 2006" date="1158979846" name="NGAO_SD_System_Eng_Mgmt_Plan_v11.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v11.doc" size="1267712" user="Main.PeterWizinowich" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Project Report #2" date="1175300879" name="Project_Report_2.doc" path="Project_Report_2.doc" size="147456" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept. 26, 2006" date="1159309264" name="NGAO_SD_System_Eng_Mgmt_Plan_v13.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v13.doc" size="1347584" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1159466578" name="NGAO_SD_schedule_v15.mpp" path="NGAO_SD_schedule_v15.mpp" size="598528" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept. 25, 2006" date="1159240995" name="NGAO_SD_System_Eng_Mgmt_Plan_v12.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v12.doc" size="1308672" user="Main.PeterWizinowich" version="1"

Revision 572007-03-30 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
This collection is for System Design Phase Planning and Tracking Documents
Line: 14 to 14
 

Tracked Version of SEMP:

Changed:
<
<
>
>
  Project Reports:
Line: 46 to 46
 
META FILEATTACHMENT attr="" autoattached="1" comment="version insertable into SD SEMP" date="1159249694" name="NGAO_SD_Team_Meetings_v_09.tiff" path="NGAO_SD_Team_Meetings_v_09.tiff" size="11238144" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept 11, 2006" date="1158006879" name="NGAO_SD_System_Eng_Mgmt_Plan_v08.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v08.doc" size="1090560" user="Main.PeterWizinowich" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan" date="1157577832" name="NGAO_SD_schedule_v6.mpp" path="NGAO_SD_schedule_v6.mpp" size="262656" user="Main.DonaldGavel" version="1"
Changed:
<
<
META FILEATTACHMENT attr="" autoattached="1" comment="Excel version of the tracked project plan (updated 3/21/07)" date="1174508705" name="NGAO_SD_schedule_v20_tracked.xls" path="NGAO_SD_schedule_v20_tracked.xls" size="72704" user="Main.PeterWizinowich" version="8"
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Excel version of the tracked project plan (updated 3/30/07)" date="1175283000" name="NGAO_SD_schedule_v20_tracked.xls" path="NGAO_SD_schedule_v20_tracked.xls" size="72704" user="Main.PeterWizinowich" version="10"
 
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 3" date="1156533867" name="NGAO_WBS_RGD_v_01_level_3.pdf" path="NGAO_WBS_RGD_v_01_level_3.pdf" size="36072" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1158967784" name="Sci_requirement_Performance_budget_Iterations_v02.pdf" path="Sci_requirement_Performance_budget_Iterations_v02.pdf" size="45806" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1158183658" name="NGAO_SD_schedule_v7.pdf" path="NGAO_SD_schedule_v7.pdf" size="66532" user="Main.RichardDekany" version="1"
Line: 60 to 60
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1170897870" name="Summary_of_NGAO_EC_020707.doc" path="Summary_of_NGAO_EC_020707.doc" size="32256" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/25/06)" date="1159240938" name="NGAO_SD_schedule_v10.mpp" path="NGAO_SD_schedule_v10.mpp" size="579584" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/22/06)" date="1158979993" name="NGAO_SD_schedule_v9.mpp" path="NGAO_SD_schedule_v9.mpp" size="630784" user="Main.PeterWizinowich" version="1"
Changed:
<
<
META FILEATTACHMENT attr="" autoattached="1" comment="Tracked version of schedule. 11/22/06" date="1164220753" name="NGAO_SD_schedule_v20_tracked.mpp" path="NGAO_SD_schedule_v20_tracked.mpp" size="661504" user="Main.PeterWizinowich" version="2"
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Tracked version of schedule. 3/30/07" date="1175282761" name="NGAO_SD_schedule_v20_tracked.mpp" path="NGAO_SD_schedule_v20_tracked.mpp" size="748544" user="Main.PeterWizinowich" version="3"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Summary of NGAO EC 12/5/06 telecon" date="1165891340" name="Summary_of_NGAO_EC_120506.doc" path="Summary_of_NGAO_EC_120506.doc" size="33280" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/12/06)" date="1158089961" name="NGAO_SD_schedule_v7.mpp" path="NGAO_SD_schedule_v7.mpp" size="449536" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="9/28/06 8:45 pm PDT version" date="1159501554" name="NGAO_SD_System_Eng_Mgmt_Plan_v16.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v16.doc" size="1295872" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Summary of NGAO EC 01/11/07 telecon" date="1168559219" name="Summary_of_NGAO_EC_011107.doc" path="Summary_of_NGAO_EC_011107.doc" size="32768" user="Main.PeterWizinowich" version="1"
Changed:
<
<
META FILEATTACHMENT attr="" autoattached="1" comment="pdf version of tracked schedule (11/22/06)" date="1164221074" name="NGAO_SD_schedule_v20_tracked.pdf" path="NGAO_SD_schedule_v20_tracked.pdf" size="134625" user="Main.PeterWizinowich" version="1"
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="pdf version of tracked schedule (3/30/07)" date="1175282812" name="NGAO_SD_schedule_v20_tracked.pdf" path="NGAO_SD_schedule_v20_tracked.pdf" size="104849" user="Main.PeterWizinowich" version="2"
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1157577088" name="NGAO_SD_System_Eng_Mgmt_Plan_v04.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v04.doc" size="480256" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1158965808" name="Sci_requirement_Performance_budget_Iterations.pdf" path="Sci_requirement_Performance_budget_Iterations.pdf" size="45806" user="Main.RichardDekany" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept 7, 2006" date="1157660734" name="NGAO_SD_System_Eng_Mgmt_Plan_v05.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v05.doc" size="559616" user="Main.DonaldGavel" version="1"

Revision 562007-03-23 - DonaldGavel

Line: 1 to 1
 
META TOPICPARENT
This collection is for System Design Phase Planning and Tracking Documents

EC Telecon Dial-in Number 877-280-4645 with passcode 540030 (via WMKO)

Systems Engineering Management Plan (SEMP):

Changed:
<
<
>
>
 
Line: 75 to 75
 
META FILEATTACHMENT attr="" autoattached="1" comment="Final version used in SEMP + change to Nov. meeting date." date="1162939856" name="NGAO_SD_Team_Meetings_v_10.xls" path="NGAO_SD_Team_Meetings_v_10.xls" size="41472" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Updated 9/22/06" date="1158965020" name="NGAO_SD_Team_Meetings_v_08.xls" path="NGAO_SD_Team_Meetings_v_08.xls" size="62976" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 6" date="1156533887" name="NGAO_WBS_RGD_v_01_level_6.pdf" path="NGAO_WBS_RGD_v_01_level_6.pdf" size="46247" user="Main.RichardDekany" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1174685917" name="NGAO_SD_System_Eng_Mgmt_Plan_v20.pdf" path="NGAO_SD_System_Eng_Mgmt_Plan_v20.pdf" size="1209970" user="Main.DonaldGavel" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Planning sheet to be used for defining the work scope for a WBS element. To be used prior to performing significant work on a WBS element." date="1163033650" name="NGAOWorkScopePlanningSheet.doc" path="NGAOWorkScopePlanningSheet.doc" size="126976" user="Main.PeterWizinowich" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="02/28/07 EC meeting summary" date="1172709442" name="Summary_of_NGAO_EC_022807.doc" path="Summary_of_NGAO_EC_022807.doc" size="32768" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Update 1/25/07" date="1169767836" name="NGAO_update_012507.doc" path="NGAO_update_012507.doc" size="29184" user="Main.PeterWizinowich" version="1"

Revision 552007-03-21 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
This collection is for System Design Phase Planning and Tracking Documents
Line: 15 to 15
  Tracked Version of SEMP:
Changed:
<
<
  • NGAO_SD_schedule_v20_tracked.xls: Excel version of the tracked project plan. See the color code at the bottom of the spreadsheet. Also note that the "Plan" column indicates which WBS elements requires Work Scope Planning Sheets - Peter Wizinowich, Jan. 19, 2007.
>
>
  • NGAO_SD_schedule_v20_tracked.xls: Excel version of the tracked project plan. See the color code at the bottom of the spreadsheet. Also note that the "Plan" column indicates which WBS elements requires Work Scope Planning Sheets - Peter Wizinowich, Mar. 21, 2007.
  Project Reports:
Line: 46 to 46
 
META FILEATTACHMENT attr="" autoattached="1" comment="version insertable into SD SEMP" date="1159249694" name="NGAO_SD_Team_Meetings_v_09.tiff" path="NGAO_SD_Team_Meetings_v_09.tiff" size="11238144" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept 11, 2006" date="1158006879" name="NGAO_SD_System_Eng_Mgmt_Plan_v08.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v08.doc" size="1090560" user="Main.PeterWizinowich" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan" date="1157577832" name="NGAO_SD_schedule_v6.mpp" path="NGAO_SD_schedule_v6.mpp" size="262656" user="Main.DonaldGavel" version="1"
Changed:
<
<
META FILEATTACHMENT attachment="NGAO_SD_schedule_v20_tracked.xls" attr="" comment="Excel version of the tracked project plan (updated 3/6/07)" date="1173229985" name="NGAO_SD_schedule_v20_tracked.xls" path="V:\ngao system design\NGAO SD schedule v20 tracked.xls" size="72704" stream="V:\ngao system design\NGAO SD schedule v20 tracked.xls" user="Main.PeterWizinowich" version="7"
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Excel version of the tracked project plan (updated 3/21/07)" date="1174508705" name="NGAO_SD_schedule_v20_tracked.xls" path="NGAO_SD_schedule_v20_tracked.xls" size="72704" user="Main.PeterWizinowich" version="8"
 
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 3" date="1156533867" name="NGAO_WBS_RGD_v_01_level_3.pdf" path="NGAO_WBS_RGD_v_01_level_3.pdf" size="36072" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1158967784" name="Sci_requirement_Performance_budget_Iterations_v02.pdf" path="Sci_requirement_Performance_budget_Iterations_v02.pdf" size="45806" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1158183658" name="NGAO_SD_schedule_v7.pdf" path="NGAO_SD_schedule_v7.pdf" size="66532" user="Main.RichardDekany" version="1"

Revision 542007-03-07 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
This collection is for System Design Phase Planning and Tracking Documents
Line: 46 to 46
 
META FILEATTACHMENT attr="" autoattached="1" comment="version insertable into SD SEMP" date="1159249694" name="NGAO_SD_Team_Meetings_v_09.tiff" path="NGAO_SD_Team_Meetings_v_09.tiff" size="11238144" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept 11, 2006" date="1158006879" name="NGAO_SD_System_Eng_Mgmt_Plan_v08.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v08.doc" size="1090560" user="Main.PeterWizinowich" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan" date="1157577832" name="NGAO_SD_schedule_v6.mpp" path="NGAO_SD_schedule_v6.mpp" size="262656" user="Main.DonaldGavel" version="1"
Changed:
<
<
META FILEATTACHMENT attr="" autoattached="1" comment="Excel version of the tracked project plan (updated 1/19/07)" date="1169239265" name="NGAO_SD_schedule_v20_tracked.xls" path="NGAO_SD_schedule_v20_tracked.xls" size="72704" user="Main.PeterWizinowich" version="4"
>
>
META FILEATTACHMENT attachment="NGAO_SD_schedule_v20_tracked.xls" attr="" comment="Excel version of the tracked project plan (updated 3/6/07)" date="1173229985" name="NGAO_SD_schedule_v20_tracked.xls" path="V:\ngao system design\NGAO SD schedule v20 tracked.xls" size="72704" stream="V:\ngao system design\NGAO SD schedule v20 tracked.xls" user="Main.PeterWizinowich" version="7"
 
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 3" date="1156533867" name="NGAO_WBS_RGD_v_01_level_3.pdf" path="NGAO_WBS_RGD_v_01_level_3.pdf" size="36072" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1158967784" name="Sci_requirement_Performance_budget_Iterations_v02.pdf" path="Sci_requirement_Performance_budget_Iterations_v02.pdf" size="45806" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1158183658" name="NGAO_SD_schedule_v7.pdf" path="NGAO_SD_schedule_v7.pdf" size="66532" user="Main.RichardDekany" version="1"

Revision 532007-03-01 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
This collection is for System Design Phase Planning and Tracking Documents
Line: 30 to 30
 
Added:
>
>
 
Line: 75 to 76
 
META FILEATTACHMENT attr="" autoattached="1" comment="Updated 9/22/06" date="1158965020" name="NGAO_SD_Team_Meetings_v_08.xls" path="NGAO_SD_Team_Meetings_v_08.xls" size="62976" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 6" date="1156533887" name="NGAO_WBS_RGD_v_01_level_6.pdf" path="NGAO_WBS_RGD_v_01_level_6.pdf" size="46247" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Planning sheet to be used for defining the work scope for a WBS element. To be used prior to performing significant work on a WBS element." date="1163033650" name="NGAOWorkScopePlanningSheet.doc" path="NGAOWorkScopePlanningSheet.doc" size="126976" user="Main.PeterWizinowich" version="2"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="02/28/07 EC meeting summary" date="1172709442" name="Summary_of_NGAO_EC_022807.doc" path="Summary_of_NGAO_EC_022807.doc" size="32768" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Update 1/25/07" date="1169767836" name="NGAO_update_012507.doc" path="NGAO_update_012507.doc" size="29184" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept. 22, 2006" date="1158979846" name="NGAO_SD_System_Eng_Mgmt_Plan_v11.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v11.doc" size="1267712" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept. 26, 2006" date="1159309264" name="NGAO_SD_System_Eng_Mgmt_Plan_v13.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v13.doc" size="1347584" user="Main.PeterWizinowich" version="1"

Revision 522007-02-22 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
This collection is for System Design Phase Planning and Tracking Documents
Line: 29 to 29
 
Added:
>
>
 

META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Project Report #1 (1/19/07)" date="1169261614" name="Project_Report_1.pdf" path="Project_Report_1.pdf" size="131067" user="Main.PeterWizinowich" version="1"
Line: 39 to 41
 
META FILEATTACHMENT attr="" autoattached="1" comment="Rich's pass - now handing back to Peter" date="1159343456" name="NGAO_SD_schedule_v13.mpp" path="NGAO_SD_schedule_v13.mpp" size="610816" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Includes wk-hrs mapped onto SD SEMP .mpp v10" date="1159249216" name="NGAO_SD_Team_Meetings_v_09.xls" path="NGAO_SD_Team_Meetings_v_09.xls" size="61440" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="9/28/06 2:45 pm PDT version" date="1159479841" name="NGAO_SD_schedule_v16.mpp" path="NGAO_SD_schedule_v16.mpp" size="640000" user="Main.PeterWizinowich" version="2"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1172112060" name="Summary_of_NGAO_EC_022107.doc" path="Summary_of_NGAO_EC_022107.doc" size="32256" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="version insertable into SD SEMP" date="1159249694" name="NGAO_SD_Team_Meetings_v_09.tiff" path="NGAO_SD_Team_Meetings_v_09.tiff" size="11238144" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept 11, 2006" date="1158006879" name="NGAO_SD_System_Eng_Mgmt_Plan_v08.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v08.doc" size="1090560" user="Main.PeterWizinowich" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan" date="1157577832" name="NGAO_SD_schedule_v6.mpp" path="NGAO_SD_schedule_v6.mpp" size="262656" user="Main.DonaldGavel" version="1"

Revision 512007-02-08 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
This collection is for System Design Phase Planning and Tracking Documents
Line: 28 to 28
 
Added:
>
>
 
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Project Report #1 (1/19/07)" date="1169261614" name="Project_Report_1.pdf" path="Project_Report_1.pdf" size="131067" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Project Report #1 (1/19/07)" date="1169261351" name="Project_Report_1.doc" path="Project_Report_1.doc" size="155136" user="Main.PeterWizinowich" version="1"
Line: 51 to 53
 
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 2" date="1156533845" name="NGAO_WBS_RGD_v_01_level_2.pdf" path="NGAO_WBS_RGD_v_01_level_2.pdf" size="22860" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="pdf version of tracked schedule (1/19/07)" date="1169239397" name="NGAO_SD_schedule_v20.pdf" path="NGAO_SD_schedule_v20.pdf" size="77105" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="9/29/06 Version sent to Directors" date="1159587774" name="NGAO_SD_System_Eng_Mgmt_Plan_v20.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v20.doc" size="1435136" user="Main.PeterWizinowich" version="2"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1170897870" name="Summary_of_NGAO_EC_020707.doc" path="Summary_of_NGAO_EC_020707.doc" size="32256" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/25/06)" date="1159240938" name="NGAO_SD_schedule_v10.mpp" path="NGAO_SD_schedule_v10.mpp" size="579584" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/22/06)" date="1158979993" name="NGAO_SD_schedule_v9.mpp" path="NGAO_SD_schedule_v9.mpp" size="630784" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Tracked version of schedule. 11/22/06" date="1164220753" name="NGAO_SD_schedule_v20_tracked.mpp" path="NGAO_SD_schedule_v20_tracked.mpp" size="661504" user="Main.PeterWizinowich" version="2"

Revision 502007-01-31 - RichardDekany

Line: 1 to 1
 
META TOPICPARENT
This collection is for System Design Phase Planning and Tracking Documents
Line: 10 to 10
 
Added:
>
>
Work Assignments:
 Tracked Version of SEMP:
Line: 32 to 32
 
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Project Report #1 (1/19/07)" date="1169261614" name="Project_Report_1.pdf" path="Project_Report_1.pdf" size="131067" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Project Report #1 (1/19/07)" date="1169261351" name="Project_Report_1.doc" path="Project_Report_1.doc" size="155136" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="(PDF form of above)" date="1157577901" name="NGAO_SD_schedule_v6.pdf" path="NGAO_SD_schedule_v6.pdf" size="58177" user="Main.DonaldGavel" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Month-by-month look at assignments" date="1170210406" name="NGAO_SD_Resource_Usage_Report.pdf" path="NGAO_SD_Resource_Usage_Report.pdf" size="69809" user="Main.RichardDekany" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Tracked version of schedule. 1/19/07" date="1169239343" name="NGAO_SD_schedule_v20.mpp" path="NGAO_SD_schedule_v20.mpp" size="638464" user="Main.PeterWizinowich" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="Rich's pass - now handing back to Peter" date="1159343456" name="NGAO_SD_schedule_v13.mpp" path="NGAO_SD_schedule_v13.mpp" size="610816" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Includes wk-hrs mapped onto SD SEMP .mpp v10" date="1159249216" name="NGAO_SD_Team_Meetings_v_09.xls" path="NGAO_SD_Team_Meetings_v_09.xls" size="61440" user="Main.RichardDekany" version="1"

Revision 492007-01-25 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
This collection is for System Design Phase Planning and Tracking Documents
Line: 24 to 24
 
Added:
>
>
 
Line: 66 to 68
 
META FILEATTACHMENT attr="" autoattached="1" comment="Updated 9/22/06" date="1158965020" name="NGAO_SD_Team_Meetings_v_08.xls" path="NGAO_SD_Team_Meetings_v_08.xls" size="62976" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 6" date="1156533887" name="NGAO_WBS_RGD_v_01_level_6.pdf" path="NGAO_WBS_RGD_v_01_level_6.pdf" size="46247" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Planning sheet to be used for defining the work scope for a WBS element. To be used prior to performing significant work on a WBS element." date="1163033650" name="NGAOWorkScopePlanningSheet.doc" path="NGAOWorkScopePlanningSheet.doc" size="126976" user="Main.PeterWizinowich" version="2"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Update 1/25/07" date="1169767836" name="NGAO_update_012507.doc" path="NGAO_update_012507.doc" size="29184" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept. 22, 2006" date="1158979846" name="NGAO_SD_System_Eng_Mgmt_Plan_v11.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v11.doc" size="1267712" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept. 26, 2006" date="1159309264" name="NGAO_SD_System_Eng_Mgmt_Plan_v13.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v13.doc" size="1347584" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1159466578" name="NGAO_SD_schedule_v15.mpp" path="NGAO_SD_schedule_v15.mpp" size="598528" user="Main.RichardDekany" version="1"

Revision 482007-01-24 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
This collection is for System Design Phase Planning and Tracking Documents
Line: 16 to 16
  Project Reports:
Added:
>
>
  NGAO Executive Committee Telecon Summaries:
Line: 70 to 71
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1159466578" name="NGAO_SD_schedule_v15.mpp" path="NGAO_SD_schedule_v15.mpp" size="598528" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept. 25, 2006" date="1159240995" name="NGAO_SD_System_Eng_Mgmt_Plan_v12.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v12.doc" size="1308672" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="9/28/07 8:40 pm PDT version" date="1159501283" name="NGAO_SD_schedule_v17.mpp" path="NGAO_SD_schedule_v17.mpp" size="660992" user="Main.PeterWizinowich" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="SSC Report (1/24/07)" date="1169655025" name="SSC_NGAO_Report_0107.ppt" path="SSC_NGAO_Report_0107.ppt" size="1472000" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Final meeting schedule used in SEMP + change to Nov. meeting date." date="1162939993" name="NGAO_SD_Team_Meetings_v_10.pdf" path="NGAO_SD_Team_Meetings_v_10.pdf" size="16565" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept. 12, 2006" date="1158090082" name="NGAO_SD_System_Eng_Mgmt_Plan_v09.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v09.doc" size="1249792" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1168282149" name="Summary_of_NGAO_EC_121506.doc" path="Summary_of_NGAO_EC_121506.doc" size="30720" user="Main.DonaldGavel" version="1"

Revision 472007-01-20 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
This collection is for System Design Phase Planning and Tracking Documents
Line: 15 to 15
 
  • NGAO_SD_schedule_v20_tracked.xls: Excel version of the tracked project plan. See the color code at the bottom of the spreadsheet. Also note that the "Plan" column indicates which WBS elements requires Work Scope Planning Sheets - Peter Wizinowich, Jan. 19, 2007.

Project Reports:

Changed:
<
<
>
>
  NGAO Executive Committee Telecon Summaries:
Line: 26 to 26
 
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Project Report #1 (1/19/07)" date="1169261614" name="Project_Report_1.pdf" path="Project_Report_1.pdf" size="131067" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Project Report #1 (1/19/07)" date="1169261351" name="Project_Report_1.doc" path="Project_Report_1.doc" size="155136" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="(PDF form of above)" date="1157577901" name="NGAO_SD_schedule_v6.pdf" path="NGAO_SD_schedule_v6.pdf" size="58177" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Tracked version of schedule. 1/19/07" date="1169239343" name="NGAO_SD_schedule_v20.mpp" path="NGAO_SD_schedule_v20.mpp" size="638464" user="Main.PeterWizinowich" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="Rich's pass - now handing back to Peter" date="1159343456" name="NGAO_SD_schedule_v13.mpp" path="NGAO_SD_schedule_v13.mpp" size="610816" user="Main.RichardDekany" version="1"

Revision 462007-01-19 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
This collection is for System Design Phase Planning and Tracking Documents
Line: 11 to 11
 

Tracked Version of SEMP:

Changed:
<
<
>
>

Project Reports:

  NGAO Executive Committee Telecon Summaries:
Line: 24 to 27
 

META FILEATTACHMENT attr="" autoattached="1" comment="(PDF form of above)" date="1157577901" name="NGAO_SD_schedule_v6.pdf" path="NGAO_SD_schedule_v6.pdf" size="58177" user="Main.DonaldGavel" version="1"
Changed:
<
<
META FILEATTACHMENT attr="" autoattached="1" comment="Final version of the MS Project Plan used in preparing the SEMP document sent to the Directors on 9/29/06" date="1159588156" name="NGAO_SD_schedule_v20.mpp" path="NGAO_SD_schedule_v20.mpp" size="630272" user="Main.PeterWizinowich" version="1"
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Tracked version of schedule. 1/19/07" date="1169239343" name="NGAO_SD_schedule_v20.mpp" path="NGAO_SD_schedule_v20.mpp" size="638464" user="Main.PeterWizinowich" version="2"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Rich's pass - now handing back to Peter" date="1159343456" name="NGAO_SD_schedule_v13.mpp" path="NGAO_SD_schedule_v13.mpp" size="610816" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Includes wk-hrs mapped onto SD SEMP .mpp v10" date="1159249216" name="NGAO_SD_Team_Meetings_v_09.xls" path="NGAO_SD_Team_Meetings_v_09.xls" size="61440" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="9/28/06 2:45 pm PDT version" date="1159479841" name="NGAO_SD_schedule_v16.mpp" path="NGAO_SD_schedule_v16.mpp" size="640000" user="Main.PeterWizinowich" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="version insertable into SD SEMP" date="1159249694" name="NGAO_SD_Team_Meetings_v_09.tiff" path="NGAO_SD_Team_Meetings_v_09.tiff" size="11238144" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept 11, 2006" date="1158006879" name="NGAO_SD_System_Eng_Mgmt_Plan_v08.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v08.doc" size="1090560" user="Main.PeterWizinowich" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan" date="1157577832" name="NGAO_SD_schedule_v6.mpp" path="NGAO_SD_schedule_v6.mpp" size="262656" user="Main.DonaldGavel" version="1"
Changed:
<
<
META FILEATTACHMENT attr="" autoattached="1" comment="Excel version of the tracked project plan (updated 12/12/06)" date="1165964438" name="NGAO_SD_schedule_v20_tracked.xls" path="NGAO_SD_schedule_v20_tracked.xls" size="72192" user="Main.PeterWizinowich" version="3"
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Excel version of the tracked project plan (updated 1/19/07)" date="1169239265" name="NGAO_SD_schedule_v20_tracked.xls" path="NGAO_SD_schedule_v20_tracked.xls" size="72704" user="Main.PeterWizinowich" version="4"
 
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 3" date="1156533867" name="NGAO_WBS_RGD_v_01_level_3.pdf" path="NGAO_WBS_RGD_v_01_level_3.pdf" size="36072" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1158967784" name="Sci_requirement_Performance_budget_Iterations_v02.pdf" path="Sci_requirement_Performance_budget_Iterations_v02.pdf" size="45806" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1158183658" name="NGAO_SD_schedule_v7.pdf" path="NGAO_SD_schedule_v7.pdf" size="66532" user="Main.RichardDekany" version="1"
Line: 40 to 43
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1159476728" name="NGAO_SD_System_Eng_Mgmt_Plan_v14.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v14.doc" size="1353216" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Summary of 11/29/06 telecon" date="1164912197" name="Summary_of_NGAO_EC_112906.doc" path="Summary_of_NGAO_EC_112906.doc" size="27648" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 2" date="1156533845" name="NGAO_WBS_RGD_v_01_level_2.pdf" path="NGAO_WBS_RGD_v_01_level_2.pdf" size="22860" user="Main.RichardDekany" version="1"
Changed:
<
<
META FILEATTACHMENT attr="" autoattached="1" comment="System Design Phase Schedule. Final version included in the SEMP." date="1162938723" name="NGAO_SD_schedule_v20.pdf" path="NGAO_SD_schedule_v20.pdf" size="77105" user="Main.PeterWizinowich" version="1"
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="pdf version of tracked schedule (1/19/07)" date="1169239397" name="NGAO_SD_schedule_v20.pdf" path="NGAO_SD_schedule_v20.pdf" size="77105" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="9/29/06 Version sent to Directors" date="1159587774" name="NGAO_SD_System_Eng_Mgmt_Plan_v20.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v20.doc" size="1435136" user="Main.PeterWizinowich" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/25/06)" date="1159240938" name="NGAO_SD_schedule_v10.mpp" path="NGAO_SD_schedule_v10.mpp" size="579584" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/22/06)" date="1158979993" name="NGAO_SD_schedule_v9.mpp" path="NGAO_SD_schedule_v9.mpp" size="630784" user="Main.PeterWizinowich" version="1"

Revision 452007-01-11 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
This collection is for System Design Phase Planning and Tracking Documents
Line: 19 to 19
 
Added:
>
>
 

META FILEATTACHMENT attr="" autoattached="1" comment="(PDF form of above)" date="1157577901" name="NGAO_SD_schedule_v6.pdf" path="NGAO_SD_schedule_v6.pdf" size="58177" user="Main.DonaldGavel" version="1"
Line: 46 to 48
 
META FILEATTACHMENT attr="" autoattached="1" comment="Summary of NGAO EC 12/5/06 telecon" date="1165891340" name="Summary_of_NGAO_EC_120506.doc" path="Summary_of_NGAO_EC_120506.doc" size="33280" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/12/06)" date="1158089961" name="NGAO_SD_schedule_v7.mpp" path="NGAO_SD_schedule_v7.mpp" size="449536" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="9/28/06 8:45 pm PDT version" date="1159501554" name="NGAO_SD_System_Eng_Mgmt_Plan_v16.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v16.doc" size="1295872" user="Main.PeterWizinowich" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Summary of NGAO EC 01/11/07 telecon" date="1168559219" name="Summary_of_NGAO_EC_011107.doc" path="Summary_of_NGAO_EC_011107.doc" size="32768" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="pdf version of tracked schedule (11/22/06)" date="1164221074" name="NGAO_SD_schedule_v20_tracked.pdf" path="NGAO_SD_schedule_v20_tracked.pdf" size="134625" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1157577088" name="NGAO_SD_System_Eng_Mgmt_Plan_v04.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v04.doc" size="480256" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1158965808" name="Sci_requirement_Performance_budget_Iterations.pdf" path="Sci_requirement_Performance_budget_Iterations.pdf" size="45806" user="Main.RichardDekany" version="2"

Revision 442007-01-08 - DonaldGavel

Line: 1 to 1
 
META TOPICPARENT
This collection is for System Design Phase Planning and Tracking Documents
Line: 18 to 18
 
Changed:
<
<

>
>
 

META FILEATTACHMENT attr="" autoattached="1" comment="(PDF form of above)" date="1157577901" name="NGAO_SD_schedule_v6.pdf" path="NGAO_SD_schedule_v6.pdf" size="58177" user="Main.DonaldGavel" version="1"
Line: 65 to 64
 
META FILEATTACHMENT attr="" autoattached="1" comment="9/28/07 8:40 pm PDT version" date="1159501283" name="NGAO_SD_schedule_v17.mpp" path="NGAO_SD_schedule_v17.mpp" size="660992" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Final meeting schedule used in SEMP + change to Nov. meeting date." date="1162939993" name="NGAO_SD_Team_Meetings_v_10.pdf" path="NGAO_SD_Team_Meetings_v_10.pdf" size="16565" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept. 12, 2006" date="1158090082" name="NGAO_SD_System_Eng_Mgmt_Plan_v09.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v09.doc" size="1249792" user="Main.PeterWizinowich" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1168282149" name="Summary_of_NGAO_EC_121506.doc" path="Summary_of_NGAO_EC_121506.doc" size="30720" user="Main.DonaldGavel" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/26/06)" date="1159309314" name="NGAO_SD_schedule_v11.mpp" path="NGAO_SD_schedule_v11.mpp" size="766976" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="revised - includes enties for real-time controller" date="1156545727" name="Keck_NGAO_WBS_Dictionary_(partial,_draft_8-25-06_rev1,_DG).pdf" path="Keck_NGAO_WBS_Dictionary_(partial,_draft_8-25-06_rev1,_DG).pdf" size="93422" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Summary of 11/22/06 telecon" date="1164912167" name="Summary_of_NGAO_EC_112206.doc" path="Summary_of_NGAO_EC_112206.doc" size="31232" user="Main.PeterWizinowich" version="1"

Revision 432006-12-12 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
This collection is for System Design Phase Planning and Tracking Documents
Line: 12 to 12
  Tracked Version of SEMP:
Changed:
<
<
  • NGAO_SD_schedule_v20_tracked.xls: Excel version of the tracked project plan. See the color code at the bottom of the spreadsheet. Also note that the "Plan" column indicates which WBS elements requires Work Scope Planning Sheets - Peter Wizinowich, Dec. 11, 2006.
>
>
  • NGAO_SD_schedule_v20_tracked.xls: Excel version of the tracked project plan. See the color code at the bottom of the spreadsheet. Also note that the "Plan" column indicates which WBS elements requires Work Scope Planning Sheets - Peter Wizinowich, Dec. 12, 2006.
  NGAO Executive Committee Telecon Summaries:
Line: 30 to 30
 
META FILEATTACHMENT attr="" autoattached="1" comment="version insertable into SD SEMP" date="1159249694" name="NGAO_SD_Team_Meetings_v_09.tiff" path="NGAO_SD_Team_Meetings_v_09.tiff" size="11238144" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept 11, 2006" date="1158006879" name="NGAO_SD_System_Eng_Mgmt_Plan_v08.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v08.doc" size="1090560" user="Main.PeterWizinowich" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan" date="1157577832" name="NGAO_SD_schedule_v6.mpp" path="NGAO_SD_schedule_v6.mpp" size="262656" user="Main.DonaldGavel" version="1"
Changed:
<
<
META FILEATTACHMENT attr="" autoattached="1" comment="Excel version of the tracked project plan (updated 12/11/06)" date="1165886612" name="NGAO_SD_schedule_v20_tracked.xls" path="NGAO_SD_schedule_v20_tracked.xls" size="72192" user="Main.PeterWizinowich" version="2"
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Excel version of the tracked project plan (updated 12/12/06)" date="1165964438" name="NGAO_SD_schedule_v20_tracked.xls" path="NGAO_SD_schedule_v20_tracked.xls" size="72192" user="Main.PeterWizinowich" version="3"
 
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 3" date="1156533867" name="NGAO_WBS_RGD_v_01_level_3.pdf" path="NGAO_WBS_RGD_v_01_level_3.pdf" size="36072" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1158967784" name="Sci_requirement_Performance_budget_Iterations_v02.pdf" path="Sci_requirement_Performance_budget_Iterations_v02.pdf" size="45806" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1158183658" name="NGAO_SD_schedule_v7.pdf" path="NGAO_SD_schedule_v7.pdf" size="66532" user="Main.RichardDekany" version="1"

Revision 422006-12-12 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
This collection is for System Design Phase Planning and Tracking Documents
Line: 17 to 17
 NGAO Executive Committee Telecon Summaries:
Added:
>
>
 

Line: 43 to 44
 
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/25/06)" date="1159240938" name="NGAO_SD_schedule_v10.mpp" path="NGAO_SD_schedule_v10.mpp" size="579584" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/22/06)" date="1158979993" name="NGAO_SD_schedule_v9.mpp" path="NGAO_SD_schedule_v9.mpp" size="630784" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Tracked version of schedule. 11/22/06" date="1164220753" name="NGAO_SD_schedule_v20_tracked.mpp" path="NGAO_SD_schedule_v20_tracked.mpp" size="661504" user="Main.PeterWizinowich" version="2"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Summary of NGAO EC 12/5/06 telecon" date="1165891340" name="Summary_of_NGAO_EC_120506.doc" path="Summary_of_NGAO_EC_120506.doc" size="33280" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/12/06)" date="1158089961" name="NGAO_SD_schedule_v7.mpp" path="NGAO_SD_schedule_v7.mpp" size="449536" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="9/28/06 8:45 pm PDT version" date="1159501554" name="NGAO_SD_System_Eng_Mgmt_Plan_v16.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v16.doc" size="1295872" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="pdf version of tracked schedule (11/22/06)" date="1164221074" name="NGAO_SD_schedule_v20_tracked.pdf" path="NGAO_SD_schedule_v20_tracked.pdf" size="134625" user="Main.PeterWizinowich" version="1"

Revision 412006-12-12 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
This collection is for System Design Phase Planning and Tracking Documents
Line: 12 to 12
  Tracked Version of SEMP:
Changed:
<
<
  • NGAO_SD_schedule_v20_tracked.xls: Excel version of the tracked project plan. See the color code at the bottom of the spreadsheet. Also note that the "Plan" column indicates which WBS elements requires Work Scope Planning Sheets - Peter Wizinowich, Nov. 30, 2006.
>
>
  • NGAO_SD_schedule_v20_tracked.xls: Excel version of the tracked project plan. See the color code at the bottom of the spreadsheet. Also note that the "Plan" column indicates which WBS elements requires Work Scope Planning Sheets - Peter Wizinowich, Dec. 11, 2006.
  NGAO Executive Committee Telecon Summaries:
Line: 29 to 29
 
META FILEATTACHMENT attr="" autoattached="1" comment="version insertable into SD SEMP" date="1159249694" name="NGAO_SD_Team_Meetings_v_09.tiff" path="NGAO_SD_Team_Meetings_v_09.tiff" size="11238144" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept 11, 2006" date="1158006879" name="NGAO_SD_System_Eng_Mgmt_Plan_v08.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v08.doc" size="1090560" user="Main.PeterWizinowich" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan" date="1157577832" name="NGAO_SD_schedule_v6.mpp" path="NGAO_SD_schedule_v6.mpp" size="262656" user="Main.DonaldGavel" version="1"
Changed:
<
<
META FILEATTACHMENT attr="" autoattached="1" comment="Excel version of the tracked project plan." date="1164910372" name="NGAO_SD_schedule_v20_tracked.xls" path="NGAO_SD_schedule_v20_tracked.xls" size="73216" user="Main.PeterWizinowich" version="1"
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Excel version of the tracked project plan (updated 12/11/06)" date="1165886612" name="NGAO_SD_schedule_v20_tracked.xls" path="NGAO_SD_schedule_v20_tracked.xls" size="72192" user="Main.PeterWizinowich" version="2"
 
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 3" date="1156533867" name="NGAO_WBS_RGD_v_01_level_3.pdf" path="NGAO_WBS_RGD_v_01_level_3.pdf" size="36072" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1158967784" name="Sci_requirement_Performance_budget_Iterations_v02.pdf" path="Sci_requirement_Performance_budget_Iterations_v02.pdf" size="45806" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1158183658" name="NGAO_SD_schedule_v7.pdf" path="NGAO_SD_schedule_v7.pdf" size="66532" user="Main.RichardDekany" version="1"

Revision 402006-11-30 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
Changed:
<
<
This collection is for SD Phase Planning Documents
>
>
This collection is for System Design Phase Planning and Tracking Documents
 
Changed:
<
<
EC Telecon Dial-in Number 877-280-4645 with passcode 540030 (via CARA)
>
>
EC Telecon Dial-in Number 877-280-4645 with passcode 540030 (via WMKO)
 
Added:
>
>
Systems Engineering Management Plan (SEMP):
 
Deleted:
<
<
 
Added:
>
>
Tracked Version of SEMP:

NGAO Executive Committee Telecon Summaries:

 

META FILEATTACHMENT attr="" autoattached="1" comment="(PDF form of above)" date="1157577901" name="NGAO_SD_schedule_v6.pdf" path="NGAO_SD_schedule_v6.pdf" size="58177" user="Main.DonaldGavel" version="1"
Line: 22 to 29
 
META FILEATTACHMENT attr="" autoattached="1" comment="version insertable into SD SEMP" date="1159249694" name="NGAO_SD_Team_Meetings_v_09.tiff" path="NGAO_SD_Team_Meetings_v_09.tiff" size="11238144" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept 11, 2006" date="1158006879" name="NGAO_SD_System_Eng_Mgmt_Plan_v08.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v08.doc" size="1090560" user="Main.PeterWizinowich" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan" date="1157577832" name="NGAO_SD_schedule_v6.mpp" path="NGAO_SD_schedule_v6.mpp" size="262656" user="Main.DonaldGavel" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Excel version of the tracked project plan." date="1164910372" name="NGAO_SD_schedule_v20_tracked.xls" path="NGAO_SD_schedule_v20_tracked.xls" size="73216" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 3" date="1156533867" name="NGAO_WBS_RGD_v_01_level_3.pdf" path="NGAO_WBS_RGD_v_01_level_3.pdf" size="36072" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1158967784" name="Sci_requirement_Performance_budget_Iterations_v02.pdf" path="Sci_requirement_Performance_budget_Iterations_v02.pdf" size="45806" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1158183658" name="NGAO_SD_schedule_v7.pdf" path="NGAO_SD_schedule_v7.pdf" size="66532" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Includes wk-hrs mapped onto SD SEMP .mpp v10" date="1159249289" name="NGAO_SD_Team_Meetings_v_09.pdf" path="NGAO_SD_Team_Meetings_v_09.pdf" size="15959" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1158791801" name="NGAO_SD_Team_Meetings_v_07.xls" path="NGAO_SD_Team_Meetings_v_07.xls" size="62976" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1159476728" name="NGAO_SD_System_Eng_Mgmt_Plan_v14.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v14.doc" size="1353216" user="Main.RichardDekany" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Summary of 11/29/06 telecon" date="1164912197" name="Summary_of_NGAO_EC_112906.doc" path="Summary_of_NGAO_EC_112906.doc" size="27648" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 2" date="1156533845" name="NGAO_WBS_RGD_v_01_level_2.pdf" path="NGAO_WBS_RGD_v_01_level_2.pdf" size="22860" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="System Design Phase Schedule. Final version included in the SEMP." date="1162938723" name="NGAO_SD_schedule_v20.pdf" path="NGAO_SD_schedule_v20.pdf" size="77105" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="9/29/06 Version sent to Directors" date="1159587774" name="NGAO_SD_System_Eng_Mgmt_Plan_v20.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v20.doc" size="1435136" user="Main.PeterWizinowich" version="2"
Line: 56 to 65
 
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept. 12, 2006" date="1158090082" name="NGAO_SD_System_Eng_Mgmt_Plan_v09.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v09.doc" size="1249792" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/26/06)" date="1159309314" name="NGAO_SD_schedule_v11.mpp" path="NGAO_SD_schedule_v11.mpp" size="766976" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="revised - includes enties for real-time controller" date="1156545727" name="Keck_NGAO_WBS_Dictionary_(partial,_draft_8-25-06_rev1,_DG).pdf" path="Keck_NGAO_WBS_Dictionary_(partial,_draft_8-25-06_rev1,_DG).pdf" size="93422" user="Main.DonaldGavel" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Summary of 11/22/06 telecon" date="1164912167" name="Summary_of_NGAO_EC_112206.doc" path="Summary_of_NGAO_EC_112206.doc" size="31232" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/26/06 pm)" date="1159326225" name="NGAO_SD_schedule_v12.mpp" path="NGAO_SD_schedule_v12.mpp" size="631296" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Suggestion for Work Breakdown Structure - in org-chart format" date="1156543102" name="WBS_Architecture_DG_Aug2506.pdf" path="WBS_Architecture_DG_Aug2506.pdf" size="16915" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="TIFF format" date="1159392091" name="Sci_requirement_Performance_budget_Iterations_v1.tiff" path="Sci_requirement_Performance_budget_Iterations_v1.tiff" size="155728" user="Main.RichardDekany" version="1"

Revision 392006-11-22 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
This collection is for SD Phase Planning Documents
Line: 6 to 6
 
Changed:
<
<
>
>
 
  • NGAOWorkScopePlanningSheet: WBS element planning sheet template. To be filled out & approved prior to starting significant work on a WBS element - Chris Neyman & Peter Wizinowich, Nov. 8, 2006.

Line: 33 to 33
 
META FILEATTACHMENT attr="" autoattached="1" comment="9/29/06 Version sent to Directors" date="1159587774" name="NGAO_SD_System_Eng_Mgmt_Plan_v20.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v20.doc" size="1435136" user="Main.PeterWizinowich" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/25/06)" date="1159240938" name="NGAO_SD_schedule_v10.mpp" path="NGAO_SD_schedule_v10.mpp" size="579584" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/22/06)" date="1158979993" name="NGAO_SD_schedule_v9.mpp" path="NGAO_SD_schedule_v9.mpp" size="630784" user="Main.PeterWizinowich" version="1"
Changed:
<
<
META FILEATTACHMENT attr="" autoattached="1" comment="Tracked version of schedule. 11/8/06" date="1163022427" name="NGAO_SD_schedule_v20_tracked.mpp" path="NGAO_SD_schedule_v20_tracked.mpp" size="649216" user="Main.PeterWizinowich" version="1"
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Tracked version of schedule. 11/22/06" date="1164220753" name="NGAO_SD_schedule_v20_tracked.mpp" path="NGAO_SD_schedule_v20_tracked.mpp" size="661504" user="Main.PeterWizinowich" version="2"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/12/06)" date="1158089961" name="NGAO_SD_schedule_v7.mpp" path="NGAO_SD_schedule_v7.mpp" size="449536" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="9/28/06 8:45 pm PDT version" date="1159501554" name="NGAO_SD_System_Eng_Mgmt_Plan_v16.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v16.doc" size="1295872" user="Main.PeterWizinowich" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="pdf version of tracked schedule (11/22/06)" date="1164221074" name="NGAO_SD_schedule_v20_tracked.pdf" path="NGAO_SD_schedule_v20_tracked.pdf" size="134625" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1157577088" name="NGAO_SD_System_Eng_Mgmt_Plan_v04.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v04.doc" size="480256" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1158965808" name="Sci_requirement_Performance_budget_Iterations.pdf" path="Sci_requirement_Performance_budget_Iterations.pdf" size="45806" user="Main.RichardDekany" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept 7, 2006" date="1157660734" name="NGAO_SD_System_Eng_Mgmt_Plan_v05.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v05.doc" size="559616" user="Main.DonaldGavel" version="1"
Line: 45 to 46
 
META FILEATTACHMENT attr="" autoattached="1" comment="Final version used in SEMP + change to Nov. meeting date." date="1162939856" name="NGAO_SD_Team_Meetings_v_10.xls" path="NGAO_SD_Team_Meetings_v_10.xls" size="41472" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Updated 9/22/06" date="1158965020" name="NGAO_SD_Team_Meetings_v_08.xls" path="NGAO_SD_Team_Meetings_v_08.xls" size="62976" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 6" date="1156533887" name="NGAO_WBS_RGD_v_01_level_6.pdf" path="NGAO_WBS_RGD_v_01_level_6.pdf" size="46247" user="Main.RichardDekany" version="1"
Changed:
<
<
META FILEATTACHMENT attachment="NGAOWorkScopePlanningSheet.doc" attr="" comment="Planning sheet to be used for defining the work scope for a WBS element. To be used prior to performing significant work on a WBS element." date="1163033650" name="NGAOWorkScopePlanningSheet.doc" path="h:\ao_docs\ngao system design\NGAOWorkScopePlanningSheet.doc" size="126976" stream="h:\ao_docs\ngao system design\NGAOWorkScopePlanningSheet.doc" user="Main.PeterWizinowich" version="2"
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Planning sheet to be used for defining the work scope for a WBS element. To be used prior to performing significant work on a WBS element." date="1163033650" name="NGAOWorkScopePlanningSheet.doc" path="NGAOWorkScopePlanningSheet.doc" size="126976" user="Main.PeterWizinowich" version="2"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept. 22, 2006" date="1158979846" name="NGAO_SD_System_Eng_Mgmt_Plan_v11.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v11.doc" size="1267712" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept. 26, 2006" date="1159309264" name="NGAO_SD_System_Eng_Mgmt_Plan_v13.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v13.doc" size="1347584" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1159466578" name="NGAO_SD_schedule_v15.mpp" path="NGAO_SD_schedule_v15.mpp" size="598528" user="Main.RichardDekany" version="1"

Revision 382006-11-09 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
This collection is for SD Phase Planning Documents
Line: 7 to 7
 
Changed:
<
<
>
>
  • NGAOWorkScopePlanningSheet: WBS element planning sheet template. To be filled out & approved prior to starting significant work on a WBS element - Chris Neyman & Peter Wizinowich, Nov. 8, 2006.
 
Line: 45 to 45
 
META FILEATTACHMENT attr="" autoattached="1" comment="Final version used in SEMP + change to Nov. meeting date." date="1162939856" name="NGAO_SD_Team_Meetings_v_10.xls" path="NGAO_SD_Team_Meetings_v_10.xls" size="41472" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Updated 9/22/06" date="1158965020" name="NGAO_SD_Team_Meetings_v_08.xls" path="NGAO_SD_Team_Meetings_v_08.xls" size="62976" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 6" date="1156533887" name="NGAO_WBS_RGD_v_01_level_6.pdf" path="NGAO_WBS_RGD_v_01_level_6.pdf" size="46247" user="Main.RichardDekany" version="1"
Added:
>
>
META FILEATTACHMENT attachment="NGAOWorkScopePlanningSheet.doc" attr="" comment="Planning sheet to be used for defining the work scope for a WBS element. To be used prior to performing significant work on a WBS element." date="1163033650" name="NGAOWorkScopePlanningSheet.doc" path="h:\ao_docs\ngao system design\NGAOWorkScopePlanningSheet.doc" size="126976" stream="h:\ao_docs\ngao system design\NGAOWorkScopePlanningSheet.doc" user="Main.PeterWizinowich" version="2"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept. 22, 2006" date="1158979846" name="NGAO_SD_System_Eng_Mgmt_Plan_v11.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v11.doc" size="1267712" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept. 26, 2006" date="1159309264" name="NGAO_SD_System_Eng_Mgmt_Plan_v13.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v13.doc" size="1347584" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1159466578" name="NGAO_SD_schedule_v15.mpp" path="NGAO_SD_schedule_v15.mpp" size="598528" user="Main.RichardDekany" version="1"

Revision 372006-11-08 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
This collection is for SD Phase Planning Documents
Line: 6 to 6
 
Added:
>
>
 
Line: 31 to 33
 
META FILEATTACHMENT attr="" autoattached="1" comment="9/29/06 Version sent to Directors" date="1159587774" name="NGAO_SD_System_Eng_Mgmt_Plan_v20.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v20.doc" size="1435136" user="Main.PeterWizinowich" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/25/06)" date="1159240938" name="NGAO_SD_schedule_v10.mpp" path="NGAO_SD_schedule_v10.mpp" size="579584" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/22/06)" date="1158979993" name="NGAO_SD_schedule_v9.mpp" path="NGAO_SD_schedule_v9.mpp" size="630784" user="Main.PeterWizinowich" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Tracked version of schedule. 11/8/06" date="1163022427" name="NGAO_SD_schedule_v20_tracked.mpp" path="NGAO_SD_schedule_v20_tracked.mpp" size="649216" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/12/06)" date="1158089961" name="NGAO_SD_schedule_v7.mpp" path="NGAO_SD_schedule_v7.mpp" size="449536" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="9/28/06 8:45 pm PDT version" date="1159501554" name="NGAO_SD_System_Eng_Mgmt_Plan_v16.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v16.doc" size="1295872" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1157577088" name="NGAO_SD_System_Eng_Mgmt_Plan_v04.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v04.doc" size="480256" user="Main.DonaldGavel" version="1"

Revision 362006-11-07 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
This collection is for SD Phase Planning Documents

EC Telecon Dial-in Number 877-280-4645 with passcode 540030 (via CARA)

Changed:
<
<
>
>
 
Changed:
<
<
>
>
 
Line: 27 to 27
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1158791801" name="NGAO_SD_Team_Meetings_v_07.xls" path="NGAO_SD_Team_Meetings_v_07.xls" size="62976" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1159476728" name="NGAO_SD_System_Eng_Mgmt_Plan_v14.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v14.doc" size="1353216" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 2" date="1156533845" name="NGAO_WBS_RGD_v_01_level_2.pdf" path="NGAO_WBS_RGD_v_01_level_2.pdf" size="22860" user="Main.RichardDekany" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="System Design Phase Schedule. Final version included in the SEMP." date="1162938723" name="NGAO_SD_schedule_v20.pdf" path="NGAO_SD_schedule_v20.pdf" size="77105" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="9/29/06 Version sent to Directors" date="1159587774" name="NGAO_SD_System_Eng_Mgmt_Plan_v20.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v20.doc" size="1435136" user="Main.PeterWizinowich" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/25/06)" date="1159240938" name="NGAO_SD_schedule_v10.mpp" path="NGAO_SD_schedule_v10.mpp" size="579584" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/22/06)" date="1158979993" name="NGAO_SD_schedule_v9.mpp" path="NGAO_SD_schedule_v9.mpp" size="630784" user="Main.PeterWizinowich" version="1"
Line: 38 to 39
 
META FILEATTACHMENT attr="" autoattached="1" comment="Peter's 9/27/06 version" date="1159413795" name="NGAO_SD_schedule_v14.mpp" path="NGAO_SD_schedule_v14.mpp" size="615936" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="WBS cleaned, but not perfect; work flow updated" date="1159557592" name="NGAO_SD_System_Eng_Mgmt_Plan_v17.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v17.doc" size="1526784" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Org chart as of Sept 7, 2006" date="1157660777" name="NGAO_SD_org_chart.vsd" path="NGAO_SD_org_chart.vsd" size="113664" user="Main.DonaldGavel" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Final version used in SEMP + change to Nov. meeting date." date="1162939856" name="NGAO_SD_Team_Meetings_v_10.xls" path="NGAO_SD_Team_Meetings_v_10.xls" size="41472" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Updated 9/22/06" date="1158965020" name="NGAO_SD_Team_Meetings_v_08.xls" path="NGAO_SD_Team_Meetings_v_08.xls" size="62976" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 6" date="1156533887" name="NGAO_WBS_RGD_v_01_level_6.pdf" path="NGAO_WBS_RGD_v_01_level_6.pdf" size="46247" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept. 22, 2006" date="1158979846" name="NGAO_SD_System_Eng_Mgmt_Plan_v11.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v11.doc" size="1267712" user="Main.PeterWizinowich" version="1"
Line: 45 to 47
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1159466578" name="NGAO_SD_schedule_v15.mpp" path="NGAO_SD_schedule_v15.mpp" size="598528" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept. 25, 2006" date="1159240995" name="NGAO_SD_System_Eng_Mgmt_Plan_v12.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v12.doc" size="1308672" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="9/28/07 8:40 pm PDT version" date="1159501283" name="NGAO_SD_schedule_v17.mpp" path="NGAO_SD_schedule_v17.mpp" size="660992" user="Main.PeterWizinowich" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Final meeting schedule used in SEMP + change to Nov. meeting date." date="1162939993" name="NGAO_SD_Team_Meetings_v_10.pdf" path="NGAO_SD_Team_Meetings_v_10.pdf" size="16565" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept. 12, 2006" date="1158090082" name="NGAO_SD_System_Eng_Mgmt_Plan_v09.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v09.doc" size="1249792" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/26/06)" date="1159309314" name="NGAO_SD_schedule_v11.mpp" path="NGAO_SD_schedule_v11.mpp" size="766976" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="revised - includes enties for real-time controller" date="1156545727" name="Keck_NGAO_WBS_Dictionary_(partial,_draft_8-25-06_rev1,_DG).pdf" path="Keck_NGAO_WBS_Dictionary_(partial,_draft_8-25-06_rev1,_DG).pdf" size="93422" user="Main.DonaldGavel" version="1"

Revision 352006-09-30 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
This collection is for SD Phase Planning Documents

EC Telecon Dial-in Number 877-280-4645 with passcode 540030 (via CARA)

Changed:
<
<
>
>
 
Changed:
<
<
>
>
 

META FILEATTACHMENT attr="" autoattached="1" comment="(PDF form of above)" date="1157577901" name="NGAO_SD_schedule_v6.pdf" path="NGAO_SD_schedule_v6.pdf" size="58177" user="Main.DonaldGavel" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Final version of the MS Project Plan used in preparing the SEMP document sent to the Directors on 9/29/06" date="1159588156" name="NGAO_SD_schedule_v20.mpp" path="NGAO_SD_schedule_v20.mpp" size="630272" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Rich's pass - now handing back to Peter" date="1159343456" name="NGAO_SD_schedule_v13.mpp" path="NGAO_SD_schedule_v13.mpp" size="610816" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Includes wk-hrs mapped onto SD SEMP .mpp v10" date="1159249216" name="NGAO_SD_Team_Meetings_v_09.xls" path="NGAO_SD_Team_Meetings_v_09.xls" size="61440" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="9/28/06 2:45 pm PDT version" date="1159479841" name="NGAO_SD_schedule_v16.mpp" path="NGAO_SD_schedule_v16.mpp" size="640000" user="Main.PeterWizinowich" version="2"
Line: 25 to 27
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1158791801" name="NGAO_SD_Team_Meetings_v_07.xls" path="NGAO_SD_Team_Meetings_v_07.xls" size="62976" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1159476728" name="NGAO_SD_System_Eng_Mgmt_Plan_v14.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v14.doc" size="1353216" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 2" date="1156533845" name="NGAO_WBS_RGD_v_01_level_2.pdf" path="NGAO_WBS_RGD_v_01_level_2.pdf" size="22860" user="Main.RichardDekany" version="1"
Changed:
<
<
META FILEATTACHMENT attr="" autoattached="1" comment="9/29/06 2:25 pm PDT version" date="1159565204" name="NGAO_SD_System_Eng_Mgmt_Plan_v20.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v20.doc" size="1585664" user="Main.PeterWizinowich" version="1"
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="9/29/06 Version sent to Directors" date="1159587774" name="NGAO_SD_System_Eng_Mgmt_Plan_v20.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v20.doc" size="1435136" user="Main.PeterWizinowich" version="2"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/25/06)" date="1159240938" name="NGAO_SD_schedule_v10.mpp" path="NGAO_SD_schedule_v10.mpp" size="579584" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/22/06)" date="1158979993" name="NGAO_SD_schedule_v9.mpp" path="NGAO_SD_schedule_v9.mpp" size="630784" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/12/06)" date="1158089961" name="NGAO_SD_schedule_v7.mpp" path="NGAO_SD_schedule_v7.mpp" size="449536" user="Main.PeterWizinowich" version="1"

Revision 342006-09-29 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
This collection is for SD Phase Planning Documents

EC Telecon Dial-in Number 877-280-4645 with passcode 540030 (via CARA)

Changed:
<
<
>
>
 
Line: 25 to 25
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1158791801" name="NGAO_SD_Team_Meetings_v_07.xls" path="NGAO_SD_Team_Meetings_v_07.xls" size="62976" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1159476728" name="NGAO_SD_System_Eng_Mgmt_Plan_v14.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v14.doc" size="1353216" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 2" date="1156533845" name="NGAO_WBS_RGD_v_01_level_2.pdf" path="NGAO_WBS_RGD_v_01_level_2.pdf" size="22860" user="Main.RichardDekany" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="9/29/06 2:25 pm PDT version" date="1159565204" name="NGAO_SD_System_Eng_Mgmt_Plan_v20.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v20.doc" size="1585664" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/25/06)" date="1159240938" name="NGAO_SD_schedule_v10.mpp" path="NGAO_SD_schedule_v10.mpp" size="579584" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/22/06)" date="1158979993" name="NGAO_SD_schedule_v9.mpp" path="NGAO_SD_schedule_v9.mpp" size="630784" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/12/06)" date="1158089961" name="NGAO_SD_schedule_v7.mpp" path="NGAO_SD_schedule_v7.mpp" size="449536" user="Main.PeterWizinowich" version="1"

Revision 332006-09-29 - RichardDekany

Line: 1 to 1
 
META TOPICPARENT
This collection is for SD Phase Planning Documents

EC Telecon Dial-in Number 877-280-4645 with passcode 540030 (via CARA)

Changed:
<
<
>
>
 
Line: 33 to 33
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1158965808" name="Sci_requirement_Performance_budget_Iterations.pdf" path="Sci_requirement_Performance_budget_Iterations.pdf" size="45806" user="Main.RichardDekany" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept 7, 2006" date="1157660734" name="NGAO_SD_System_Eng_Mgmt_Plan_v05.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v05.doc" size="559616" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Peter's 9/27/06 version" date="1159413795" name="NGAO_SD_schedule_v14.mpp" path="NGAO_SD_schedule_v14.mpp" size="615936" user="Main.PeterWizinowich" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="WBS cleaned, but not perfect; work flow updated" date="1159557592" name="NGAO_SD_System_Eng_Mgmt_Plan_v17.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v17.doc" size="1526784" user="Main.RichardDekany" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Org chart as of Sept 7, 2006" date="1157660777" name="NGAO_SD_org_chart.vsd" path="NGAO_SD_org_chart.vsd" size="113664" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Updated 9/22/06" date="1158965020" name="NGAO_SD_Team_Meetings_v_08.xls" path="NGAO_SD_Team_Meetings_v_08.xls" size="62976" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 6" date="1156533887" name="NGAO_WBS_RGD_v_01_level_6.pdf" path="NGAO_WBS_RGD_v_01_level_6.pdf" size="46247" user="Main.RichardDekany" version="1"

Revision 322006-09-29 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
This collection is for SD Phase Planning Documents

EC Telecon Dial-in Number 877-280-4645 with passcode 540030 (via CARA)

Changed:
<
<
>
>
 
Line: 14 to 14
 
META FILEATTACHMENT attr="" autoattached="1" comment="(PDF form of above)" date="1157577901" name="NGAO_SD_schedule_v6.pdf" path="NGAO_SD_schedule_v6.pdf" size="58177" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Rich's pass - now handing back to Peter" date="1159343456" name="NGAO_SD_schedule_v13.mpp" path="NGAO_SD_schedule_v13.mpp" size="610816" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Includes wk-hrs mapped onto SD SEMP .mpp v10" date="1159249216" name="NGAO_SD_Team_Meetings_v_09.xls" path="NGAO_SD_Team_Meetings_v_09.xls" size="61440" user="Main.RichardDekany" version="1"
Changed:
<
<
META FILEATTACHMENT attachment="NGAO_SD_schedule_v16.mpp" attr="" comment="9/28/06 2:45 pm PDT version" date="1159479841" name="NGAO_SD_schedule_v16.mpp" path="h:\ao_docs\ngao system design\NGAO SD schedule v16.mpp" size="640000" stream="h:\ao_docs\ngao system design\NGAO SD schedule v16.mpp" user="Main.PeterWizinowich" version="2"
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="9/28/06 2:45 pm PDT version" date="1159479841" name="NGAO_SD_schedule_v16.mpp" path="NGAO_SD_schedule_v16.mpp" size="640000" user="Main.PeterWizinowich" version="2"
 
META FILEATTACHMENT attr="" autoattached="1" comment="version insertable into SD SEMP" date="1159249694" name="NGAO_SD_Team_Meetings_v_09.tiff" path="NGAO_SD_Team_Meetings_v_09.tiff" size="11238144" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept 11, 2006" date="1158006879" name="NGAO_SD_System_Eng_Mgmt_Plan_v08.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v08.doc" size="1090560" user="Main.PeterWizinowich" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan" date="1157577832" name="NGAO_SD_schedule_v6.mpp" path="NGAO_SD_schedule_v6.mpp" size="262656" user="Main.DonaldGavel" version="1"
Line: 28 to 28
 
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/25/06)" date="1159240938" name="NGAO_SD_schedule_v10.mpp" path="NGAO_SD_schedule_v10.mpp" size="579584" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/22/06)" date="1158979993" name="NGAO_SD_schedule_v9.mpp" path="NGAO_SD_schedule_v9.mpp" size="630784" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/12/06)" date="1158089961" name="NGAO_SD_schedule_v7.mpp" path="NGAO_SD_schedule_v7.mpp" size="449536" user="Main.PeterWizinowich" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="9/28/06 8:45 pm PDT version" date="1159501554" name="NGAO_SD_System_Eng_Mgmt_Plan_v16.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v16.doc" size="1295872" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1157577088" name="NGAO_SD_System_Eng_Mgmt_Plan_v04.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v04.doc" size="480256" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1158965808" name="Sci_requirement_Performance_budget_Iterations.pdf" path="Sci_requirement_Performance_budget_Iterations.pdf" size="45806" user="Main.RichardDekany" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept 7, 2006" date="1157660734" name="NGAO_SD_System_Eng_Mgmt_Plan_v05.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v05.doc" size="559616" user="Main.DonaldGavel" version="1"
Line: 39 to 40
 
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept. 26, 2006" date="1159309264" name="NGAO_SD_System_Eng_Mgmt_Plan_v13.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v13.doc" size="1347584" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1159466578" name="NGAO_SD_schedule_v15.mpp" path="NGAO_SD_schedule_v15.mpp" size="598528" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept. 25, 2006" date="1159240995" name="NGAO_SD_System_Eng_Mgmt_Plan_v12.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v12.doc" size="1308672" user="Main.PeterWizinowich" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="9/28/07 8:40 pm PDT version" date="1159501283" name="NGAO_SD_schedule_v17.mpp" path="NGAO_SD_schedule_v17.mpp" size="660992" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept. 12, 2006" date="1158090082" name="NGAO_SD_System_Eng_Mgmt_Plan_v09.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v09.doc" size="1249792" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/26/06)" date="1159309314" name="NGAO_SD_schedule_v11.mpp" path="NGAO_SD_schedule_v11.mpp" size="766976" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="revised - includes enties for real-time controller" date="1156545727" name="Keck_NGAO_WBS_Dictionary_(partial,_draft_8-25-06_rev1,_DG).pdf" path="Keck_NGAO_WBS_Dictionary_(partial,_draft_8-25-06_rev1,_DG).pdf" size="93422" user="Main.DonaldGavel" version="1"

Revision 312006-09-28 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
This collection is for SD Phase Planning Documents
Line: 14 to 14
 
META FILEATTACHMENT attr="" autoattached="1" comment="(PDF form of above)" date="1157577901" name="NGAO_SD_schedule_v6.pdf" path="NGAO_SD_schedule_v6.pdf" size="58177" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Rich's pass - now handing back to Peter" date="1159343456" name="NGAO_SD_schedule_v13.mpp" path="NGAO_SD_schedule_v13.mpp" size="610816" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Includes wk-hrs mapped onto SD SEMP .mpp v10" date="1159249216" name="NGAO_SD_Team_Meetings_v_09.xls" path="NGAO_SD_Team_Meetings_v_09.xls" size="61440" user="Main.RichardDekany" version="1"
Changed:
<
<
META FILEATTACHMENT attr="" autoattached="1" comment="9/28/06 1 pm PDT version" date="1159473817" name="NGAO_SD_schedule_v16.mpp" path="NGAO_SD_schedule_v16.mpp" size="617472" user="Main.PeterWizinowich" version="1"
>
>
META FILEATTACHMENT attachment="NGAO_SD_schedule_v16.mpp" attr="" comment="9/28/06 2:45 pm PDT version" date="1159479841" name="NGAO_SD_schedule_v16.mpp" path="h:\ao_docs\ngao system design\NGAO SD schedule v16.mpp" size="640000" stream="h:\ao_docs\ngao system design\NGAO SD schedule v16.mpp" user="Main.PeterWizinowich" version="2"
 
META FILEATTACHMENT attr="" autoattached="1" comment="version insertable into SD SEMP" date="1159249694" name="NGAO_SD_Team_Meetings_v_09.tiff" path="NGAO_SD_Team_Meetings_v_09.tiff" size="11238144" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept 11, 2006" date="1158006879" name="NGAO_SD_System_Eng_Mgmt_Plan_v08.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v08.doc" size="1090560" user="Main.PeterWizinowich" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan" date="1157577832" name="NGAO_SD_schedule_v6.mpp" path="NGAO_SD_schedule_v6.mpp" size="262656" user="Main.DonaldGavel" version="1"

Revision 302006-09-28 - RichardDekany

Line: 1 to 1
 
META TOPICPARENT
This collection is for SD Phase Planning Documents

EC Telecon Dial-in Number 877-280-4645 with passcode 540030 (via CARA)

Changed:
<
<
>
>
 
Line: 14 to 14
 
META FILEATTACHMENT attr="" autoattached="1" comment="(PDF form of above)" date="1157577901" name="NGAO_SD_schedule_v6.pdf" path="NGAO_SD_schedule_v6.pdf" size="58177" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Rich's pass - now handing back to Peter" date="1159343456" name="NGAO_SD_schedule_v13.mpp" path="NGAO_SD_schedule_v13.mpp" size="610816" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Includes wk-hrs mapped onto SD SEMP .mpp v10" date="1159249216" name="NGAO_SD_Team_Meetings_v_09.xls" path="NGAO_SD_Team_Meetings_v_09.xls" size="61440" user="Main.RichardDekany" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="9/28/06 1 pm PDT version" date="1159473817" name="NGAO_SD_schedule_v16.mpp" path="NGAO_SD_schedule_v16.mpp" size="617472" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="version insertable into SD SEMP" date="1159249694" name="NGAO_SD_Team_Meetings_v_09.tiff" path="NGAO_SD_Team_Meetings_v_09.tiff" size="11238144" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept 11, 2006" date="1158006879" name="NGAO_SD_System_Eng_Mgmt_Plan_v08.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v08.doc" size="1090560" user="Main.PeterWizinowich" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan" date="1157577832" name="NGAO_SD_schedule_v6.mpp" path="NGAO_SD_schedule_v6.mpp" size="262656" user="Main.DonaldGavel" version="1"
Line: 22 to 23
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1158183658" name="NGAO_SD_schedule_v7.pdf" path="NGAO_SD_schedule_v7.pdf" size="66532" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Includes wk-hrs mapped onto SD SEMP .mpp v10" date="1159249289" name="NGAO_SD_Team_Meetings_v_09.pdf" path="NGAO_SD_Team_Meetings_v_09.pdf" size="15959" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1158791801" name="NGAO_SD_Team_Meetings_v_07.xls" path="NGAO_SD_Team_Meetings_v_07.xls" size="62976" user="Main.RichardDekany" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1159476728" name="NGAO_SD_System_Eng_Mgmt_Plan_v14.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v14.doc" size="1353216" user="Main.RichardDekany" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 2" date="1156533845" name="NGAO_WBS_RGD_v_01_level_2.pdf" path="NGAO_WBS_RGD_v_01_level_2.pdf" size="22860" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/25/06)" date="1159240938" name="NGAO_SD_schedule_v10.mpp" path="NGAO_SD_schedule_v10.mpp" size="579584" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/22/06)" date="1158979993" name="NGAO_SD_schedule_v9.mpp" path="NGAO_SD_schedule_v9.mpp" size="630784" user="Main.PeterWizinowich" version="1"
Line: 44 to 46
 
META FILEATTACHMENT attr="" autoattached="1" comment="Suggestion for Work Breakdown Structure - in org-chart format" date="1156543102" name="WBS_Architecture_DG_Aug2506.pdf" path="WBS_Architecture_DG_Aug2506.pdf" size="16915" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="TIFF format" date="1159392091" name="Sci_requirement_Performance_budget_Iterations_v1.tiff" path="Sci_requirement_Performance_budget_Iterations_v1.tiff" size="155728" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Early draft, WBS structure unclear" date="1156449903" name="SD_phase_WBS_dictionary_v03.xls" path="SD_phase_WBS_dictionary_v03.xls" size="37376" user="Main.RichardDekany" version="1"
Deleted:
<
<
META FILEATTACHMENT attachment="NGAO_SD_schedule_v16.mpp" attr="" comment="9/28/06 1 pm PDT version" date="1159473817" name="NGAO_SD_schedule_v16.mpp" path="h:\ao_docs\ngao system design\NGAO SD schedule v16.mpp" size="617472" stream="h:\ao_docs\ngao system design\NGAO SD schedule v16.mpp" user="Main.PeterWizinowich" version="1"

Revision 292006-09-28 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
This collection is for SD Phase Planning Documents
Line: 11 to 11
 
Deleted:
<
<
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1157577088" name="NGAO_SD_System_Eng_Mgmt_Plan_v04.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v04.doc" size="480256" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1158965808" name="Sci_requirement_Performance_budget_Iterations.pdf" path="Sci_requirement_Performance_budget_Iterations.pdf" size="45806" user="Main.RichardDekany" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept 7, 2006" date="1157660734" name="NGAO_SD_System_Eng_Mgmt_Plan_v05.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v05.doc" size="559616" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Peter's 9/27/06 version" date="1159413795" name="NGAO_SD_schedule_v14.mpp" path="NGAO_SD_schedule_v14.mpp" size="615936" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="(PDF form of above)" date="1157577901" name="NGAO_SD_schedule_v6.pdf" path="NGAO_SD_schedule_v6.pdf" size="58177" user="Main.DonaldGavel" version="1"
Deleted:
<
<
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Org chart as of Sept 7, 2006" date="1157660777" name="NGAO_SD_org_chart.vsd" path="NGAO_SD_org_chart.vsd" size="113664" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Updated 9/22/06" date="1158965020" name="NGAO_SD_Team_Meetings_v_08.xls" path="NGAO_SD_Team_Meetings_v_08.xls" size="62976" user="Main.RichardDekany" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Rich's pass - now handing back to Peter" date="1159343456" name="NGAO_SD_schedule_v13.mpp" path="NGAO_SD_schedule_v13.mpp" size="610816" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Includes wk-hrs mapped onto SD SEMP .mpp v10" date="1159249216" name="NGAO_SD_Team_Meetings_v_09.xls" path="NGAO_SD_Team_Meetings_v_09.xls" size="61440" user="Main.RichardDekany" version="1"
Deleted:
<
<
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 6" date="1156533887" name="NGAO_WBS_RGD_v_01_level_6.pdf" path="NGAO_WBS_RGD_v_01_level_6.pdf" size="46247" user="Main.RichardDekany" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="version insertable into SD SEMP" date="1159249694" name="NGAO_SD_Team_Meetings_v_09.tiff" path="NGAO_SD_Team_Meetings_v_09.tiff" size="11238144" user="Main.RichardDekany" version="1"
Deleted:
<
<
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept. 22, 2006" date="1158979846" name="NGAO_SD_System_Eng_Mgmt_Plan_v11.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v11.doc" size="1267712" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept 11, 2006" date="1158006879" name="NGAO_SD_System_Eng_Mgmt_Plan_v08.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v08.doc" size="1090560" user="Main.PeterWizinowich" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan" date="1157577832" name="NGAO_SD_schedule_v6.mpp" path="NGAO_SD_schedule_v6.mpp" size="262656" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 3" date="1156533867" name="NGAO_WBS_RGD_v_01_level_3.pdf" path="NGAO_WBS_RGD_v_01_level_3.pdf" size="36072" user="Main.RichardDekany" version="1"
Line: 30 to 22
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1158183658" name="NGAO_SD_schedule_v7.pdf" path="NGAO_SD_schedule_v7.pdf" size="66532" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Includes wk-hrs mapped onto SD SEMP .mpp v10" date="1159249289" name="NGAO_SD_Team_Meetings_v_09.pdf" path="NGAO_SD_Team_Meetings_v_09.pdf" size="15959" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1158791801" name="NGAO_SD_Team_Meetings_v_07.xls" path="NGAO_SD_Team_Meetings_v_07.xls" size="62976" user="Main.RichardDekany" version="1"
Deleted:
<
<
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept. 26, 2006" date="1159309264" name="NGAO_SD_System_Eng_Mgmt_Plan_v13.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v13.doc" size="1347584" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 2" date="1156533845" name="NGAO_WBS_RGD_v_01_level_2.pdf" path="NGAO_WBS_RGD_v_01_level_2.pdf" size="22860" user="Main.RichardDekany" version="1"
Deleted:
<
<
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept. 25, 2006" date="1159240995" name="NGAO_SD_System_Eng_Mgmt_Plan_v12.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v12.doc" size="1308672" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/25/06)" date="1159240938" name="NGAO_SD_schedule_v10.mpp" path="NGAO_SD_schedule_v10.mpp" size="579584" user="Main.PeterWizinowich" version="1"
Deleted:
<
<
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept. 12, 2006" date="1158090082" name="NGAO_SD_System_Eng_Mgmt_Plan_v09.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v09.doc" size="1249792" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/22/06)" date="1158979993" name="NGAO_SD_schedule_v9.mpp" path="NGAO_SD_schedule_v9.mpp" size="630784" user="Main.PeterWizinowich" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/12/06)" date="1158089961" name="NGAO_SD_schedule_v7.mpp" path="NGAO_SD_schedule_v7.mpp" size="449536" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1157577088" name="NGAO_SD_System_Eng_Mgmt_Plan_v04.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v04.doc" size="480256" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1158965808" name="Sci_requirement_Performance_budget_Iterations.pdf" path="Sci_requirement_Performance_budget_Iterations.pdf" size="45806" user="Main.RichardDekany" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept 7, 2006" date="1157660734" name="NGAO_SD_System_Eng_Mgmt_Plan_v05.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v05.doc" size="559616" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Peter's 9/27/06 version" date="1159413795" name="NGAO_SD_schedule_v14.mpp" path="NGAO_SD_schedule_v14.mpp" size="615936" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Org chart as of Sept 7, 2006" date="1157660777" name="NGAO_SD_org_chart.vsd" path="NGAO_SD_org_chart.vsd" size="113664" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Updated 9/22/06" date="1158965020" name="NGAO_SD_Team_Meetings_v_08.xls" path="NGAO_SD_Team_Meetings_v_08.xls" size="62976" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 6" date="1156533887" name="NGAO_WBS_RGD_v_01_level_6.pdf" path="NGAO_WBS_RGD_v_01_level_6.pdf" size="46247" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept. 22, 2006" date="1158979846" name="NGAO_SD_System_Eng_Mgmt_Plan_v11.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v11.doc" size="1267712" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept. 26, 2006" date="1159309264" name="NGAO_SD_System_Eng_Mgmt_Plan_v13.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v13.doc" size="1347584" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1159466578" name="NGAO_SD_schedule_v15.mpp" path="NGAO_SD_schedule_v15.mpp" size="598528" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept. 25, 2006" date="1159240995" name="NGAO_SD_System_Eng_Mgmt_Plan_v12.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v12.doc" size="1308672" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept. 12, 2006" date="1158090082" name="NGAO_SD_System_Eng_Mgmt_Plan_v09.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v09.doc" size="1249792" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/26/06)" date="1159309314" name="NGAO_SD_schedule_v11.mpp" path="NGAO_SD_schedule_v11.mpp" size="766976" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="revised - includes enties for real-time controller" date="1156545727" name="Keck_NGAO_WBS_Dictionary_(partial,_draft_8-25-06_rev1,_DG).pdf" path="Keck_NGAO_WBS_Dictionary_(partial,_draft_8-25-06_rev1,_DG).pdf" size="93422" user="Main.DonaldGavel" version="1"
Deleted:
<
<
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/12/06)" date="1158089961" name="NGAO_SD_schedule_v7.mpp" path="NGAO_SD_schedule_v7.mpp" size="449536" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/26/06 pm)" date="1159326225" name="NGAO_SD_schedule_v12.mpp" path="NGAO_SD_schedule_v12.mpp" size="631296" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Suggestion for Work Breakdown Structure - in org-chart format" date="1156543102" name="WBS_Architecture_DG_Aug2506.pdf" path="WBS_Architecture_DG_Aug2506.pdf" size="16915" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="TIFF format" date="1159392091" name="Sci_requirement_Performance_budget_Iterations_v1.tiff" path="Sci_requirement_Performance_budget_Iterations_v1.tiff" size="155728" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Early draft, WBS structure unclear" date="1156449903" name="SD_phase_WBS_dictionary_v03.xls" path="SD_phase_WBS_dictionary_v03.xls" size="37376" user="Main.RichardDekany" version="1"
Changed:
<
<
META FILEATTACHMENT attachment="NGAO_SD_schedule_v15.mpp" attr="" comment="" date="1159466578" name="NGAO_SD_schedule_v15.mpp" path="NGAO_SD_schedule_v15.mpp" size="598528" stream="NGAO_SD_schedule_v15.mpp" user="Main.RichardDekany" version="1"
>
>
META FILEATTACHMENT attachment="NGAO_SD_schedule_v16.mpp" attr="" comment="9/28/06 1 pm PDT version" date="1159473817" name="NGAO_SD_schedule_v16.mpp" path="h:\ao_docs\ngao system design\NGAO SD schedule v16.mpp" size="617472" stream="h:\ao_docs\ngao system design\NGAO SD schedule v16.mpp" user="Main.PeterWizinowich" version="1"

Revision 282006-09-28 - RichardDekany

Line: 1 to 1
 
META TOPICPARENT
This collection is for SD Phase Planning Documents
Line: 43 to 43
 
META FILEATTACHMENT attr="" autoattached="1" comment="Suggestion for Work Breakdown Structure - in org-chart format" date="1156543102" name="WBS_Architecture_DG_Aug2506.pdf" path="WBS_Architecture_DG_Aug2506.pdf" size="16915" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="TIFF format" date="1159392091" name="Sci_requirement_Performance_budget_Iterations_v1.tiff" path="Sci_requirement_Performance_budget_Iterations_v1.tiff" size="155728" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Early draft, WBS structure unclear" date="1156449903" name="SD_phase_WBS_dictionary_v03.xls" path="SD_phase_WBS_dictionary_v03.xls" size="37376" user="Main.RichardDekany" version="1"
Added:
>
>
META FILEATTACHMENT attachment="NGAO_SD_schedule_v15.mpp" attr="" comment="" date="1159466578" name="NGAO_SD_schedule_v15.mpp" path="NGAO_SD_schedule_v15.mpp" size="598528" stream="NGAO_SD_schedule_v15.mpp" user="Main.RichardDekany" version="1"

Revision 272006-09-28 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
This collection is for SD Phase Planning Documents
Line: 6 to 6
 
Changed:
<
<
>
>
 
Line: 14 to 14
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1157577088" name="NGAO_SD_System_Eng_Mgmt_Plan_v04.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v04.doc" size="480256" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1158965808" name="Sci_requirement_Performance_budget_Iterations.pdf" path="Sci_requirement_Performance_budget_Iterations.pdf" size="45806" user="Main.RichardDekany" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept 7, 2006" date="1157660734" name="NGAO_SD_System_Eng_Mgmt_Plan_v05.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v05.doc" size="559616" user="Main.DonaldGavel" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Peter's 9/27/06 version" date="1159413795" name="NGAO_SD_schedule_v14.mpp" path="NGAO_SD_schedule_v14.mpp" size="615936" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="(PDF form of above)" date="1157577901" name="NGAO_SD_schedule_v6.pdf" path="NGAO_SD_schedule_v6.pdf" size="58177" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Org chart as of Sept 7, 2006" date="1157660777" name="NGAO_SD_org_chart.vsd" path="NGAO_SD_org_chart.vsd" size="113664" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Updated 9/22/06" date="1158965020" name="NGAO_SD_Team_Meetings_v_08.xls" path="NGAO_SD_Team_Meetings_v_08.xls" size="62976" user="Main.RichardDekany" version="1"

Revision 262006-09-27 - RichardDekany

Line: 1 to 1
 
META TOPICPARENT
This collection is for SD Phase Planning Documents
Changed:
<
<
>
>
EC Telecon Dial-in Number 877-280-4645 with passcode 540030 (via CARA)

 
Changed:
<
<
>
>
 
Line: 37 to 40
 
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/12/06)" date="1158089961" name="NGAO_SD_schedule_v7.mpp" path="NGAO_SD_schedule_v7.mpp" size="449536" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/26/06 pm)" date="1159326225" name="NGAO_SD_schedule_v12.mpp" path="NGAO_SD_schedule_v12.mpp" size="631296" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Suggestion for Work Breakdown Structure - in org-chart format" date="1156543102" name="WBS_Architecture_DG_Aug2506.pdf" path="WBS_Architecture_DG_Aug2506.pdf" size="16915" user="Main.DonaldGavel" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="TIFF format" date="1159392091" name="Sci_requirement_Performance_budget_Iterations_v1.tiff" path="Sci_requirement_Performance_budget_Iterations_v1.tiff" size="155728" user="Main.RichardDekany" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Early draft, WBS structure unclear" date="1156449903" name="SD_phase_WBS_dictionary_v03.xls" path="SD_phase_WBS_dictionary_v03.xls" size="37376" user="Main.RichardDekany" version="1"

Revision 252006-09-27 - RichardDekany

Line: 1 to 1
 
META TOPICPARENT
This collection is for SD Phase Planning Documents

Changed:
<
<
>
>
 
Line: 15 to 14
 
META FILEATTACHMENT attr="" autoattached="1" comment="(PDF form of above)" date="1157577901" name="NGAO_SD_schedule_v6.pdf" path="NGAO_SD_schedule_v6.pdf" size="58177" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Org chart as of Sept 7, 2006" date="1157660777" name="NGAO_SD_org_chart.vsd" path="NGAO_SD_org_chart.vsd" size="113664" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Updated 9/22/06" date="1158965020" name="NGAO_SD_Team_Meetings_v_08.xls" path="NGAO_SD_Team_Meetings_v_08.xls" size="62976" user="Main.RichardDekany" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Rich's pass - now handing back to Peter" date="1159343456" name="NGAO_SD_schedule_v13.mpp" path="NGAO_SD_schedule_v13.mpp" size="610816" user="Main.RichardDekany" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Includes wk-hrs mapped onto SD SEMP .mpp v10" date="1159249216" name="NGAO_SD_Team_Meetings_v_09.xls" path="NGAO_SD_Team_Meetings_v_09.xls" size="61440" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 6" date="1156533887" name="NGAO_WBS_RGD_v_01_level_6.pdf" path="NGAO_WBS_RGD_v_01_level_6.pdf" size="46247" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="version insertable into SD SEMP" date="1159249694" name="NGAO_SD_Team_Meetings_v_09.tiff" path="NGAO_SD_Team_Meetings_v_09.tiff" size="11238144" user="Main.RichardDekany" version="1"

Revision 242006-09-27 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
This collection is for SD Phase Planning Documents

Changed:
<
<
>
>
 
Line: 35 to 35
 
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/26/06)" date="1159309314" name="NGAO_SD_schedule_v11.mpp" path="NGAO_SD_schedule_v11.mpp" size="766976" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="revised - includes enties for real-time controller" date="1156545727" name="Keck_NGAO_WBS_Dictionary_(partial,_draft_8-25-06_rev1,_DG).pdf" path="Keck_NGAO_WBS_Dictionary_(partial,_draft_8-25-06_rev1,_DG).pdf" size="93422" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/12/06)" date="1158089961" name="NGAO_SD_schedule_v7.mpp" path="NGAO_SD_schedule_v7.mpp" size="449536" user="Main.PeterWizinowich" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/26/06 pm)" date="1159326225" name="NGAO_SD_schedule_v12.mpp" path="NGAO_SD_schedule_v12.mpp" size="631296" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Suggestion for Work Breakdown Structure - in org-chart format" date="1156543102" name="WBS_Architecture_DG_Aug2506.pdf" path="WBS_Architecture_DG_Aug2506.pdf" size="16915" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Early draft, WBS structure unclear" date="1156449903" name="SD_phase_WBS_dictionary_v03.xls" path="SD_phase_WBS_dictionary_v03.xls" size="37376" user="Main.RichardDekany" version="1"

Revision 232006-09-26 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
This collection is for SD Phase Planning Documents

Changed:
<
<
>
>
 
Line: 25 to 26
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1158183658" name="NGAO_SD_schedule_v7.pdf" path="NGAO_SD_schedule_v7.pdf" size="66532" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Includes wk-hrs mapped onto SD SEMP .mpp v10" date="1159249289" name="NGAO_SD_Team_Meetings_v_09.pdf" path="NGAO_SD_Team_Meetings_v_09.pdf" size="15959" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1158791801" name="NGAO_SD_Team_Meetings_v_07.xls" path="NGAO_SD_Team_Meetings_v_07.xls" size="62976" user="Main.RichardDekany" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept. 26, 2006" date="1159309264" name="NGAO_SD_System_Eng_Mgmt_Plan_v13.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v13.doc" size="1347584" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 2" date="1156533845" name="NGAO_WBS_RGD_v_01_level_2.pdf" path="NGAO_WBS_RGD_v_01_level_2.pdf" size="22860" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept. 25, 2006" date="1159240995" name="NGAO_SD_System_Eng_Mgmt_Plan_v12.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v12.doc" size="1308672" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/25/06)" date="1159240938" name="NGAO_SD_schedule_v10.mpp" path="NGAO_SD_schedule_v10.mpp" size="579584" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept. 12, 2006" date="1158090082" name="NGAO_SD_System_Eng_Mgmt_Plan_v09.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v09.doc" size="1249792" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/22/06)" date="1158979993" name="NGAO_SD_schedule_v9.mpp" path="NGAO_SD_schedule_v9.mpp" size="630784" user="Main.PeterWizinowich" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/26/06)" date="1159309314" name="NGAO_SD_schedule_v11.mpp" path="NGAO_SD_schedule_v11.mpp" size="766976" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="revised - includes enties for real-time controller" date="1156545727" name="Keck_NGAO_WBS_Dictionary_(partial,_draft_8-25-06_rev1,_DG).pdf" path="Keck_NGAO_WBS_Dictionary_(partial,_draft_8-25-06_rev1,_DG).pdf" size="93422" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/12/06)" date="1158089961" name="NGAO_SD_schedule_v7.mpp" path="NGAO_SD_schedule_v7.mpp" size="449536" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Suggestion for Work Breakdown Structure - in org-chart format" date="1156543102" name="WBS_Architecture_DG_Aug2506.pdf" path="WBS_Architecture_DG_Aug2506.pdf" size="16915" user="Main.DonaldGavel" version="1"

Revision 222006-09-26 - RichardDekany

Line: 1 to 1
 
META TOPICPARENT
This collection is for SD Phase Planning Documents

Changed:
<
<
>
>
 
Deleted:
<
<
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1157577088" name="NGAO_SD_System_Eng_Mgmt_Plan_v04.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v04.doc" size="480256" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1158965808" name="Sci_requirement_Performance_budget_Iterations.pdf" path="Sci_requirement_Performance_budget_Iterations.pdf" size="45806" user="Main.RichardDekany" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept 7, 2006" date="1157660734" name="NGAO_SD_System_Eng_Mgmt_Plan_v05.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v05.doc" size="559616" user="Main.DonaldGavel" version="1"
Line: 15 to 14
 
META FILEATTACHMENT attr="" autoattached="1" comment="(PDF form of above)" date="1157577901" name="NGAO_SD_schedule_v6.pdf" path="NGAO_SD_schedule_v6.pdf" size="58177" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Org chart as of Sept 7, 2006" date="1157660777" name="NGAO_SD_org_chart.vsd" path="NGAO_SD_org_chart.vsd" size="113664" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Updated 9/22/06" date="1158965020" name="NGAO_SD_Team_Meetings_v_08.xls" path="NGAO_SD_Team_Meetings_v_08.xls" size="62976" user="Main.RichardDekany" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Includes wk-hrs mapped onto SD SEMP .mpp v10" date="1159249216" name="NGAO_SD_Team_Meetings_v_09.xls" path="NGAO_SD_Team_Meetings_v_09.xls" size="61440" user="Main.RichardDekany" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 6" date="1156533887" name="NGAO_WBS_RGD_v_01_level_6.pdf" path="NGAO_WBS_RGD_v_01_level_6.pdf" size="46247" user="Main.RichardDekany" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="version insertable into SD SEMP" date="1159249694" name="NGAO_SD_Team_Meetings_v_09.tiff" path="NGAO_SD_Team_Meetings_v_09.tiff" size="11238144" user="Main.RichardDekany" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept. 22, 2006" date="1158979846" name="NGAO_SD_System_Eng_Mgmt_Plan_v11.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v11.doc" size="1267712" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept 11, 2006" date="1158006879" name="NGAO_SD_System_Eng_Mgmt_Plan_v08.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v08.doc" size="1090560" user="Main.PeterWizinowich" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan" date="1157577832" name="NGAO_SD_schedule_v6.mpp" path="NGAO_SD_schedule_v6.mpp" size="262656" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 3" date="1156533867" name="NGAO_WBS_RGD_v_01_level_3.pdf" path="NGAO_WBS_RGD_v_01_level_3.pdf" size="36072" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1158967784" name="Sci_requirement_Performance_budget_Iterations_v02.pdf" path="Sci_requirement_Performance_budget_Iterations_v02.pdf" size="45806" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1158183658" name="NGAO_SD_schedule_v7.pdf" path="NGAO_SD_schedule_v7.pdf" size="66532" user="Main.RichardDekany" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Includes wk-hrs mapped onto SD SEMP .mpp v10" date="1159249289" name="NGAO_SD_Team_Meetings_v_09.pdf" path="NGAO_SD_Team_Meetings_v_09.pdf" size="15959" user="Main.RichardDekany" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1158791801" name="NGAO_SD_Team_Meetings_v_07.xls" path="NGAO_SD_Team_Meetings_v_07.xls" size="62976" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 2" date="1156533845" name="NGAO_WBS_RGD_v_01_level_2.pdf" path="NGAO_WBS_RGD_v_01_level_2.pdf" size="22860" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept. 25, 2006" date="1159240995" name="NGAO_SD_System_Eng_Mgmt_Plan_v12.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v12.doc" size="1308672" user="Main.PeterWizinowich" version="1"

Revision 212006-09-26 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
This collection is for SD Phase Planning Documents

Changed:
<
<
>
>
 
Line: 24 to 24
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1158183658" name="NGAO_SD_schedule_v7.pdf" path="NGAO_SD_schedule_v7.pdf" size="66532" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1158791801" name="NGAO_SD_Team_Meetings_v_07.xls" path="NGAO_SD_Team_Meetings_v_07.xls" size="62976" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 2" date="1156533845" name="NGAO_WBS_RGD_v_01_level_2.pdf" path="NGAO_WBS_RGD_v_01_level_2.pdf" size="22860" user="Main.RichardDekany" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept. 25, 2006" date="1159240995" name="NGAO_SD_System_Eng_Mgmt_Plan_v12.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v12.doc" size="1308672" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/25/06)" date="1159240938" name="NGAO_SD_schedule_v10.mpp" path="NGAO_SD_schedule_v10.mpp" size="579584" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept. 12, 2006" date="1158090082" name="NGAO_SD_System_Eng_Mgmt_Plan_v09.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v09.doc" size="1249792" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/22/06)" date="1158979993" name="NGAO_SD_schedule_v9.mpp" path="NGAO_SD_schedule_v9.mpp" size="630784" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="revised - includes enties for real-time controller" date="1156545727" name="Keck_NGAO_WBS_Dictionary_(partial,_draft_8-25-06_rev1,_DG).pdf" path="Keck_NGAO_WBS_Dictionary_(partial,_draft_8-25-06_rev1,_DG).pdf" size="93422" user="Main.DonaldGavel" version="1"

Revision 202006-09-23 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
This collection is for SD Phase Planning Documents

Changed:
<
<
>
>
 
Line: 16 to 16
 
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Org chart as of Sept 7, 2006" date="1157660777" name="NGAO_SD_org_chart.vsd" path="NGAO_SD_org_chart.vsd" size="113664" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Updated 9/22/06" date="1158965020" name="NGAO_SD_Team_Meetings_v_08.xls" path="NGAO_SD_Team_Meetings_v_08.xls" size="62976" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 6" date="1156533887" name="NGAO_WBS_RGD_v_01_level_6.pdf" path="NGAO_WBS_RGD_v_01_level_6.pdf" size="46247" user="Main.RichardDekany" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept. 22, 2006" date="1158979846" name="NGAO_SD_System_Eng_Mgmt_Plan_v11.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v11.doc" size="1267712" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept 11, 2006" date="1158006879" name="NGAO_SD_System_Eng_Mgmt_Plan_v08.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v08.doc" size="1090560" user="Main.PeterWizinowich" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan" date="1157577832" name="NGAO_SD_schedule_v6.mpp" path="NGAO_SD_schedule_v6.mpp" size="262656" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 3" date="1156533867" name="NGAO_WBS_RGD_v_01_level_3.pdf" path="NGAO_WBS_RGD_v_01_level_3.pdf" size="36072" user="Main.RichardDekany" version="1"
Line: 24 to 25
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1158791801" name="NGAO_SD_Team_Meetings_v_07.xls" path="NGAO_SD_Team_Meetings_v_07.xls" size="62976" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 2" date="1156533845" name="NGAO_WBS_RGD_v_01_level_2.pdf" path="NGAO_WBS_RGD_v_01_level_2.pdf" size="22860" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept. 12, 2006" date="1158090082" name="NGAO_SD_System_Eng_Mgmt_Plan_v09.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v09.doc" size="1249792" user="Main.PeterWizinowich" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/22/06)" date="1158979993" name="NGAO_SD_schedule_v9.mpp" path="NGAO_SD_schedule_v9.mpp" size="630784" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="revised - includes enties for real-time controller" date="1156545727" name="Keck_NGAO_WBS_Dictionary_(partial,_draft_8-25-06_rev1,_DG).pdf" path="Keck_NGAO_WBS_Dictionary_(partial,_draft_8-25-06_rev1,_DG).pdf" size="93422" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/12/06)" date="1158089961" name="NGAO_SD_schedule_v7.mpp" path="NGAO_SD_schedule_v7.mpp" size="449536" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Suggestion for Work Breakdown Structure - in org-chart format" date="1156543102" name="WBS_Architecture_DG_Aug2506.pdf" path="WBS_Architecture_DG_Aug2506.pdf" size="16915" user="Main.DonaldGavel" version="1"

Revision 192006-09-22 - RichardDekany

Line: 1 to 1
 
META TOPICPARENT
This collection is for SD Phase Planning Documents
Changed:
<
<
>
>
 
Changed:
<
<
>
>
 

META FILEATTACHMENT attr="" autoattached="1" comment="" date="1157577088" name="NGAO_SD_System_Eng_Mgmt_Plan_v04.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v04.doc" size="480256" user="Main.DonaldGavel" version="1"
Changed:
<
<
META FILEATTACHMENT attr="" autoattached="1" comment="Draft 0.1 of Process" date="1158952224" name="Sci_requirement_Performance_budget_Iterations.pdf" path="Sci_requirement_Performance_budget_Iterations.pdf" size="41795" user="Main.RichardDekany" version="1"
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1158965808" name="Sci_requirement_Performance_budget_Iterations.pdf" path="Sci_requirement_Performance_budget_Iterations.pdf" size="45806" user="Main.RichardDekany" version="2"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept 7, 2006" date="1157660734" name="NGAO_SD_System_Eng_Mgmt_Plan_v05.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v05.doc" size="559616" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="(PDF form of above)" date="1157577901" name="NGAO_SD_schedule_v6.pdf" path="NGAO_SD_schedule_v6.pdf" size="58177" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Org chart as of Sept 7, 2006" date="1157660777" name="NGAO_SD_org_chart.vsd" path="NGAO_SD_org_chart.vsd" size="113664" user="Main.DonaldGavel" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Updated 9/22/06" date="1158965020" name="NGAO_SD_Team_Meetings_v_08.xls" path="NGAO_SD_Team_Meetings_v_08.xls" size="62976" user="Main.RichardDekany" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 6" date="1156533887" name="NGAO_WBS_RGD_v_01_level_6.pdf" path="NGAO_WBS_RGD_v_01_level_6.pdf" size="46247" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept 11, 2006" date="1158006879" name="NGAO_SD_System_Eng_Mgmt_Plan_v08.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v08.doc" size="1090560" user="Main.PeterWizinowich" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan" date="1157577832" name="NGAO_SD_schedule_v6.mpp" path="NGAO_SD_schedule_v6.mpp" size="262656" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 3" date="1156533867" name="NGAO_WBS_RGD_v_01_level_3.pdf" path="NGAO_WBS_RGD_v_01_level_3.pdf" size="36072" user="Main.RichardDekany" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1158967784" name="Sci_requirement_Performance_budget_Iterations_v02.pdf" path="Sci_requirement_Performance_budget_Iterations_v02.pdf" size="45806" user="Main.RichardDekany" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1158183658" name="NGAO_SD_schedule_v7.pdf" path="NGAO_SD_schedule_v7.pdf" size="66532" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1158791801" name="NGAO_SD_Team_Meetings_v_07.xls" path="NGAO_SD_Team_Meetings_v_07.xls" size="62976" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 2" date="1156533845" name="NGAO_WBS_RGD_v_01_level_2.pdf" path="NGAO_WBS_RGD_v_01_level_2.pdf" size="22860" user="Main.RichardDekany" version="1"

Revision 182006-09-22 - RichardDekany

Line: 1 to 1
 
META TOPICPARENT
This collection is for SD Phase Planning Documents
Changed:
<
<
>
>
 

Revision 172006-09-22 - RichardDekany

Line: 1 to 1
 
META TOPICPARENT
This collection is for SD Phase Planning Documents
Changed:
<
<
* NGAO_SD_System_Eng_Mgmt_Plan_v09.doc: Latest version of the System Engineering Management Plan, from Peter Wizinowich, Sept. 12, 2006

* NGAO_SD_schedule_v7.mpp: Latest version of the project plan, from Peter Wizinowich, Sept. 12, 2006 NGAO_SD_schedule_v7.pdf: (PDF)

* NGAO_SD_Team_Meetings_v_07.xls: Latest schedule of meetings, from Rich Dekany, Sept 20, 2006

>
>
  * SD Phase WBS Dictionary Assignments
Deleted:
<
<
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1157577088" name="NGAO_SD_System_Eng_Mgmt_Plan_v04.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v04.doc" size="480256" user="Main.DonaldGavel" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Draft 0.1 of Process" date="1158952224" name="Sci_requirement_Performance_budget_Iterations.pdf" path="Sci_requirement_Performance_budget_Iterations.pdf" size="41795" user="Main.RichardDekany" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept 7, 2006" date="1157660734" name="NGAO_SD_System_Eng_Mgmt_Plan_v05.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v05.doc" size="559616" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="(PDF form of above)" date="1157577901" name="NGAO_SD_schedule_v6.pdf" path="NGAO_SD_schedule_v6.pdf" size="58177" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Org chart as of Sept 7, 2006" date="1157660777" name="NGAO_SD_org_chart.vsd" path="NGAO_SD_org_chart.vsd" size="113664" user="Main.DonaldGavel" version="1"

Revision 162006-09-20 - RichardDekany

Line: 1 to 1
 
META TOPICPARENT
This collection is for SD Phase Planning Documents
Line: 6 to 6
  * NGAO_SD_schedule_v7.mpp: Latest version of the project plan, from Peter Wizinowich, Sept. 12, 2006 NGAO_SD_schedule_v7.pdf: (PDF)
Changed:
<
<
* NGAO_SD_Team_Meetings_v_06.xls: Latest schedule of meetings, from Rich Dekany, Sept 11, 2006
>
>
* NGAO_SD_Team_Meetings_v_07.xls: Latest schedule of meetings, from Rich Dekany, Sept 20, 2006
  * SD Phase WBS Dictionary Assignments
Line: 10 to 10
  * SD Phase WBS Dictionary Assignments
Added:
>
>
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1157577088" name="NGAO_SD_System_Eng_Mgmt_Plan_v04.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v04.doc" size="480256" user="Main.DonaldGavel" version="1"
Deleted:
<
<
META FILEATTACHMENT attr="" autoattached="1" comment="Version 0.6, w/ color coding" date="1158047478" name="NGAO_SD_Team_Meetings_v_06.xls" path="NGAO_SD_Team_Meetings_v_06.xls" size="63488" user="Main.RichardDekany" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept 7, 2006" date="1157660734" name="NGAO_SD_System_Eng_Mgmt_Plan_v05.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v05.doc" size="559616" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="(PDF form of above)" date="1157577901" name="NGAO_SD_schedule_v6.pdf" path="NGAO_SD_schedule_v6.pdf" size="58177" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Org chart as of Sept 7, 2006" date="1157660777" name="NGAO_SD_org_chart.vsd" path="NGAO_SD_org_chart.vsd" size="113664" user="Main.DonaldGavel" version="1"
Line: 20 to 20
 
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan" date="1157577832" name="NGAO_SD_schedule_v6.mpp" path="NGAO_SD_schedule_v6.mpp" size="262656" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 3" date="1156533867" name="NGAO_WBS_RGD_v_01_level_3.pdf" path="NGAO_WBS_RGD_v_01_level_3.pdf" size="36072" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1158183658" name="NGAO_SD_schedule_v7.pdf" path="NGAO_SD_schedule_v7.pdf" size="66532" user="Main.RichardDekany" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1158791801" name="NGAO_SD_Team_Meetings_v_07.xls" path="NGAO_SD_Team_Meetings_v_07.xls" size="62976" user="Main.RichardDekany" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 2" date="1156533845" name="NGAO_WBS_RGD_v_01_level_2.pdf" path="NGAO_WBS_RGD_v_01_level_2.pdf" size="22860" user="Main.RichardDekany" version="1"
Deleted:
<
<
META FILEATTACHMENT attr="" autoattached="1" comment="Version 0.3" date="1155859522" name="NGAO_SD_Team_Meetings_v_03.xls" path="NGAO_SD_Team_Meetings_v_03.xls" size="63488" user="Main.RichardDekany" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept. 12, 2006" date="1158090082" name="NGAO_SD_System_Eng_Mgmt_Plan_v09.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v09.doc" size="1249792" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="revised - includes enties for real-time controller" date="1156545727" name="Keck_NGAO_WBS_Dictionary_(partial,_draft_8-25-06_rev1,_DG).pdf" path="Keck_NGAO_WBS_Dictionary_(partial,_draft_8-25-06_rev1,_DG).pdf" size="93422" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/12/06)" date="1158089961" name="NGAO_SD_schedule_v7.mpp" path="NGAO_SD_schedule_v7.mpp" size="449536" user="Main.PeterWizinowich" version="1"
Deleted:
<
<
META FILEATTACHMENT attr="" autoattached="1" comment="Incorporating Peter's comments" date="1157657838" name="NGAO_SD_Team_Meetings_v_05.xls" path="NGAO_SD_Team_Meetings_v_05.xls" size="62976" user="Main.RichardDekany" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Suggestion for Work Breakdown Structure - in org-chart format" date="1156543102" name="WBS_Architecture_DG_Aug2506.pdf" path="WBS_Architecture_DG_Aug2506.pdf" size="16915" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Early draft, WBS structure unclear" date="1156449903" name="SD_phase_WBS_dictionary_v03.xls" path="SD_phase_WBS_dictionary_v03.xls" size="37376" user="Main.RichardDekany" version="1"

Revision 152006-09-13 - RichardDekany

Line: 1 to 1
 
META TOPICPARENT
This collection is for SD Phase Planning Documents

* NGAO_SD_System_Eng_Mgmt_Plan_v09.doc: Latest version of the System Engineering Management Plan, from Peter Wizinowich, Sept. 12, 2006

Changed:
<
<
* NGAO_SD_schedule_v7.mpp: Latest version of the project plan, from Peter Wizinowich, Sept. 12, 2006 NGAO_SD_schedule_v6.pdf: (PDF)
>
>
* NGAO_SD_schedule_v7.mpp: Latest version of the project plan, from Peter Wizinowich, Sept. 12, 2006 NGAO_SD_schedule_v7.pdf: (PDF)
  * NGAO_SD_Team_Meetings_v_06.xls: Latest schedule of meetings, from Rich Dekany, Sept 11, 2006
Line: 20 to 19
 
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept 11, 2006" date="1158006879" name="NGAO_SD_System_Eng_Mgmt_Plan_v08.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v08.doc" size="1090560" user="Main.PeterWizinowich" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan" date="1157577832" name="NGAO_SD_schedule_v6.mpp" path="NGAO_SD_schedule_v6.mpp" size="262656" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 3" date="1156533867" name="NGAO_WBS_RGD_v_01_level_3.pdf" path="NGAO_WBS_RGD_v_01_level_3.pdf" size="36072" user="Main.RichardDekany" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1158183658" name="NGAO_SD_schedule_v7.pdf" path="NGAO_SD_schedule_v7.pdf" size="66532" user="Main.RichardDekany" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 2" date="1156533845" name="NGAO_WBS_RGD_v_01_level_2.pdf" path="NGAO_WBS_RGD_v_01_level_2.pdf" size="22860" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Version 0.3" date="1155859522" name="NGAO_SD_Team_Meetings_v_03.xls" path="NGAO_SD_Team_Meetings_v_03.xls" size="63488" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept. 12, 2006" date="1158090082" name="NGAO_SD_System_Eng_Mgmt_Plan_v09.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v09.doc" size="1249792" user="Main.PeterWizinowich" version="1"

Revision 142006-09-12 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
This collection is for SD Phase Planning Documents
Added:
>
>
* NGAO_SD_System_Eng_Mgmt_Plan_v09.doc: Latest version of the System Engineering Management Plan, from Peter Wizinowich, Sept. 12, 2006
 
Changed:
<
<
* SD Phase WBS Dictionary Assignments
>
>
* NGAO_SD_schedule_v7.mpp: Latest version of the project plan, from Peter Wizinowich, Sept. 12, 2006 NGAO_SD_schedule_v6.pdf: (PDF)
 
Changed:
<
<
* NGAO_SD_schedule_v6.mpp: Latest version of the project plan, from Peter Wizinowich, Aug 31, 2006 NGAO_SD_schedule_v6.pdf: (PDF)
>
>
* NGAO_SD_Team_Meetings_v_06.xls: Latest schedule of meetings, from Rich Dekany, Sept 11, 2006
 
Added:
>
>
* SD Phase WBS Dictionary Assignments
 
Deleted:
<
<
* NGAO_SD_Team_Meetings_v_06.xls: Latest schedule of meetings, from Rich Dekany, Sept 11, 2006
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1157577088" name="NGAO_SD_System_Eng_Mgmt_Plan_v04.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v04.doc" size="480256" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Version 0.6, w/ color coding" date="1158047478" name="NGAO_SD_Team_Meetings_v_06.xls" path="NGAO_SD_Team_Meetings_v_06.xls" size="63488" user="Main.RichardDekany" version="1"
Line: 22 to 22
 
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 3" date="1156533867" name="NGAO_WBS_RGD_v_01_level_3.pdf" path="NGAO_WBS_RGD_v_01_level_3.pdf" size="36072" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 2" date="1156533845" name="NGAO_WBS_RGD_v_01_level_2.pdf" path="NGAO_WBS_RGD_v_01_level_2.pdf" size="22860" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Version 0.3" date="1155859522" name="NGAO_SD_Team_Meetings_v_03.xls" path="NGAO_SD_Team_Meetings_v_03.xls" size="63488" user="Main.RichardDekany" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept. 12, 2006" date="1158090082" name="NGAO_SD_System_Eng_Mgmt_Plan_v09.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v09.doc" size="1249792" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="revised - includes enties for real-time controller" date="1156545727" name="Keck_NGAO_WBS_Dictionary_(partial,_draft_8-25-06_rev1,_DG).pdf" path="Keck_NGAO_WBS_Dictionary_(partial,_draft_8-25-06_rev1,_DG).pdf" size="93422" user="Main.DonaldGavel" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan (9/12/06)" date="1158089961" name="NGAO_SD_schedule_v7.mpp" path="NGAO_SD_schedule_v7.mpp" size="449536" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Incorporating Peter's comments" date="1157657838" name="NGAO_SD_Team_Meetings_v_05.xls" path="NGAO_SD_Team_Meetings_v_05.xls" size="62976" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Suggestion for Work Breakdown Structure - in org-chart format" date="1156543102" name="WBS_Architecture_DG_Aug2506.pdf" path="WBS_Architecture_DG_Aug2506.pdf" size="16915" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Early draft, WBS structure unclear" date="1156449903" name="SD_phase_WBS_dictionary_v03.xls" path="SD_phase_WBS_dictionary_v03.xls" size="37376" user="Main.RichardDekany" version="1"

Revision 132006-09-12 - RichardDekany

Line: 1 to 1
 
META TOPICPARENT
This collection is for SD Phase Planning Documents
Line: 9 to 9
  * NGAO_SD_schedule_v6.mpp: Latest version of the project plan, from Peter Wizinowich, Aug 31, 2006 NGAO_SD_schedule_v6.pdf: (PDF)
Changed:
<
<
* NGAO_SD_Team_Meetings_v_04.xls: Latest schedule of meetings, from Rich Dekany, Aug 24, 2006

>
>
* NGAO_SD_Team_Meetings_v_06.xls: Latest schedule of meetings, from Rich Dekany, Sept 11, 2006
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1157577088" name="NGAO_SD_System_Eng_Mgmt_Plan_v04.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v04.doc" size="480256" user="Main.DonaldGavel" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Version 0.6, w/ color coding" date="1158047478" name="NGAO_SD_Team_Meetings_v_06.xls" path="NGAO_SD_Team_Meetings_v_06.xls" size="63488" user="Main.RichardDekany" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept 7, 2006" date="1157660734" name="NGAO_SD_System_Eng_Mgmt_Plan_v05.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v05.doc" size="559616" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="(PDF form of above)" date="1157577901" name="NGAO_SD_schedule_v6.pdf" path="NGAO_SD_schedule_v6.pdf" size="58177" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Org chart as of Sept 7, 2006" date="1157660777" name="NGAO_SD_org_chart.vsd" path="NGAO_SD_org_chart.vsd" size="113664" user="Main.DonaldGavel" version="1"

Revision 122006-09-11 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT
This collection is for SD Phase Planning Documents

* SD Phase WBS Dictionary Assignments

Deleted:
<
<
* NGAO_SD_System_Eng_Mgmt_Plan_v05.doc: Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept 7, 2006
  * NGAO_SD_schedule_v6.mpp: Latest version of the project plan, from Peter Wizinowich, Aug 31, 2006 NGAO_SD_schedule_v6.pdf: (PDF)
Line: 14 to 13
 
Deleted:
<
<
* NGAO_SD_org_chart.vsd: NGAO Org chart as of Sept 7, 2006
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1157577088" name="NGAO_SD_System_Eng_Mgmt_Plan_v04.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v04.doc" size="480256" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept 7, 2006" date="1157660734" name="NGAO_SD_System_Eng_Mgmt_Plan_v05.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v05.doc" size="559616" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="(PDF form of above)" date="1157577901" name="NGAO_SD_schedule_v6.pdf" path="NGAO_SD_schedule_v6.pdf" size="58177" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Org chart as of Sept 7, 2006" date="1157660777" name="NGAO_SD_org_chart.vsd" path="NGAO_SD_org_chart.vsd" size="113664" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 6" date="1156533887" name="NGAO_WBS_RGD_v_01_level_6.pdf" path="NGAO_WBS_RGD_v_01_level_6.pdf" size="46247" user="Main.RichardDekany" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept 11, 2006" date="1158006879" name="NGAO_SD_System_Eng_Mgmt_Plan_v08.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v08.doc" size="1090560" user="Main.PeterWizinowich" version="2"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan" date="1157577832" name="NGAO_SD_schedule_v6.mpp" path="NGAO_SD_schedule_v6.mpp" size="262656" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 3" date="1156533867" name="NGAO_WBS_RGD_v_01_level_3.pdf" path="NGAO_WBS_RGD_v_01_level_3.pdf" size="36072" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 2" date="1156533845" name="NGAO_WBS_RGD_v_01_level_2.pdf" path="NGAO_WBS_RGD_v_01_level_2.pdf" size="22860" user="Main.RichardDekany" version="1"

Revision 112006-09-07 - DonaldGavel

Line: 1 to 1
 
META TOPICPARENT
This collection is for SD Phase Planning Documents

* SD Phase WBS Dictionary Assignments

Changed:
<
<
* NGAO_SD_System_Eng_Mgmt_Plan_v04.doc: Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Aug 30, 2006
>
>
* NGAO_SD_System_Eng_Mgmt_Plan_v05.doc: Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept 7, 2006
  * NGAO_SD_schedule_v6.mpp: Latest version of the project plan, from Peter Wizinowich, Aug 31, 2006 NGAO_SD_schedule_v6.pdf: (PDF)
Line: 14 to 13
  * NGAO_SD_Team_Meetings_v_04.xls: Latest schedule of meetings, from Rich Dekany, Aug 24, 2006
Added:
>
>
* NGAO_SD_org_chart.vsd: NGAO Org chart as of Sept 7, 2006
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1157577088" name="NGAO_SD_System_Eng_Mgmt_Plan_v04.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v04.doc" size="480256" user="Main.DonaldGavel" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Sept 7, 2006" date="1157660734" name="NGAO_SD_System_Eng_Mgmt_Plan_v05.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v05.doc" size="559616" user="Main.DonaldGavel" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="(PDF form of above)" date="1157577901" name="NGAO_SD_schedule_v6.pdf" path="NGAO_SD_schedule_v6.pdf" size="58177" user="Main.DonaldGavel" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Org chart as of Sept 7, 2006" date="1157660777" name="NGAO_SD_org_chart.vsd" path="NGAO_SD_org_chart.vsd" size="113664" user="Main.DonaldGavel" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 6" date="1156533887" name="NGAO_WBS_RGD_v_01_level_6.pdf" path="NGAO_WBS_RGD_v_01_level_6.pdf" size="46247" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan" date="1157577832" name="NGAO_SD_schedule_v6.mpp" path="NGAO_SD_schedule_v6.mpp" size="262656" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 3" date="1156533867" name="NGAO_WBS_RGD_v_01_level_3.pdf" path="NGAO_WBS_RGD_v_01_level_3.pdf" size="36072" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 2" date="1156533845" name="NGAO_WBS_RGD_v_01_level_2.pdf" path="NGAO_WBS_RGD_v_01_level_2.pdf" size="22860" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Version 0.3" date="1155859522" name="NGAO_SD_Team_Meetings_v_03.xls" path="NGAO_SD_Team_Meetings_v_03.xls" size="63488" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="revised - includes enties for real-time controller" date="1156545727" name="Keck_NGAO_WBS_Dictionary_(partial,_draft_8-25-06_rev1,_DG).pdf" path="Keck_NGAO_WBS_Dictionary_(partial,_draft_8-25-06_rev1,_DG).pdf" size="93422" user="Main.DonaldGavel" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Incorporating Peter's comments" date="1157657838" name="NGAO_SD_Team_Meetings_v_05.xls" path="NGAO_SD_Team_Meetings_v_05.xls" size="62976" user="Main.RichardDekany" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Suggestion for Work Breakdown Structure - in org-chart format" date="1156543102" name="WBS_Architecture_DG_Aug2506.pdf" path="WBS_Architecture_DG_Aug2506.pdf" size="16915" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Early draft, WBS structure unclear" date="1156449903" name="SD_phase_WBS_dictionary_v03.xls" path="SD_phase_WBS_dictionary_v03.xls" size="37376" user="Main.RichardDekany" version="1"
Deleted:
<
<
META FILEATTACHMENT attachment="NGAO_SD_Team_Meetings_v_05.xls" attr="" comment="Incorporating Peter's comments" date="1157657838" name="NGAO_SD_Team_Meetings_v_05.xls" path="NGAO SD Team Meetings v_05.xls" size="62976" stream="NGAO SD Team Meetings v_05.xls" user="Main.RichardDekany" version="1"

Revision 102006-09-07 - RichardDekany

Line: 1 to 1
 
META TOPICPARENT
This collection is for SD Phase Planning Documents
Line: 17 to 17
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1157577088" name="NGAO_SD_System_Eng_Mgmt_Plan_v04.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v04.doc" size="480256" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="(PDF form of above)" date="1157577901" name="NGAO_SD_schedule_v6.pdf" path="NGAO_SD_schedule_v6.pdf" size="58177" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 6" date="1156533887" name="NGAO_WBS_RGD_v_01_level_6.pdf" path="NGAO_WBS_RGD_v_01_level_6.pdf" size="46247" user="Main.RichardDekany" version="1"
Deleted:
<
<
META FILEATTACHMENT attr="" autoattached="1" comment="Version 0.4, w/ trade stdy's after perf bdgts" date="1156444786" name="NGAO_SD_Team_Meetings_v_04.xls" path="NGAO_SD_Team_Meetings_v_04.xls" size="62976" user="Main.RichardDekany" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan" date="1157577832" name="NGAO_SD_schedule_v6.mpp" path="NGAO_SD_schedule_v6.mpp" size="262656" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 3" date="1156533867" name="NGAO_WBS_RGD_v_01_level_3.pdf" path="NGAO_WBS_RGD_v_01_level_3.pdf" size="36072" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 2" date="1156533845" name="NGAO_WBS_RGD_v_01_level_2.pdf" path="NGAO_WBS_RGD_v_01_level_2.pdf" size="22860" user="Main.RichardDekany" version="1"
Line: 25 to 24
 
META FILEATTACHMENT attr="" autoattached="1" comment="revised - includes enties for real-time controller" date="1156545727" name="Keck_NGAO_WBS_Dictionary_(partial,_draft_8-25-06_rev1,_DG).pdf" path="Keck_NGAO_WBS_Dictionary_(partial,_draft_8-25-06_rev1,_DG).pdf" size="93422" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Suggestion for Work Breakdown Structure - in org-chart format" date="1156543102" name="WBS_Architecture_DG_Aug2506.pdf" path="WBS_Architecture_DG_Aug2506.pdf" size="16915" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Early draft, WBS structure unclear" date="1156449903" name="SD_phase_WBS_dictionary_v03.xls" path="SD_phase_WBS_dictionary_v03.xls" size="37376" user="Main.RichardDekany" version="1"
Added:
>
>
META FILEATTACHMENT attachment="NGAO_SD_Team_Meetings_v_05.xls" attr="" comment="Incorporating Peter's comments" date="1157657838" name="NGAO_SD_Team_Meetings_v_05.xls" path="NGAO SD Team Meetings v_05.xls" size="62976" stream="NGAO SD Team Meetings v_05.xls" user="Main.RichardDekany" version="1"

Revision 92006-09-06 - DonaldGavel

Line: 1 to 1
 
META TOPICPARENT
This collection is for SD Phase Planning Documents
Changed:
<
<
SD Phase WBS Dictionary Assignments
>
>
* SD Phase WBS Dictionary Assignments

* NGAO_SD_System_Eng_Mgmt_Plan_v04.doc: Latest version of System Engineering Management Plan (SEMP), from Peter Wizinowich, Aug 30, 2006

* NGAO_SD_schedule_v6.mpp: Latest version of the project plan, from Peter Wizinowich, Aug 31, 2006 NGAO_SD_schedule_v6.pdf: (PDF)

* NGAO_SD_Team_Meetings_v_04.xls: Latest schedule of meetings, from Rich Dekany, Aug 24, 2006

META FILEATTACHMENT attr="" autoattached="1" comment="" date="1157577088" name="NGAO_SD_System_Eng_Mgmt_Plan_v04.doc" path="NGAO_SD_System_Eng_Mgmt_Plan_v04.doc" size="480256" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="(PDF form of above)" date="1157577901" name="NGAO_SD_schedule_v6.pdf" path="NGAO_SD_schedule_v6.pdf" size="58177" user="Main.DonaldGavel" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 6" date="1156533887" name="NGAO_WBS_RGD_v_01_level_6.pdf" path="NGAO_WBS_RGD_v_01_level_6.pdf" size="46247" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Version 0.4, w/ trade stdy's after perf bdgts" date="1156444786" name="NGAO_SD_Team_Meetings_v_04.xls" path="NGAO_SD_Team_Meetings_v_04.xls" size="62976" user="Main.RichardDekany" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Latest version of the project plan" date="1157577832" name="NGAO_SD_schedule_v6.mpp" path="NGAO_SD_schedule_v6.mpp" size="262656" user="Main.DonaldGavel" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 3" date="1156533867" name="NGAO_WBS_RGD_v_01_level_3.pdf" path="NGAO_WBS_RGD_v_01_level_3.pdf" size="36072" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 2" date="1156533845" name="NGAO_WBS_RGD_v_01_level_2.pdf" path="NGAO_WBS_RGD_v_01_level_2.pdf" size="22860" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Version 0.3" date="1155859522" name="NGAO_SD_Team_Meetings_v_03.xls" path="NGAO_SD_Team_Meetings_v_03.xls" size="63488" user="Main.RichardDekany" version="1"

Revision 82006-08-31 - RichardDekany

Line: 1 to 1
 
META TOPICPARENT
This collection is for SD Phase Planning Documents
Added:
>
>
SD Phase WBS Dictionary Assignments
 
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 6" date="1156533887" name="NGAO_WBS_RGD_v_01_level_6.pdf" path="NGAO_WBS_RGD_v_01_level_6.pdf" size="46247" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Version 0.4, w/ trade stdy's after perf bdgts" date="1156444786" name="NGAO_SD_Team_Meetings_v_04.xls" path="NGAO_SD_Team_Meetings_v_04.xls" size="62976" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 3" date="1156533867" name="NGAO_WBS_RGD_v_01_level_3.pdf" path="NGAO_WBS_RGD_v_01_level_3.pdf" size="36072" user="Main.RichardDekany" version="1"

Revision 72006-08-25 - DonaldGavel

Line: 1 to 1
Changed:
<
<
META TOPICPARENT name="WebHome"
>
>
META TOPICPARENT
 This collection is for SD Phase Planning Documents
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 6" date="1156533887" name="NGAO_WBS_RGD_v_01_level_6.pdf" path="NGAO_WBS_RGD_v_01_level_6.pdf" size="46247" user="Main.RichardDekany" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Version 0.4, w/ trade stdy's after perf bdgts" date="1156444786" name="NGAO_SD_Team_Meetings_v_04.xls" path="NGAO_SD_Team_Meetings_v_04.xls" size="62976" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 3" date="1156533867" name="NGAO_WBS_RGD_v_01_level_3.pdf" path="NGAO_WBS_RGD_v_01_level_3.pdf" size="36072" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 2" date="1156533845" name="NGAO_WBS_RGD_v_01_level_2.pdf" path="NGAO_WBS_RGD_v_01_level_2.pdf" size="22860" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Version 0.3" date="1155859522" name="NGAO_SD_Team_Meetings_v_03.xls" path="NGAO_SD_Team_Meetings_v_03.xls" size="63488" user="Main.RichardDekany" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="revised - includes enties for real-time controller" date="1156545727" name="Keck_NGAO_WBS_Dictionary_(partial,_draft_8-25-06_rev1,_DG).pdf" path="Keck_NGAO_WBS_Dictionary_(partial,_draft_8-25-06_rev1,_DG).pdf" size="93422" user="Main.DonaldGavel" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Suggestion for Work Breakdown Structure - in org-chart format" date="1156543102" name="WBS_Architecture_DG_Aug2506.pdf" path="WBS_Architecture_DG_Aug2506.pdf" size="16915" user="Main.DonaldGavel" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Early draft, WBS structure unclear" date="1156449903" name="SD_phase_WBS_dictionary_v03.xls" path="SD_phase_WBS_dictionary_v03.xls" size="37376" user="Main.RichardDekany" version="1"
Deleted:
<
<
META FILEATTACHMENT attachment="NGAO_WBS_RGD_v_01_level_6.pdf" attr="" comment="WBS to Level 6" date="1156533887" name="NGAO_WBS_RGD_v_01_level_6.pdf" path="NGAO WBS RGD v_01_level_6.pdf" size="46247" stream="NGAO WBS RGD v_01_level_6.pdf" user="Main.RichardDekany" version="1"

Revision 62006-08-25 - RichardDekany

Line: 1 to 1
 
META TOPICPARENT name="WebHome"
This collection is for SD Phase Planning Documents

META FILEATTACHMENT attr="" autoattached="1" comment="Version 0.4, w/ trade stdy's after perf bdgts" date="1156444786" name="NGAO_SD_Team_Meetings_v_04.xls" path="NGAO_SD_Team_Meetings_v_04.xls" size="62976" user="Main.RichardDekany" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 3" date="1156533867" name="NGAO_WBS_RGD_v_01_level_3.pdf" path="NGAO_WBS_RGD_v_01_level_3.pdf" size="36072" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="WBS to Level 2" date="1156533845" name="NGAO_WBS_RGD_v_01_level_2.pdf" path="NGAO_WBS_RGD_v_01_level_2.pdf" size="22860" user="Main.RichardDekany" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Version 0.3" date="1155859522" name="NGAO_SD_Team_Meetings_v_03.xls" path="NGAO_SD_Team_Meetings_v_03.xls" size="63488" user="Main.RichardDekany" version="1"
Changed:
<
<
META FILEATTACHMENT attachment="SD_phase_WBS_dictionary_v03.xls" attr="" comment="Early draft, WBS structure unclear" date="1156449903" name="SD_phase_WBS_dictionary_v03.xls" path="SD_phase_WBS_dictionary_v03.xls" size="37376" stream="SD_phase_WBS_dictionary_v03.xls" user="Main.RichardDekany" version="1"
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Early draft, WBS structure unclear" date="1156449903" name="SD_phase_WBS_dictionary_v03.xls" path="SD_phase_WBS_dictionary_v03.xls" size="37376" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attachment="NGAO_WBS_RGD_v_01_level_6.pdf" attr="" comment="WBS to Level 6" date="1156533887" name="NGAO_WBS_RGD_v_01_level_6.pdf" path="NGAO WBS RGD v_01_level_6.pdf" size="46247" stream="NGAO WBS RGD v_01_level_6.pdf" user="Main.RichardDekany" version="1"

Revision 52006-08-24 - RichardDekany

Line: 1 to 1
 
META TOPICPARENT name="WebHome"
This collection is for SD Phase Planning Documents
Changed:
<
<
META FILEATTACHMENT attachment="NGAO_SD_Team_Meetings_v_03.xls" attr="" comment="Version 0.3" date="1155859521" name="NGAO_SD_Team_Meetings_v_03.xls" path="NGAO SD Team Meetings v_03.xls" size="63488" stream="NGAO SD Team Meetings v_03.xls" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attachment="NGAO_SD_Team_Meetings_v_04.xls" attr="" comment="Version 0.4, w/ trade stdy's after perf bdgts" date="1156444786" name="NGAO_SD_Team_Meetings_v_04.xls" path="NGAO SD Team Meetings v_04.xls" size="62976" stream="NGAO SD Team Meetings v_04.xls" user="Main.RichardDekany" version="1"
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Version 0.4, w/ trade stdy's after perf bdgts" date="1156444786" name="NGAO_SD_Team_Meetings_v_04.xls" path="NGAO_SD_Team_Meetings_v_04.xls" size="62976" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Version 0.3" date="1155859522" name="NGAO_SD_Team_Meetings_v_03.xls" path="NGAO_SD_Team_Meetings_v_03.xls" size="63488" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attachment="SD_phase_WBS_dictionary_v03.xls" attr="" comment="Early draft, WBS structure unclear" date="1156449903" name="SD_phase_WBS_dictionary_v03.xls" path="SD_phase_WBS_dictionary_v03.xls" size="37376" stream="SD_phase_WBS_dictionary_v03.xls" user="Main.RichardDekany" version="1"

Revision 42006-08-24 - RichardDekany

Line: 1 to 1
 
META TOPICPARENT name="WebHome"
This collection is for SD Phase Planning Documents

META FILEATTACHMENT attachment="NGAO_SD_Team_Meetings_v_03.xls" attr="" comment="Version 0.3" date="1155859521" name="NGAO_SD_Team_Meetings_v_03.xls" path="NGAO SD Team Meetings v_03.xls" size="63488" stream="NGAO SD Team Meetings v_03.xls" user="Main.RichardDekany" version="1"
Added:
>
>
META FILEATTACHMENT attachment="NGAO_SD_Team_Meetings_v_04.xls" attr="" comment="Version 0.4, w/ trade stdy's after perf bdgts" date="1156444786" name="NGAO_SD_Team_Meetings_v_04.xls" path="NGAO SD Team Meetings v_04.xls" size="62976" stream="NGAO SD Team Meetings v_04.xls" user="Main.RichardDekany" version="1"

Revision 32006-08-18 - RichardDekany

Line: 1 to 1
 
META TOPICPARENT name="WebHome"
This collection is for SD Phase Planning Documents
Changed:
<
<
META FILEATTACHMENT attachment="NGAO_SD_Team_Meetings_v2.xls" attr="" comment="Version 0.2" date="1155675806" name="NGAO_SD_Team_Meetings_v2.xls" path="NGAO SD Team Meetings v2.xls" size="62976" stream="NGAO SD Team Meetings v2.xls" user="Main.RichardDekany" version="1"
>
>
META FILEATTACHMENT attachment="NGAO_SD_Team_Meetings_v_03.xls" attr="" comment="Version 0.3" date="1155859521" name="NGAO_SD_Team_Meetings_v_03.xls" path="NGAO SD Team Meetings v_03.xls" size="63488" stream="NGAO SD Team Meetings v_03.xls" user="Main.RichardDekany" version="1"

Revision 22006-08-15 - RichardDekany

Line: 1 to 1
 
META TOPICPARENT name="WebHome"
This collection is for SD Phase Planning Documents
Changed:
<
<
META FILEATTACHMENT attachment="NGAO_SD_Team_Meetings.xls" attr="" comment="Version 0.1" date="1155605866" name="NGAO_SD_Team_Meetings.xls" path="NGAO SD Team Meetings.xls" size="50176" stream="NGAO SD Team Meetings.xls" user="Main.RichardDekany" version="1"
>
>
META FILEATTACHMENT attachment="NGAO_SD_Team_Meetings_v2.xls" attr="" comment="Version 0.2" date="1155675806" name="NGAO_SD_Team_Meetings_v2.xls" path="NGAO SD Team Meetings v2.xls" size="62976" stream="NGAO SD Team Meetings v2.xls" user="Main.RichardDekany" version="1"

Revision 12006-08-15 - RichardDekany

Line: 1 to 1
Added:
>
>
META TOPICPARENT name="WebHome"
This collection is for SD Phase Planning Documents

META FILEATTACHMENT attachment="NGAO_SD_Team_Meetings.xls" attr="" comment="Version 0.1" date="1155605866" name="NGAO_SD_Team_Meetings.xls" path="NGAO SD Team Meetings.xls" size="50176" stream="NGAO SD Team Meetings.xls" user="Main.RichardDekany" version="1"
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2020 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback