Difference: LaserPDRPhase (1 vs. 46)

Revision 462010-07-23 - EdWetherell

Line: 1 to 1
 
META TOPICPARENT name="WebHome"
NGAO Preliminary Design Phase
Line: 117 to 117
 

Other Supporting Documents

Changed:
<
<
>
>
 
META FILEATTACHMENT attachment="NGAO_Laser_to_Safety_System_Interface.pdf" attr="h" comment="" date="1234490284" name="NGAO_Laser_to_Safety_System_Interface.pdf" path="H:\NGAO\1.3.5.4 Safety System\NGAO Laser to Safety System Interface.pdf" size="120237" stream="H:\NGAO\1.3.5.4 Safety System\NGAO Laser to Safety System Interface.pdf" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_Safety_System_Interface.pdf" attr="h" comment="Safety System Interfaces" date="1234899396" name="NGAO_Safety_System_Interface.pdf" path="H:\NGAO\1.3.5.4 Safety System\NGAO Safety System Interface.pdf" size="423008" stream="H:\NGAO\1.3.5.4 Safety System\NGAO Safety System Interface.pdf" user="Main.JasonChin" version="2"
Line: 177 to 176
 
META FILEATTACHMENT attachment="NGAO_Monthly_Report_JC_2010_Mar.doc" attr="" comment="2010_03 Monthly Status Report" date="1273095612" name="NGAO_Monthly_Report_JC_2010_Mar.doc" path="NGAO Monthly Report JC 2010_Mar.doc" size="60928" stream="NGAO Monthly Report JC 2010_Mar.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_Monthly_Report_JC_2010_Apr.doc" attr="" comment="2010_04 Monthly Status Report" date="1273095628" name="NGAO_Monthly_Report_JC_2010_Apr.doc" path="NGAO Monthly Report JC 2010_Apr.doc" size="93184" stream="NGAO Monthly Report JC 2010_Apr.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_Lasers_WBS5_2_Plan_v1_1.mpp" attr="" comment="Laser Systems MS Project Plan" date="1273104836" name="NGAO_Lasers_WBS5_2_Plan_v1_1.mpp" path="NGAO Lasers WBS5_2 Plan v1_1x.mpp" size="339968" stream="NGAO Lasers WBS5_2 Plan v1_1x.mpp" user="Main.JasonChin" version="2"
Added:
>
>
META FILEATTACHMENT attachment="fiber_path.pdf" attr="h" comment="Description of measurement from Laser enclosure to AO e-vault" date="1279918034" name="fiber_path.pdf" path="fiber_path.pdf" size="2749564" stream="fiber_path.pdf" user="Main.EdWetherell" version="1"

Revision 452010-05-06 - JasonChin

Line: 1 to 1
 
META TOPICPARENT name="WebHome"
NGAO Preliminary Design Phase
Line: 42 to 42
 

WBS 3.5 Laser Guide Star Facility

Changed:
<
<
Laser System Control
>
>
 

WBS 3.5.1 Laser Enclosure

Line: 52 to 51
 

WBS 3.5.2 Laser Systems

Changed:
<
<
>
>
 

WBS 3.5.3 Laser Launch Facility

Line: 174 to 176
 
META FILEATTACHMENT attachment="NGAO_Monthly_Report_JC_2010_Feb.doc" attr="" comment="2010_02 Monthly Status Report" date="1273095578" name="NGAO_Monthly_Report_JC_2010_Feb.doc" path="NGAO Monthly Report JC 2010_Feb.doc" size="60928" stream="NGAO Monthly Report JC 2010_Feb.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_Monthly_Report_JC_2010_Mar.doc" attr="" comment="2010_03 Monthly Status Report" date="1273095612" name="NGAO_Monthly_Report_JC_2010_Mar.doc" path="NGAO Monthly Report JC 2010_Mar.doc" size="60928" stream="NGAO Monthly Report JC 2010_Mar.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_Monthly_Report_JC_2010_Apr.doc" attr="" comment="2010_04 Monthly Status Report" date="1273095628" name="NGAO_Monthly_Report_JC_2010_Apr.doc" path="NGAO Monthly Report JC 2010_Apr.doc" size="93184" stream="NGAO Monthly Report JC 2010_Apr.doc" user="Main.JasonChin" version="1"
Added:
>
>
META FILEATTACHMENT attachment="NGAO_Lasers_WBS5_2_Plan_v1_1.mpp" attr="" comment="Laser Systems MS Project Plan" date="1273104836" name="NGAO_Lasers_WBS5_2_Plan_v1_1.mpp" path="NGAO Lasers WBS5_2 Plan v1_1x.mpp" size="339968" stream="NGAO Lasers WBS5_2 Plan v1_1x.mpp" user="Main.JasonChin" version="2"

Revision 442010-05-05 - JasonChin

Line: 1 to 1
 
META TOPICPARENT name="WebHome"
NGAO Preliminary Design Phase

-- Main.Jason Chin - Originated 09 February 2009

Changed:
<
<

Laser System Design Effort (WBS 3.5 & 3.8), Preliminary Design Phase

>
>

Laser Guide Star Facility Preliminary Design Phase (WBS 3.5) and related summit activities (WBS 3.8.2, WBS 3.8.5, WBS 9.1, WBS 9.4)

 
Line: 22 to 22
 
Added:
>
>
 

Reviews

Line: 35 to 40
 

WBS 3.3.6 Internal Interfaces

Deleted:
<
<

WBS 3.5 Laser System Design

 
Changed:
<
<

WBS 3.5.1 Laser Enclosure

Preliminary Design Phase
>
>

WBS 3.5 Laser Guide Star Facility

Laser System Control
 
Changed:
<
<
>
>

WBS 3.5.1 Laser Enclosure

 
Added:
>
>
 
Changed:
<
<

WBS 3.5.2 Laser

Preliminary Design Phase
>
>

WBS 3.5.2 Laser Systems

 
Changed:
<
<

WBS 3.5.3 Laser Launch Facility

>
>

WBS 3.5.3 Laser Launch Facility

 
Line: 72 to 76
 Infrastructure
Changed:
<
<

WBS 3.5.4 Safety System Design

>
>

WBS 3.5.4 Safety System

Safety System Controller
 
Line: 87 to 93
  Laser Clearing House
Deleted:
<
<
 
Changed:
<
<

WBS 3.5.5 Laser System Control

>
>

WBS 3.8 Telescope & Summit Engineering

WBS 3.8.2 Infrastructure Modifications for Laser System

 
Deleted:
<
<

WBS 1.3.5.5.1 Laser System Control Software

 
Changed:
<
<

WBS 3.8 Telescope integration & Test

>
>

WBS 3.8.2 Common Infrastructure Modifications

 
Changed:
<
<

WBS 3.8.1.2 K2 Laser Removal

>
>

WBS 3.9 Telescope integration & Test

WBS 3.9.1 K2 Laser Removal

 
Added:
>
>

WBS 3.9.4 LGSF Installation and I&T

 

WBS 3.10 Operations Handover

Line: 124 to 124
 
META FILEATTACHMENT attachment="NGAO_Safety_System_Interlocks_v1_0.pdf" attr="h" comment="Safety System Interlocks" date="1234908165" name="NGAO_Safety_System_Interlocks_v1_0.pdf" path="H:\NGAO\1.3.5.4 Safety System\NGAO Safety System Interlocks v1_0.pdf" size="19894" stream="H:\NGAO\1.3.5.4 Safety System\NGAO Safety System Interlocks v1_0.pdf" user="Main.JasonChin" version="2"
META FILEATTACHMENT attachment="LaserSystemControlSequencer.doc" attr="h" comment="Laser System Control Sequencer" date="1235529810" name="LaserSystemControlSequencer.doc" path="T:\NGAO\3.3.6 Laser Control System\LaserSystemControlSequencer.doc" size="548352" stream="T:\NGAO\3.3.6 Laser Control System\LaserSystemControlSequencer.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="LaserSystemControlSequencer.pdf" attr="h" comment="Laser System Control Sequencers" date="1235529931" name="LaserSystemControlSequencer.pdf" path="T:\NGAO\3.3.6 Laser Control System\LaserSystemControlSequencer.pdf" size="227368" stream="T:\NGAO\3.3.6 Laser Control System\LaserSystemControlSequencer.pdf" user="Main.JasonChin" version="1"
Deleted:
<
<
META FILEATTACHMENT attachment="Laser_Enclosure_Requirements_Review.doc" attr="h" comment="Review of Laser Enclosure Requirement PD Phase" date="1235612429" name="Laser_Enclosure_Requirements_Review.doc" path="T:\NGAO\3.3.2 Enclosure\Laser Enclosure Requirements Review.doc" size="522752" stream="T:\NGAO\3.3.2 Enclosure\Laser Enclosure Requirements Review.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="Laser_Enclosure_Requirements_Review.pdf" attr="h" comment="Laser Enclosure Requirements Review PD Phase" date="1235615627" name="Laser_Enclosure_Requirements_Review.pdf" path="T:\NGAO\3.3.2 Enclosure\Laser Enclosure Requirements Review.pdf" size="375572" stream="T:\NGAO\3.3.2 Enclosure\Laser Enclosure Requirements Review.pdf" user="Main.JasonChin" version="3"
 
META FILEATTACHMENT attachment="NGAO_Safety_System_Shutters.pdf" attr="" comment="Description of Safety Shutter Layout for NGAO Safety System" date="1236369626" name="NGAO_Safety_System_Shutters.pdf" path="T:\NGAO\1.3.5.4 Safety System\NGAO Safety System Shutters.pdf" size="170823" stream="T:\NGAO\1.3.5.4 Safety System\NGAO Safety System Shutters.pdf" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_F-15_Module_LLF_Supports_Installation_Plan.pdf" attr="h" comment="F/15 Module Supports Installation Plan" date="1236394117" name="NGAO_F-15_Module_LLF_Supports_Installation_Plan.pdf" path="T:\NGAO\1.3.5.3 Laser Launch Facility\NGAO F-15 Module LLF Supports Installation Plan.pdf" size="38176" stream="T:\NGAO\1.3.5.3 Laser Launch Facility\NGAO F-15 Module LLF Supports Installation Plan.pdf" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_LLF_constraints_at_Prime_Focus.pdf" attr="h" comment="Laser Launch Facility Constraints at Prime Focus" date="1236394144" name="NGAO_LLF_constraints_at_Prime_Focus.pdf" path="T:\NGAO\1.3.5.3 Laser Launch Facility\NGAO LLF constraints at Prime Focus.pdf" size="229021" stream="T:\NGAO\1.3.5.3 Laser Launch Facility\NGAO LLF constraints at Prime Focus.pdf" user="Main.JasonChin" version="1"
Line: 166 to 164
 
META FILEATTACHMENT attachment="Keck_Appendix_A_to_Standard_CPA_Plan_11-25-09.pdf" attr="" comment="Keck Centralized Predictive Avoidance Plan" date="1270855125" name="Keck_Appendix_A_to_Standard_CPA_Plan_11-25-09.pdf" path="Keck_Appendix A to Standard_CPA_Plan_11-25-09.pdf" size="2129348" stream="Keck_Appendix A to Standard_CPA_Plan_11-25-09.pdf" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="LE_Requirements_and_Compliance.xls" attr="" comment="Laser Enclosure Requirements and Compliance" date="1271130824" name="LE_Requirements_and_Compliance.xls" path="LE Requirements and Compliance.xls" size="45568" stream="LE Requirements and Compliance.xls" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_LGSF_Laser_Enclosure_PDv1_0.doc" attr="" comment="Laser Enclosure PDR Design Document" date="1271131001" name="NGAO_LGSF_Laser_Enclosure_PDv1_0.doc" path="NGAO LGSF Laser Enclosure PDv1_0.doc" size="1829376" stream="NGAO LGSF Laser Enclosure PDv1_0.doc" user="Main.JasonChin" version="1"
Changed:
<
<
META FILEATTACHMENT attachment="NGAO_LGSF_LE_DD_v1_0.mpp" attr="" comment="Laser Enclosure PDR MS Project" date="1271131028" name="NGAO_LGSF_LE_DD_v1_0.mpp" path="NGAO LGSF LE DD v1_0.mpp" size="323072" stream="NGAO LGSF LE DD v1_0.mpp" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="LE_Effort_Estimates.xls" attr="" comment="Laser Enclosure PDR Labor Estimates" date="1271131079" name="LE_Effort_Estimates.xls" path="LE Effort Estimates.xls" size="20480" stream="LE Effort Estimates.xls" user="Main.JasonChin" version="1"
>
>
META FILEATTACHMENT attachment="NGAO_LGSF_LE_DD_v1_0.mpp" attr="" comment="Laser Enclosure MS Project Plan" date="1273097281" name="NGAO_LGSF_LE_DD_v1_0.mpp" path="NGAO LGSF LE WBS5.1 Plan v1_0.mpp" size="419840" stream="NGAO LGSF LE WBS5.1 Plan v1_0.mpp" user="Main.JasonChin" version="2"
META FILEATTACHMENT attachment="LE_Effort_Estimates.xls" attr="" comment="Laser Enclosure Labor Estimates" date="1273097120" name="LE_Effort_Estimates.xls" path="NGAO LGSF LE WBS5.1 Estimates v1_0.xls" size="40960" stream="NGAO LGSF LE WBS5.1 Estimates v1_0.xls" user="Main.JasonChin" version="2"
 
META FILEATTACHMENT attachment="K2_Laser_Removal_Plan_v1_0.pdf" attr="" comment="K2 Laser Removal Plan" date="1271644076" name="K2_Laser_Removal_Plan_v1_0.pdf" path="K2 Laser Removal Plan v1_0.pdf" size="302649" stream="K2 Laser Removal Plan v1_0.pdf" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="K2_Laser_Removal_Estimates.xls" attr="" comment="K2 Laser Removal Estimates" date="1271644093" name="K2_Laser_Removal_Estimates.xls" path="K2 Laser Removal Estimates.xls" size="17408" stream="K2 Laser Removal Estimates.xls" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="K2_Laser_Removal_v1.mpp" attr="" comment="K2 Laser Removal MS Project Plan" date="1271644125" name="K2_Laser_Removal_v1.mpp" path="K2 Laser Removal v1.mpp" size="259072" stream="K2 Laser Removal v1.mpp" user="Main.JasonChin" version="1"
Added:
>
>
META FILEATTACHMENT attachment="NGAO_Monthly_Report_JC_2009_Nov.doc" attr="" comment="November 2009 Monthly Report" date="1273095471" name="NGAO_Monthly_Report_JC_2009_Nov.doc" path="NGAO Monthly Report JC 2009_Nov.doc" size="59904" stream="NGAO Monthly Report JC 2009_Nov.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_Monthly_Report_JC_2010_Jan.doc" attr="" comment="2010 01 Monthly Status Report" date="1273095539" name="NGAO_Monthly_Report_JC_2010_Jan.doc" path="NGAO Monthly Report JC 2010_Jan.doc" size="59904" stream="NGAO Monthly Report JC 2010_Jan.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_Monthly_Report_JC_2010_Feb.doc" attr="" comment="2010_02 Monthly Status Report" date="1273095578" name="NGAO_Monthly_Report_JC_2010_Feb.doc" path="NGAO Monthly Report JC 2010_Feb.doc" size="60928" stream="NGAO Monthly Report JC 2010_Feb.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_Monthly_Report_JC_2010_Mar.doc" attr="" comment="2010_03 Monthly Status Report" date="1273095612" name="NGAO_Monthly_Report_JC_2010_Mar.doc" path="NGAO Monthly Report JC 2010_Mar.doc" size="60928" stream="NGAO Monthly Report JC 2010_Mar.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_Monthly_Report_JC_2010_Apr.doc" attr="" comment="2010_04 Monthly Status Report" date="1273095628" name="NGAO_Monthly_Report_JC_2010_Apr.doc" path="NGAO Monthly Report JC 2010_Apr.doc" size="93184" stream="NGAO Monthly Report JC 2010_Apr.doc" user="Main.JasonChin" version="1"

Revision 432010-05-05 - JasonChin

Line: 1 to 1
 
META TOPICPARENT name="WebHome"
NGAO Preliminary Design Phase
Line: 44 to 44
 
Added:
>
>
 

WBS 3.5.2 Laser

Preliminary Design Phase

Revision 422010-04-19 - JasonChin

Line: 1 to 1
 
META TOPICPARENT name="WebHome"
NGAO Preliminary Design Phase
Line: 86 to 86
  Laser Clearing House
Changed:
<
<
>
>
 

WBS 3.5.5 Laser System Control

Line: 97 to 97
 

WBS 3.8 Telescope integration & Test

WBS 3.8.1.2 K2 Laser Removal

Changed:
<
<
>
>
 

WBS 3.10 Operations Handover

Line: 115 to 116
 
Changed:
<
<
META FILEATTACHMENT attachment="K2_Laser_Removal_Plan.doc" attr="h" comment="Word Document describing tasks associated with removing the K2 laser" date="1234310927" name="K2_Laser_Removal_Plan.doc" path="H:\NGAO\K2 Laser Removal Plan.doc" size="3721728" stream="H:\NGAO\K2 Laser Removal Plan.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="K2_Laser_Removal_v1.mpp" attr="h" comment="Project Plan associated with removing the K2 laser" date="1243971145" name="K2_Laser_Removal_v1.mpp" path="N:\3.9 Integration and Test\K2 Laser Removal v1 entirety.mpp" size="271872" stream="N:\3.9 Integration and Test\K2 Laser Removal v1 entirety.mpp" user="Main.JasonChin" version="2"
>
>
 
META FILEATTACHMENT attachment="NGAO_Laser_to_Safety_System_Interface.pdf" attr="h" comment="" date="1234490284" name="NGAO_Laser_to_Safety_System_Interface.pdf" path="H:\NGAO\1.3.5.4 Safety System\NGAO Laser to Safety System Interface.pdf" size="120237" stream="H:\NGAO\1.3.5.4 Safety System\NGAO Laser to Safety System Interface.pdf" user="Main.JasonChin" version="1"
Deleted:
<
<
META FILEATTACHMENT attachment="K2_Laser_Removal_Plan.pdf" attr="h" comment="" date="1243971400" name="K2_Laser_Removal_Plan.pdf" path="N:\3.9 Integration and Test\K2 Laser Removal Plan v1_1.pdf" size="287212" stream="N:\3.9 Integration and Test\K2 Laser Removal Plan v1_1.pdf" user="Main.JasonChin" version="2"
 
META FILEATTACHMENT attachment="NGAO_Safety_System_Interface.pdf" attr="h" comment="Safety System Interfaces" date="1234899396" name="NGAO_Safety_System_Interface.pdf" path="H:\NGAO\1.3.5.4 Safety System\NGAO Safety System Interface.pdf" size="423008" stream="H:\NGAO\1.3.5.4 Safety System\NGAO Safety System Interface.pdf" user="Main.JasonChin" version="2"
META FILEATTACHMENT attachment="NGAO_Safety_System_Interface_Signals_v1_0.pdf" attr="h" comment="Spreadsheet of Safety System Signals" date="1241121284" name="NGAO_Safety_System_Interface_Signals_v1_0.pdf" path="H:\NGAO\3.3.5 Laser Safety System\13x-xx-xx_Safety System ICD.pdf" size="20248" stream="H:\NGAO\3.3.5 Laser Safety System\13x-xx-xx_Safety System ICD.pdf" user="Main.JasonChin" version="2"
META FILEATTACHMENT attachment="NGAO_Safety_System_Interlocks_v1_0.pdf" attr="h" comment="Safety System Interlocks" date="1234908165" name="NGAO_Safety_System_Interlocks_v1_0.pdf" path="H:\NGAO\1.3.5.4 Safety System\NGAO Safety System Interlocks v1_0.pdf" size="19894" stream="H:\NGAO\1.3.5.4 Safety System\NGAO Safety System Interlocks v1_0.pdf" user="Main.JasonChin" version="2"
Line: 136 to 135
 
META FILEATTACHMENT attachment="NGAO_LGSF_Training.doc" attr="" comment="Laser Guide Star Facility Training" date="1241813452" name="NGAO_LGSF_Training.doc" path="N:\3.10 Operations Transition\NGAO LGSF Training.doc" size="322560" stream="N:\3.10 Operations Transition\NGAO LGSF Training.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_AO_to_LGSF_ICD_v1.doc" attr="h" comment="Adaptive Optics System to LGSF ICD" date="1242183475" name="NGAO_AO_to_LGSF_ICD_v1.doc" path="N:\3.3.6 Internal Interface\NGAO AO to LGSF ICD v1.doc" size="398848" stream="N:\3.3.6 Internal Interface\NGAO AO to LGSF ICD v1.doc" user="Main.JasonChin" version="3"
META FILEATTACHMENT attachment="NGAO_Operations_Transition_Handover_Criteria.doc" attr="" comment="Operations Transition Success Criteria" date="1241813553" name="NGAO_Operations_Transition_Handover_Criteria.doc" path="N:\3.10 Operations Transition\NGAO Operations Transition Handover Criteria.doc" size="166400" stream="N:\3.10 Operations Transition\NGAO Operations Transition Handover Criteria.doc" user="Main.JasonChin" version="1"
Changed:
<
<
META FILEATTACHMENT attachment="NGAO_LTCS_Modification_Preliiminary_Design_DS.doc" attr="h" comment="LTCS Modifications Preliminary Design" date="1270857788" name="NGAO_LTCS_Modification_Preliiminary_Design_DS.doc" path="NGAO LTCS Modification Preliiminary Design v_1.doc" size="200192" stream="NGAO LTCS Modification Preliiminary Design v_1.doc" user="Main.JasonChin" version="2"
>
>
META FILEATTACHMENT attachment="NGAO_LTCS_Modification_Preliiminary_Design_DS.doc" attr="h" comment="LTCS Modifications Preliminary Design" date="1271641055" name="NGAO_LTCS_Modification_Preliiminary_Design_DS.doc" path="NGAO LTCS Modification Preliiminary Design v_1_0.doc" size="195584" stream="NGAO LTCS Modification Preliiminary Design v_1_0.doc" user="Main.JasonChin" version="3"
 
META FILEATTACHMENT attachment="NGAO_Telescope_to_LGSF_ICD_v1.doc" attr="h" comment="Telescope to LGSF ICD" date="1242183410" name="NGAO_Telescope_to_LGSF_ICD_v1.doc" path="N:\3.3.6 Internal Interface\NGAO Telescope to LGSF ICD v1.doc" size="233984" stream="N:\3.3.6 Internal Interface\NGAO Telescope to LGSF ICD v1.doc" user="Main.JasonChin" version="2"
META FILEATTACHMENT attachment="NGAO_Guider_to_LGSF_ICD_v1.doc" attr="h" comment="NGAO Acquisition Guider System to LGSF ICD" date="1242183515" name="NGAO_Guider_to_LGSF_ICD_v1.doc" path="N:\3.3.6 Internal Interface\NGAO Guider to LGSF ICD v1.doc" size="291840" stream="N:\3.3.6 Internal Interface\NGAO Guider to LGSF ICD v1.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_Safety_System_Test_Plan.doc" attr="h" comment="Laser Safety System Test Plan" date="1242238265" name="NGAO_Safety_System_Test_Plan.doc" path="N:\3.5.4 Laser Safety System\NGAO Safety System Test Plan.doc" size="291840" stream="N:\3.5.4 Laser Safety System\NGAO Safety System Test Plan.doc" user="Main.JasonChin" version="1"
Line: 163 to 162
 
META FILEATTACHMENT attachment="NGAO_Monthly_Report_JC_2009_Aug.doc" attr="h" comment="2009_08 Monthly Status Report" date="1257197009" name="NGAO_Monthly_Report_JC_2009_Aug.doc" path="NGAO Monthly Report JC 2009_Aug.doc" size="58368" stream="NGAO Monthly Report JC 2009_Aug.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_Monthly_Report_JC_2009_Sep.doc" attr="h" comment="2009_09 Monthly Status Report" date="1257197030" name="NGAO_Monthly_Report_JC_2009_Sep.doc" path="NGAO Monthly Report JC 2009_Sep.doc" size="59392" stream="NGAO Monthly Report JC 2009_Sep.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_Monthly_Report_JC_2009_Oct.doc" attr="h" comment="2009_10 Monthly Status Report" date="1257385064" name="NGAO_Monthly_Report_JC_2009_Oct.doc" path="NGAO Monthly Report JC 2009_Oct.doc" size="59392" stream="NGAO Monthly Report JC 2009_Oct.doc" user="Main.JasonChin" version="2"
Deleted:
<
<
META FILEATTACHMENT attachment="NGAO_Laser_Clearing_House_Planning_Draft_Submission.doc" attr="" comment="NGAO Draft Submission for the LCH" date="1270855046" name="NGAO_Laser_Clearing_House_Planning_Draft_Submission.doc" path="NGAO Laser Clearing House Planning Draft Submission.doc" size="259072" stream="NGAO Laser Clearing House Planning Draft Submission.doc" user="Main.JasonChin" version="1"
 
META FILEATTACHMENT attachment="Keck_Appendix_A_to_Standard_CPA_Plan_11-25-09.pdf" attr="" comment="Keck Centralized Predictive Avoidance Plan" date="1270855125" name="Keck_Appendix_A_to_Standard_CPA_Plan_11-25-09.pdf" path="Keck_Appendix A to Standard_CPA_Plan_11-25-09.pdf" size="2129348" stream="Keck_Appendix A to Standard_CPA_Plan_11-25-09.pdf" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="LE_Requirements_and_Compliance.xls" attr="" comment="Laser Enclosure Requirements and Compliance" date="1271130824" name="LE_Requirements_and_Compliance.xls" path="LE Requirements and Compliance.xls" size="45568" stream="LE Requirements and Compliance.xls" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_LGSF_Laser_Enclosure_PDv1_0.doc" attr="" comment="Laser Enclosure PDR Design Document" date="1271131001" name="NGAO_LGSF_Laser_Enclosure_PDv1_0.doc" path="NGAO LGSF Laser Enclosure PDv1_0.doc" size="1829376" stream="NGAO LGSF Laser Enclosure PDv1_0.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_LGSF_LE_DD_v1_0.mpp" attr="" comment="Laser Enclosure PDR MS Project" date="1271131028" name="NGAO_LGSF_LE_DD_v1_0.mpp" path="NGAO LGSF LE DD v1_0.mpp" size="323072" stream="NGAO LGSF LE DD v1_0.mpp" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="LE_Effort_Estimates.xls" attr="" comment="Laser Enclosure PDR Labor Estimates" date="1271131079" name="LE_Effort_Estimates.xls" path="LE Effort Estimates.xls" size="20480" stream="LE Effort Estimates.xls" user="Main.JasonChin" version="1"
Added:
>
>
META FILEATTACHMENT attachment="K2_Laser_Removal_Plan_v1_0.pdf" attr="" comment="K2 Laser Removal Plan" date="1271644076" name="K2_Laser_Removal_Plan_v1_0.pdf" path="K2 Laser Removal Plan v1_0.pdf" size="302649" stream="K2 Laser Removal Plan v1_0.pdf" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="K2_Laser_Removal_Estimates.xls" attr="" comment="K2 Laser Removal Estimates" date="1271644093" name="K2_Laser_Removal_Estimates.xls" path="K2 Laser Removal Estimates.xls" size="17408" stream="K2 Laser Removal Estimates.xls" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="K2_Laser_Removal_v1.mpp" attr="" comment="K2 Laser Removal MS Project Plan" date="1271644125" name="K2_Laser_Removal_v1.mpp" path="K2 Laser Removal v1.mpp" size="259072" stream="K2 Laser Removal v1.mpp" user="Main.JasonChin" version="1"

Revision 412010-04-13 - JasonChin

Line: 1 to 1
 
META TOPICPARENT name="WebHome"
NGAO Preliminary Design Phase
Line: 38 to 38
 

WBS 3.5 Laser System Design

WBS 3.5.1 Laser Enclosure

Changed:
<
<

WBS 3.5.1.1 Laser Enclosure Requirements

>
>
Preliminary Design Phase

WBS 3.5.2 Laser

Preliminary Design Phase
 

WBS 3.5.3 Laser Launch Facility

Line: 157 to 165
 
META FILEATTACHMENT attachment="NGAO_Monthly_Report_JC_2009_Oct.doc" attr="h" comment="2009_10 Monthly Status Report" date="1257385064" name="NGAO_Monthly_Report_JC_2009_Oct.doc" path="NGAO Monthly Report JC 2009_Oct.doc" size="59392" stream="NGAO Monthly Report JC 2009_Oct.doc" user="Main.JasonChin" version="2"
META FILEATTACHMENT attachment="NGAO_Laser_Clearing_House_Planning_Draft_Submission.doc" attr="" comment="NGAO Draft Submission for the LCH" date="1270855046" name="NGAO_Laser_Clearing_House_Planning_Draft_Submission.doc" path="NGAO Laser Clearing House Planning Draft Submission.doc" size="259072" stream="NGAO Laser Clearing House Planning Draft Submission.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="Keck_Appendix_A_to_Standard_CPA_Plan_11-25-09.pdf" attr="" comment="Keck Centralized Predictive Avoidance Plan" date="1270855125" name="Keck_Appendix_A_to_Standard_CPA_Plan_11-25-09.pdf" path="Keck_Appendix A to Standard_CPA_Plan_11-25-09.pdf" size="2129348" stream="Keck_Appendix A to Standard_CPA_Plan_11-25-09.pdf" user="Main.JasonChin" version="1"
Added:
>
>
META FILEATTACHMENT attachment="LE_Requirements_and_Compliance.xls" attr="" comment="Laser Enclosure Requirements and Compliance" date="1271130824" name="LE_Requirements_and_Compliance.xls" path="LE Requirements and Compliance.xls" size="45568" stream="LE Requirements and Compliance.xls" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_LGSF_Laser_Enclosure_PDv1_0.doc" attr="" comment="Laser Enclosure PDR Design Document" date="1271131001" name="NGAO_LGSF_Laser_Enclosure_PDv1_0.doc" path="NGAO LGSF Laser Enclosure PDv1_0.doc" size="1829376" stream="NGAO LGSF Laser Enclosure PDv1_0.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_LGSF_LE_DD_v1_0.mpp" attr="" comment="Laser Enclosure PDR MS Project" date="1271131028" name="NGAO_LGSF_LE_DD_v1_0.mpp" path="NGAO LGSF LE DD v1_0.mpp" size="323072" stream="NGAO LGSF LE DD v1_0.mpp" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="LE_Effort_Estimates.xls" attr="" comment="Laser Enclosure PDR Labor Estimates" date="1271131079" name="LE_Effort_Estimates.xls" path="LE Effort Estimates.xls" size="20480" stream="LE Effort Estimates.xls" user="Main.JasonChin" version="1"

Revision 402010-04-10 - JasonChin

Line: 1 to 1
 
META TOPICPARENT name="WebHome"
NGAO Preliminary Design Phase
Line: 74 to 74
 
Changed:
<
<
>
>
Laser Traffic Control System

Laser Clearing House

 

WBS 3.5.5 Laser System Control

Line: 123 to 128
 
META FILEATTACHMENT attachment="NGAO_LGSF_Training.doc" attr="" comment="Laser Guide Star Facility Training" date="1241813452" name="NGAO_LGSF_Training.doc" path="N:\3.10 Operations Transition\NGAO LGSF Training.doc" size="322560" stream="N:\3.10 Operations Transition\NGAO LGSF Training.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_AO_to_LGSF_ICD_v1.doc" attr="h" comment="Adaptive Optics System to LGSF ICD" date="1242183475" name="NGAO_AO_to_LGSF_ICD_v1.doc" path="N:\3.3.6 Internal Interface\NGAO AO to LGSF ICD v1.doc" size="398848" stream="N:\3.3.6 Internal Interface\NGAO AO to LGSF ICD v1.doc" user="Main.JasonChin" version="3"
META FILEATTACHMENT attachment="NGAO_Operations_Transition_Handover_Criteria.doc" attr="" comment="Operations Transition Success Criteria" date="1241813553" name="NGAO_Operations_Transition_Handover_Criteria.doc" path="N:\3.10 Operations Transition\NGAO Operations Transition Handover Criteria.doc" size="166400" stream="N:\3.10 Operations Transition\NGAO Operations Transition Handover Criteria.doc" user="Main.JasonChin" version="1"
Changed:
<
<
META FILEATTACHMENT attachment="NGAO_LTCS_Modification_Preliiminary_Design_DS.doc" attr="h" comment="LTCS Modifications Preliminary Design" date="1242099405" name="NGAO_LTCS_Modification_Preliiminary_Design_DS.doc" path="N:\3.5.4.2 LTCS\NGAO LTCS Modification Preliiminary Design_DS.doc" size="208384" stream="N:\3.5.4.2 LTCS\NGAO LTCS Modification Preliiminary Design_DS.doc" user="Main.JasonChin" version="1"
>
>
META FILEATTACHMENT attachment="NGAO_LTCS_Modification_Preliiminary_Design_DS.doc" attr="h" comment="LTCS Modifications Preliminary Design" date="1270857788" name="NGAO_LTCS_Modification_Preliiminary_Design_DS.doc" path="NGAO LTCS Modification Preliiminary Design v_1.doc" size="200192" stream="NGAO LTCS Modification Preliiminary Design v_1.doc" user="Main.JasonChin" version="2"
 
META FILEATTACHMENT attachment="NGAO_Telescope_to_LGSF_ICD_v1.doc" attr="h" comment="Telescope to LGSF ICD" date="1242183410" name="NGAO_Telescope_to_LGSF_ICD_v1.doc" path="N:\3.3.6 Internal Interface\NGAO Telescope to LGSF ICD v1.doc" size="233984" stream="N:\3.3.6 Internal Interface\NGAO Telescope to LGSF ICD v1.doc" user="Main.JasonChin" version="2"
META FILEATTACHMENT attachment="NGAO_Guider_to_LGSF_ICD_v1.doc" attr="h" comment="NGAO Acquisition Guider System to LGSF ICD" date="1242183515" name="NGAO_Guider_to_LGSF_ICD_v1.doc" path="N:\3.3.6 Internal Interface\NGAO Guider to LGSF ICD v1.doc" size="291840" stream="N:\3.3.6 Internal Interface\NGAO Guider to LGSF ICD v1.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_Safety_System_Test_Plan.doc" attr="h" comment="Laser Safety System Test Plan" date="1242238265" name="NGAO_Safety_System_Test_Plan.doc" path="N:\3.5.4 Laser Safety System\NGAO Safety System Test Plan.doc" size="291840" stream="N:\3.5.4 Laser Safety System\NGAO Safety System Test Plan.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_Operations_Support_Plan.doc" attr="h" comment="NGAO Operations Support Plan" date="1242420002" name="NGAO_Operations_Support_Plan.doc" path="N:\3.10 Operations Transition\NGAO Operations Support Plan.doc" size="421376" stream="N:\3.10 Operations Transition\NGAO Operations Support Plan.doc" user="Main.JasonChin" version="2"
META FILEATTACHMENT attachment="NGAO_Operations_Maintenance_Plan.doc" attr="h" comment="NGAO Operations Maintenance Plan" date="1242433449" name="NGAO_Operations_Maintenance_Plan.doc" path="N:\3.10 Operations Transition\NGAO Operations Maintenance Plan.doc" size="254976" stream="N:\3.10 Operations Transition\NGAO Operations Maintenance Plan.doc" user="Main.JasonChin" version="1"
Changed:
<
<
META FILEATTACHMENT attachment="LCH_Laser_Registration_Form_(V5)_1MAY09.doc" attr="h" comment="Laser Clearing House Registration Form" date="1242762304" name="LCH_Laser_Registration_Form_(V5)_1MAY09.doc" path="N:\3.5.4 Laser Safety System\LCH\LCH Laser Registration Form (V5) 1MAY09.doc" size="511488" stream="N:\3.5.4 Laser Safety System\LCH\LCH Laser Registration Form (V5) 1MAY09.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_Laser_Clearing_House_Planning.doc" attr="h" comment="Laser Clearinghouse Planning PDR" date="1242762328" name="NGAO_Laser_Clearing_House_Planning.doc" path="N:\3.5.4 Laser Safety System\LCH\NGAO Laser Clearing House Planning.doc" size="343552" stream="N:\3.5.4 Laser Safety System\LCH\NGAO Laser Clearing House Planning.doc" user="Main.JasonChin" version="1"
>
>
META FILEATTACHMENT attachment="NGAO_Laser_Clearing_House_Planning.doc" attr="h" comment="Laser Clearinghouse Planning PDR" date="1270854879" name="NGAO_Laser_Clearing_House_Planning.doc" path="NGAO Laser Clearing House Planning.doc" size="370176" stream="NGAO Laser Clearing House Planning.doc" user="Main.JasonChin" version="2"
 
META FILEATTACHMENT attachment="LLF_System_Project_Plan.mpp" attr="h" comment="LLF Project Plan" date="1244234584" name="LLF_System_Project_Plan.mpp" path="N:\3.5.3 Laser Launch Facility\LLF System Project Plan.mpp" size="243200" stream="N:\3.5.3 Laser Launch Facility\LLF System Project Plan.mpp" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_Nsquared_V3_0.xls" attr="h" comment="Interface N^2 Diagram" date="1244235010" name="NGAO_Nsquared_V3_0.xls" path="N:\3.3 System Engineering\NGAO_Nsquared_V3 0.xls" size="69120" stream="N:\3.3 System Engineering\NGAO_Nsquared_V3 0.xls" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_Safety_System_Functions_with_the_LLF.doc" attr="h" comment="Safety System Functions with LLF" date="1244250291" name="NGAO_Safety_System_Functions_with_the_LLF.doc" path="N:\3.5.4 Laser Safety System\NGAO Safety System Functions with the LLF.doc" size="198656" stream="N:\3.5.4 Laser Safety System\NGAO Safety System Functions with the LLF.doc" user="Main.JasonChin" version="1"
Line: 151 to 155
 
META FILEATTACHMENT attachment="NGAO_Monthly_Report_JC_2009_Aug.doc" attr="h" comment="2009_08 Monthly Status Report" date="1257197009" name="NGAO_Monthly_Report_JC_2009_Aug.doc" path="NGAO Monthly Report JC 2009_Aug.doc" size="58368" stream="NGAO Monthly Report JC 2009_Aug.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_Monthly_Report_JC_2009_Sep.doc" attr="h" comment="2009_09 Monthly Status Report" date="1257197030" name="NGAO_Monthly_Report_JC_2009_Sep.doc" path="NGAO Monthly Report JC 2009_Sep.doc" size="59392" stream="NGAO Monthly Report JC 2009_Sep.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_Monthly_Report_JC_2009_Oct.doc" attr="h" comment="2009_10 Monthly Status Report" date="1257385064" name="NGAO_Monthly_Report_JC_2009_Oct.doc" path="NGAO Monthly Report JC 2009_Oct.doc" size="59392" stream="NGAO Monthly Report JC 2009_Oct.doc" user="Main.JasonChin" version="2"
Added:
>
>
META FILEATTACHMENT attachment="NGAO_Laser_Clearing_House_Planning_Draft_Submission.doc" attr="" comment="NGAO Draft Submission for the LCH" date="1270855046" name="NGAO_Laser_Clearing_House_Planning_Draft_Submission.doc" path="NGAO Laser Clearing House Planning Draft Submission.doc" size="259072" stream="NGAO Laser Clearing House Planning Draft Submission.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="Keck_Appendix_A_to_Standard_CPA_Plan_11-25-09.pdf" attr="" comment="Keck Centralized Predictive Avoidance Plan" date="1270855125" name="Keck_Appendix_A_to_Standard_CPA_Plan_11-25-09.pdf" path="Keck_Appendix A to Standard_CPA_Plan_11-25-09.pdf" size="2129348" stream="Keck_Appendix A to Standard_CPA_Plan_11-25-09.pdf" user="Main.JasonChin" version="1"

Revision 392009-11-05 - JasonChin

Line: 1 to 1
 
META TOPICPARENT name="WebHome"
NGAO Preliminary Design Phase
Line: 150 to 150
 
META FILEATTACHMENT attachment="NGAO_Monthly_Report_JC_2009_Jul.doc" attr="h" comment="2009_07 Monthly Status Report" date="1257196990" name="NGAO_Monthly_Report_JC_2009_Jul.doc" path="NGAO Monthly Report JC 2009_Jul.doc" size="58880" stream="NGAO Monthly Report JC 2009_Jul.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_Monthly_Report_JC_2009_Aug.doc" attr="h" comment="2009_08 Monthly Status Report" date="1257197009" name="NGAO_Monthly_Report_JC_2009_Aug.doc" path="NGAO Monthly Report JC 2009_Aug.doc" size="58368" stream="NGAO Monthly Report JC 2009_Aug.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_Monthly_Report_JC_2009_Sep.doc" attr="h" comment="2009_09 Monthly Status Report" date="1257197030" name="NGAO_Monthly_Report_JC_2009_Sep.doc" path="NGAO Monthly Report JC 2009_Sep.doc" size="59392" stream="NGAO Monthly Report JC 2009_Sep.doc" user="Main.JasonChin" version="1"
Changed:
<
<
META FILEATTACHMENT attachment="NGAO_Monthly_Report_JC_2009_Oct.doc" attr="h" comment="2009_10 Monthly Status Report" date="1257197047" name="NGAO_Monthly_Report_JC_2009_Oct.doc" path="NGAO Monthly Report JC 2009_Oct.doc" size="59392" stream="NGAO Monthly Report JC 2009_Oct.doc" user="Main.JasonChin" version="1"
>
>
META FILEATTACHMENT attachment="NGAO_Monthly_Report_JC_2009_Oct.doc" attr="h" comment="2009_10 Monthly Status Report" date="1257385064" name="NGAO_Monthly_Report_JC_2009_Oct.doc" path="NGAO Monthly Report JC 2009_Oct.doc" size="59392" stream="NGAO Monthly Report JC 2009_Oct.doc" user="Main.JasonChin" version="2"

Revision 382009-11-02 - JasonChin

Line: 1 to 1
 
META TOPICPARENT name="WebHome"
NGAO Preliminary Design Phase
Line: 13 to 13
 

Management

Changed:
<
<
Laser Launch Facility Mini Review
>
>

Monthly Status Reports

Reviews

 

WBS 3.3 System Engineering

Line: 129 to 143
 
META FILEATTACHMENT attachment="NGAO_LLF_Switchyard_v1_0.doc" attr="h" comment="Preliminary Design Switchyard (Draft)" date="1251253857" name="NGAO_LLF_Switchyard_v1_0.doc" path="N:\3.5.3 Laser Launch Facility\Switchyard\NGAO LLF Switchyard v1_0.doc" size="720896" stream="N:\3.5.3 Laser Launch Facility\Switchyard\NGAO LLF Switchyard v1_0.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="Budgetted_Performance.xls" attr="h" comment="BOM and Weight Budgets" date="1251420808" name="Budgetted_Performance.xls" path="H:\NGAO\3.5.3 Laser Launch Facility\Budgetted Performance.xls" size="58880" stream="H:\NGAO\3.5.3 Laser Launch Facility\Budgetted Performance.xls" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_LLF_Beam_Transport_Optics_v1_1.doc" attr="h" comment="Draft Working Doc 9/3/09" date="1252025928" name="NGAO_LLF_Beam_Transport_Optics_v1_1.doc" path="N:\3.5.3 Laser Launch Facility\BTO\NGAO LLF Beam Transport Optics v1_1.doc" size="1651712" stream="N:\3.5.3 Laser Launch Facility\BTO\NGAO LLF Beam Transport Optics v1_1.doc" user="Main.JasonChin" version="1"
Added:
>
>
META FILEATTACHMENT attachment="NGAO_Monthly_Report_JC_2009_Feb_Mar.doc" attr="h" comment="2009_03 Monthly Report" date="1257196835" name="NGAO_Monthly_Report_JC_2009_Feb_Mar.doc" path="NGAO Monthly Report JC 2009_Feb_Mar.doc" size="51200" stream="NGAO Monthly Report JC 2009_Feb_Mar.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_Monthly_Report_JC_2009_April.doc" attr="h" comment="2009_04 Monthly Status Report" date="1257196931" name="NGAO_Monthly_Report_JC_2009_April.doc" path="NGAO Monthly Report JC 2009_April.doc" size="57344" stream="NGAO Monthly Report JC 2009_April.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_Monthly_Report_JC_2009_May.doc" attr="h" comment="2009_05 Monthly Status Report" date="1257196950" name="NGAO_Monthly_Report_JC_2009_May.doc" path="NGAO Monthly Report JC 2009_May.doc" size="57856" stream="NGAO Monthly Report JC 2009_May.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_Monthly_Report_JC_2009_Jun.doc" attr="h" comment="2009_06 Monthly Status Report" date="1257196972" name="NGAO_Monthly_Report_JC_2009_Jun.doc" path="NGAO Monthly Report JC 2009_Jun.doc" size="77312" stream="NGAO Monthly Report JC 2009_Jun.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_Monthly_Report_JC_2009_Jul.doc" attr="h" comment="2009_07 Monthly Status Report" date="1257196990" name="NGAO_Monthly_Report_JC_2009_Jul.doc" path="NGAO Monthly Report JC 2009_Jul.doc" size="58880" stream="NGAO Monthly Report JC 2009_Jul.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_Monthly_Report_JC_2009_Aug.doc" attr="h" comment="2009_08 Monthly Status Report" date="1257197009" name="NGAO_Monthly_Report_JC_2009_Aug.doc" path="NGAO Monthly Report JC 2009_Aug.doc" size="58368" stream="NGAO Monthly Report JC 2009_Aug.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_Monthly_Report_JC_2009_Sep.doc" attr="h" comment="2009_09 Monthly Status Report" date="1257197030" name="NGAO_Monthly_Report_JC_2009_Sep.doc" path="NGAO Monthly Report JC 2009_Sep.doc" size="59392" stream="NGAO Monthly Report JC 2009_Sep.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_Monthly_Report_JC_2009_Oct.doc" attr="h" comment="2009_10 Monthly Status Report" date="1257197047" name="NGAO_Monthly_Report_JC_2009_Oct.doc" path="NGAO Monthly Report JC 2009_Oct.doc" size="59392" stream="NGAO Monthly Report JC 2009_Oct.doc" user="Main.JasonChin" version="1"

Revision 372009-10-30 - JasonChin

Line: 1 to 1
 
META TOPICPARENT name="WebHome"
NGAO Preliminary Design Phase
Line: 12 to 12
 
Added:
>
>

Management

Laser Launch Facility Mini Review
 

WBS 3.3 System Engineering

WBS 3.3.5 External Interfaces

Revision 362009-09-04 - JasonChin

Line: 1 to 1
 
META TOPICPARENT name="WebHome"
NGAO Preliminary Design Phase
Line: 32 to 32
 
Changed:
<
<
>
>
  Launch Telescope
  • LT Preliminary Design Report
Line: 43 to 43
  Beam Transport Optics
Changed:
<
<
>
>
  Switchyard
Line: 85 to 85
 
Deleted:
<
<
 
META FILEATTACHMENT attachment="K2_Laser_Removal_Plan.doc" attr="h" comment="Word Document describing tasks associated with removing the K2 laser" date="1234310927" name="K2_Laser_Removal_Plan.doc" path="H:\NGAO\K2 Laser Removal Plan.doc" size="3721728" stream="H:\NGAO\K2 Laser Removal Plan.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="K2_Laser_Removal_v1.mpp" attr="h" comment="Project Plan associated with removing the K2 laser" date="1243971145" name="K2_Laser_Removal_v1.mpp" path="N:\3.9 Integration and Test\K2 Laser Removal v1 entirety.mpp" size="271872" stream="N:\3.9 Integration and Test\K2 Laser Removal v1 entirety.mpp" user="Main.JasonChin" version="2"
META FILEATTACHMENT attachment="NGAO_Laser_to_Safety_System_Interface.pdf" attr="h" comment="" date="1234490284" name="NGAO_Laser_to_Safety_System_Interface.pdf" path="H:\NGAO\1.3.5.4 Safety System\NGAO Laser to Safety System Interface.pdf" size="120237" stream="H:\NGAO\1.3.5.4 Safety System\NGAO Laser to Safety System Interface.pdf" user="Main.JasonChin" version="1"
Line: 128 to 125
 
META FILEATTACHMENT attachment="NGAO_LLF_Beam_Transport_Optics_v1_0.doc" attr="h" comment="BTO Preliminary Design" date="1251244760" name="NGAO_LLF_Beam_Transport_Optics_v1_0.doc" path="N:\3.5.3 Laser Launch Facility\BTO\NGAO LLF Beam Transport Optics v1_0.doc" size="677376" stream="N:\3.5.3 Laser Launch Facility\BTO\NGAO LLF Beam Transport Optics v1_0.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_LLF_Switchyard_v1_0.doc" attr="h" comment="Preliminary Design Switchyard (Draft)" date="1251253857" name="NGAO_LLF_Switchyard_v1_0.doc" path="N:\3.5.3 Laser Launch Facility\Switchyard\NGAO LLF Switchyard v1_0.doc" size="720896" stream="N:\3.5.3 Laser Launch Facility\Switchyard\NGAO LLF Switchyard v1_0.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="Budgetted_Performance.xls" attr="h" comment="BOM and Weight Budgets" date="1251420808" name="Budgetted_Performance.xls" path="H:\NGAO\3.5.3 Laser Launch Facility\Budgetted Performance.xls" size="58880" stream="H:\NGAO\3.5.3 Laser Launch Facility\Budgetted Performance.xls" user="Main.JasonChin" version="1"
Added:
>
>
META FILEATTACHMENT attachment="NGAO_LLF_Beam_Transport_Optics_v1_1.doc" attr="h" comment="Draft Working Doc 9/3/09" date="1252025928" name="NGAO_LLF_Beam_Transport_Optics_v1_1.doc" path="N:\3.5.3 Laser Launch Facility\BTO\NGAO LLF Beam Transport Optics v1_1.doc" size="1651712" stream="N:\3.5.3 Laser Launch Facility\BTO\NGAO LLF Beam Transport Optics v1_1.doc" user="Main.JasonChin" version="1"

Revision 352009-08-28 - JasonChin

Line: 1 to 1
 
META TOPICPARENT name="WebHome"
NGAO Preliminary Design Phase
Line: 32 to 32
 
Added:
>
>
 Launch Telescope
Line: 84 to 86
 
Added:
>
>
 
META FILEATTACHMENT attachment="K2_Laser_Removal_Plan.doc" attr="h" comment="Word Document describing tasks associated with removing the K2 laser" date="1234310927" name="K2_Laser_Removal_Plan.doc" path="H:\NGAO\K2 Laser Removal Plan.doc" size="3721728" stream="H:\NGAO\K2 Laser Removal Plan.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="K2_Laser_Removal_v1.mpp" attr="h" comment="Project Plan associated with removing the K2 laser" date="1243971145" name="K2_Laser_Removal_v1.mpp" path="N:\3.9 Integration and Test\K2 Laser Removal v1 entirety.mpp" size="271872" stream="N:\3.9 Integration and Test\K2 Laser Removal v1 entirety.mpp" user="Main.JasonChin" version="2"
META FILEATTACHMENT attachment="NGAO_Laser_to_Safety_System_Interface.pdf" attr="h" comment="" date="1234490284" name="NGAO_Laser_to_Safety_System_Interface.pdf" path="H:\NGAO\1.3.5.4 Safety System\NGAO Laser to Safety System Interface.pdf" size="120237" stream="H:\NGAO\1.3.5.4 Safety System\NGAO Laser to Safety System Interface.pdf" user="Main.JasonChin" version="1"
Line: 123 to 127
 
META FILEATTACHMENT attachment="NGAO_LLF_Beam_Generation_System_v1_0.doc" attr="h" comment="PDR Working Doc of BGS" date="1251163165" name="NGAO_LLF_Beam_Generation_System_v1_0.doc" path="N:\3.5.3 Laser Launch Facility\NGAO LLF Beam Generation System v1_0.doc" size="624640" stream="N:\3.5.3 Laser Launch Facility\NGAO LLF Beam Generation System v1_0.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_LLF_Beam_Transport_Optics_v1_0.doc" attr="h" comment="BTO Preliminary Design" date="1251244760" name="NGAO_LLF_Beam_Transport_Optics_v1_0.doc" path="N:\3.5.3 Laser Launch Facility\BTO\NGAO LLF Beam Transport Optics v1_0.doc" size="677376" stream="N:\3.5.3 Laser Launch Facility\BTO\NGAO LLF Beam Transport Optics v1_0.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_LLF_Switchyard_v1_0.doc" attr="h" comment="Preliminary Design Switchyard (Draft)" date="1251253857" name="NGAO_LLF_Switchyard_v1_0.doc" path="N:\3.5.3 Laser Launch Facility\Switchyard\NGAO LLF Switchyard v1_0.doc" size="720896" stream="N:\3.5.3 Laser Launch Facility\Switchyard\NGAO LLF Switchyard v1_0.doc" user="Main.JasonChin" version="1"
Added:
>
>
META FILEATTACHMENT attachment="Budgetted_Performance.xls" attr="h" comment="BOM and Weight Budgets" date="1251420808" name="Budgetted_Performance.xls" path="H:\NGAO\3.5.3 Laser Launch Facility\Budgetted Performance.xls" size="58880" stream="H:\NGAO\3.5.3 Laser Launch Facility\Budgetted Performance.xls" user="Main.JasonChin" version="1"

Revision 342009-08-26 - JasonChin

Line: 1 to 1
 
META TOPICPARENT name="WebHome"
NGAO Preliminary Design Phase
Line: 44 to 44
  Switchyard
Changed:
<
<
  • Switch Yard Preliminary Design Report
>
>
 Infrastructure
Line: 115 to 116
 
META FILEATTACHMENT attachment="LLF_System_Project_Plan.mpp" attr="h" comment="LLF Project Plan" date="1244234584" name="LLF_System_Project_Plan.mpp" path="N:\3.5.3 Laser Launch Facility\LLF System Project Plan.mpp" size="243200" stream="N:\3.5.3 Laser Launch Facility\LLF System Project Plan.mpp" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_Nsquared_V3_0.xls" attr="h" comment="Interface N^2 Diagram" date="1244235010" name="NGAO_Nsquared_V3_0.xls" path="N:\3.3 System Engineering\NGAO_Nsquared_V3 0.xls" size="69120" stream="N:\3.3 System Engineering\NGAO_Nsquared_V3 0.xls" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_Safety_System_Functions_with_the_LLF.doc" attr="h" comment="Safety System Functions with LLF" date="1244250291" name="NGAO_Safety_System_Functions_with_the_LLF.doc" path="N:\3.5.4 Laser Safety System\NGAO Safety System Functions with the LLF.doc" size="198656" stream="N:\3.5.4 Laser Safety System\NGAO Safety System Functions with the LLF.doc" user="Main.JasonChin" version="1"
Changed:
<
<
META FILEATTACHMENT attachment="BGS_design_25jun09.ppt" attr="h" comment="Beam Generation System Design Overiew" date="1246043117" name="BGS_design_25jun09.ppt" path="N:\3.5.3 Laser Launch Facility\BGS\BGS_design_25jun09.ppt" size="230400" stream="N:\3.5.3 Laser Launch Facility\BGS\BGS_design_25jun09.ppt" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="BTO_design_17aug09.ppt" attr="h" comment="Team Meeting for BTO Design Aug 17 2009" date="1250619505" name="BTO_design_17aug09.ppt" path="N:\3.5.3 Laser Launch Facility\BTO_design_17aug09.ppt" size="951808" stream="N:\3.5.3 Laser Launch Facility\BTO_design_17aug09.ppt" user="Main.JasonChin" version="1"
>
>
META FILEATTACHMENT attachment="BGS_design_25jun09.ppt" attr="h" comment="Beam Generation System Design Overiew" date="1251253899" name="BGS_design_25jun09.ppt" path="N:\3.5.3 Laser Launch Facility\BGS\NGAO LLF Beam Generation System v1_0.doc" size="752128" stream="N:\3.5.3 Laser Launch Facility\BGS\NGAO LLF Beam Generation System v1_0.doc" user="Main.JasonChin" version="2"
META FILEATTACHMENT attachment="BTO_design_17aug09.ppt" attr="h" comment="Team Meeting for BTO Design Aug 17 2009" date="1251253932" name="BTO_design_17aug09.ppt" path="N:\3.5.3 Laser Launch Facility\BTO\NGAO LLF Beam Transport Optics v1_0.doc" size="753664" stream="N:\3.5.3 Laser Launch Facility\BTO\NGAO LLF Beam Transport Optics v1_0.doc" user="Main.JasonChin" version="2"
 
META FILEATTACHMENT attachment="NGAO_LLF_Preliiminary_Design.doc" attr="h" comment="NGAO LLF Preliminary Design Draft Document" date="1250619623" name="NGAO_LLF_Preliiminary_Design.doc" path="N:\3.5.3 Laser Launch Facility\NGAO LLF Preliiminary Design.doc" size="1390080" stream="N:\3.5.3 Laser Launch Facility\NGAO LLF Preliiminary Design.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_LLF_Minutes_2009_08_18.doc" attr="h" comment="LLF Meeting Minutes Aug 18, 2009" date="1250637265" name="NGAO_LLF_Minutes_2009_08_18.doc" path="N:\3.5.3 Laser Launch Facility\NGAO LLF Minutes 2009_08_18.doc" size="799744" stream="N:\3.5.3 Laser Launch Facility\NGAO LLF Minutes 2009_08_18.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_LLF_Beam_Generation_System_v1_0.doc" attr="h" comment="PDR Working Doc of BGS" date="1251163165" name="NGAO_LLF_Beam_Generation_System_v1_0.doc" path="N:\3.5.3 Laser Launch Facility\NGAO LLF Beam Generation System v1_0.doc" size="624640" stream="N:\3.5.3 Laser Launch Facility\NGAO LLF Beam Generation System v1_0.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_LLF_Beam_Transport_Optics_v1_0.doc" attr="h" comment="BTO Preliminary Design" date="1251244760" name="NGAO_LLF_Beam_Transport_Optics_v1_0.doc" path="N:\3.5.3 Laser Launch Facility\BTO\NGAO LLF Beam Transport Optics v1_0.doc" size="677376" stream="N:\3.5.3 Laser Launch Facility\BTO\NGAO LLF Beam Transport Optics v1_0.doc" user="Main.JasonChin" version="1"
Added:
>
>
META FILEATTACHMENT attachment="NGAO_LLF_Switchyard_v1_0.doc" attr="h" comment="Preliminary Design Switchyard (Draft)" date="1251253857" name="NGAO_LLF_Switchyard_v1_0.doc" path="N:\3.5.3 Laser Launch Facility\Switchyard\NGAO LLF Switchyard v1_0.doc" size="720896" stream="N:\3.5.3 Laser Launch Facility\Switchyard\NGAO LLF Switchyard v1_0.doc" user="Main.JasonChin" version="1"

Revision 332009-08-26 - JasonChin

Line: 1 to 1
 
META TOPICPARENT name="WebHome"
NGAO Preliminary Design Phase
Line: 38 to 38
 
  • LLF Preliminary Design Report
Beam Generation System
Changed:
<
<
>
>
 Beam Transport Optics
Added:
>
>
 
Deleted:
<
<
  • BTO Preliminary Design Report
 Switchyard
  • Switch Yard Preliminary Design Report
Infrastructure
Line: 121 to 120
 
META FILEATTACHMENT attachment="NGAO_LLF_Preliiminary_Design.doc" attr="h" comment="NGAO LLF Preliminary Design Draft Document" date="1250619623" name="NGAO_LLF_Preliiminary_Design.doc" path="N:\3.5.3 Laser Launch Facility\NGAO LLF Preliiminary Design.doc" size="1390080" stream="N:\3.5.3 Laser Launch Facility\NGAO LLF Preliiminary Design.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_LLF_Minutes_2009_08_18.doc" attr="h" comment="LLF Meeting Minutes Aug 18, 2009" date="1250637265" name="NGAO_LLF_Minutes_2009_08_18.doc" path="N:\3.5.3 Laser Launch Facility\NGAO LLF Minutes 2009_08_18.doc" size="799744" stream="N:\3.5.3 Laser Launch Facility\NGAO LLF Minutes 2009_08_18.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_LLF_Beam_Generation_System_v1_0.doc" attr="h" comment="PDR Working Doc of BGS" date="1251163165" name="NGAO_LLF_Beam_Generation_System_v1_0.doc" path="N:\3.5.3 Laser Launch Facility\NGAO LLF Beam Generation System v1_0.doc" size="624640" stream="N:\3.5.3 Laser Launch Facility\NGAO LLF Beam Generation System v1_0.doc" user="Main.JasonChin" version="1"
Added:
>
>
META FILEATTACHMENT attachment="NGAO_LLF_Beam_Transport_Optics_v1_0.doc" attr="h" comment="BTO Preliminary Design" date="1251244760" name="NGAO_LLF_Beam_Transport_Optics_v1_0.doc" path="N:\3.5.3 Laser Launch Facility\BTO\NGAO LLF Beam Transport Optics v1_0.doc" size="677376" stream="N:\3.5.3 Laser Launch Facility\BTO\NGAO LLF Beam Transport Optics v1_0.doc" user="Main.JasonChin" version="1"

Revision 322009-08-25 - JasonChin

Line: 1 to 1
 
META TOPICPARENT name="WebHome"
NGAO Preliminary Design Phase
Line: 38 to 38
 
  • LLF Preliminary Design Report
Beam Generation System
Added:
>
>
 
  • BGS Preliminary Design Report
Beam Transport Optics
Line: 121 to 120
 
META FILEATTACHMENT attachment="BTO_design_17aug09.ppt" attr="h" comment="Team Meeting for BTO Design Aug 17 2009" date="1250619505" name="BTO_design_17aug09.ppt" path="N:\3.5.3 Laser Launch Facility\BTO_design_17aug09.ppt" size="951808" stream="N:\3.5.3 Laser Launch Facility\BTO_design_17aug09.ppt" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_LLF_Preliiminary_Design.doc" attr="h" comment="NGAO LLF Preliminary Design Draft Document" date="1250619623" name="NGAO_LLF_Preliiminary_Design.doc" path="N:\3.5.3 Laser Launch Facility\NGAO LLF Preliiminary Design.doc" size="1390080" stream="N:\3.5.3 Laser Launch Facility\NGAO LLF Preliiminary Design.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_LLF_Minutes_2009_08_18.doc" attr="h" comment="LLF Meeting Minutes Aug 18, 2009" date="1250637265" name="NGAO_LLF_Minutes_2009_08_18.doc" path="N:\3.5.3 Laser Launch Facility\NGAO LLF Minutes 2009_08_18.doc" size="799744" stream="N:\3.5.3 Laser Launch Facility\NGAO LLF Minutes 2009_08_18.doc" user="Main.JasonChin" version="1"
Added:
>
>
META FILEATTACHMENT attachment="NGAO_LLF_Beam_Generation_System_v1_0.doc" attr="h" comment="PDR Working Doc of BGS" date="1251163165" name="NGAO_LLF_Beam_Generation_System_v1_0.doc" path="N:\3.5.3 Laser Launch Facility\NGAO LLF Beam Generation System v1_0.doc" size="624640" stream="N:\3.5.3 Laser Launch Facility\NGAO LLF Beam Generation System v1_0.doc" user="Main.JasonChin" version="1"

Revision 312009-08-18 - JasonChin

Line: 1 to 1
 
META TOPICPARENT name="WebHome"
NGAO Preliminary Design Phase
Line: 41 to 41
 
  • BGS Preliminary Design Report
Beam Transport Optics
Added:
>
>
 
  • BTO Preliminary Design Report
Switchyard
  • Switch Yard Preliminary Design Report
Line: 118 to 120
 
META FILEATTACHMENT attachment="BGS_design_25jun09.ppt" attr="h" comment="Beam Generation System Design Overiew" date="1246043117" name="BGS_design_25jun09.ppt" path="N:\3.5.3 Laser Launch Facility\BGS\BGS_design_25jun09.ppt" size="230400" stream="N:\3.5.3 Laser Launch Facility\BGS\BGS_design_25jun09.ppt" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="BTO_design_17aug09.ppt" attr="h" comment="Team Meeting for BTO Design Aug 17 2009" date="1250619505" name="BTO_design_17aug09.ppt" path="N:\3.5.3 Laser Launch Facility\BTO_design_17aug09.ppt" size="951808" stream="N:\3.5.3 Laser Launch Facility\BTO_design_17aug09.ppt" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_LLF_Preliiminary_Design.doc" attr="h" comment="NGAO LLF Preliminary Design Draft Document" date="1250619623" name="NGAO_LLF_Preliiminary_Design.doc" path="N:\3.5.3 Laser Launch Facility\NGAO LLF Preliiminary Design.doc" size="1390080" stream="N:\3.5.3 Laser Launch Facility\NGAO LLF Preliiminary Design.doc" user="Main.JasonChin" version="1"
Added:
>
>
META FILEATTACHMENT attachment="NGAO_LLF_Minutes_2009_08_18.doc" attr="h" comment="LLF Meeting Minutes Aug 18, 2009" date="1250637265" name="NGAO_LLF_Minutes_2009_08_18.doc" path="N:\3.5.3 Laser Launch Facility\NGAO LLF Minutes 2009_08_18.doc" size="799744" stream="N:\3.5.3 Laser Launch Facility\NGAO LLF Minutes 2009_08_18.doc" user="Main.JasonChin" version="1"

Revision 302009-08-18 - JasonChin

Line: 1 to 1
 
META TOPICPARENT name="WebHome"
NGAO Preliminary Design Phase
Line: 30 to 30
 

WBS 3.5.3 Laser Launch Facility

Added:
>
>
 
  • LLF Preliminary Design Report
Launch Telescope
  • LT Preliminary Design Report
Line: 39 to 40
  Beam Transport Optics
Added:
>
>
 
  • BTO Preliminary Design Report
Switchyard
  • Switch Yard Preliminary Design Report
Line: 113 to 116
 
META FILEATTACHMENT attachment="NGAO_Nsquared_V3_0.xls" attr="h" comment="Interface N^2 Diagram" date="1244235010" name="NGAO_Nsquared_V3_0.xls" path="N:\3.3 System Engineering\NGAO_Nsquared_V3 0.xls" size="69120" stream="N:\3.3 System Engineering\NGAO_Nsquared_V3 0.xls" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_Safety_System_Functions_with_the_LLF.doc" attr="h" comment="Safety System Functions with LLF" date="1244250291" name="NGAO_Safety_System_Functions_with_the_LLF.doc" path="N:\3.5.4 Laser Safety System\NGAO Safety System Functions with the LLF.doc" size="198656" stream="N:\3.5.4 Laser Safety System\NGAO Safety System Functions with the LLF.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="BGS_design_25jun09.ppt" attr="h" comment="Beam Generation System Design Overiew" date="1246043117" name="BGS_design_25jun09.ppt" path="N:\3.5.3 Laser Launch Facility\BGS\BGS_design_25jun09.ppt" size="230400" stream="N:\3.5.3 Laser Launch Facility\BGS\BGS_design_25jun09.ppt" user="Main.JasonChin" version="1"
Added:
>
>
META FILEATTACHMENT attachment="BTO_design_17aug09.ppt" attr="h" comment="Team Meeting for BTO Design Aug 17 2009" date="1250619505" name="BTO_design_17aug09.ppt" path="N:\3.5.3 Laser Launch Facility\BTO_design_17aug09.ppt" size="951808" stream="N:\3.5.3 Laser Launch Facility\BTO_design_17aug09.ppt" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_LLF_Preliiminary_Design.doc" attr="h" comment="NGAO LLF Preliminary Design Draft Document" date="1250619623" name="NGAO_LLF_Preliiminary_Design.doc" path="N:\3.5.3 Laser Launch Facility\NGAO LLF Preliiminary Design.doc" size="1390080" stream="N:\3.5.3 Laser Launch Facility\NGAO LLF Preliiminary Design.doc" user="Main.JasonChin" version="1"

Revision 292009-06-26 - JasonChin

Line: 1 to 1
 
META TOPICPARENT name="WebHome"
NGAO Preliminary Design Phase
Line: 31 to 31
 
Added:
>
>
Launch Telescope Beam Generation System Beam Transport Optics
  • BTO Preliminary Design Report
Switchyard
  • Switch Yard Preliminary Design Report
Infrastructure
 
Deleted:
<
<
 

WBS 3.5.4 Safety System Design

Line: 107 to 112
 
META FILEATTACHMENT attachment="LLF_System_Project_Plan.mpp" attr="h" comment="LLF Project Plan" date="1244234584" name="LLF_System_Project_Plan.mpp" path="N:\3.5.3 Laser Launch Facility\LLF System Project Plan.mpp" size="243200" stream="N:\3.5.3 Laser Launch Facility\LLF System Project Plan.mpp" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_Nsquared_V3_0.xls" attr="h" comment="Interface N^2 Diagram" date="1244235010" name="NGAO_Nsquared_V3_0.xls" path="N:\3.3 System Engineering\NGAO_Nsquared_V3 0.xls" size="69120" stream="N:\3.3 System Engineering\NGAO_Nsquared_V3 0.xls" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_Safety_System_Functions_with_the_LLF.doc" attr="h" comment="Safety System Functions with LLF" date="1244250291" name="NGAO_Safety_System_Functions_with_the_LLF.doc" path="N:\3.5.4 Laser Safety System\NGAO Safety System Functions with the LLF.doc" size="198656" stream="N:\3.5.4 Laser Safety System\NGAO Safety System Functions with the LLF.doc" user="Main.JasonChin" version="1"
Added:
>
>
META FILEATTACHMENT attachment="BGS_design_25jun09.ppt" attr="h" comment="Beam Generation System Design Overiew" date="1246043117" name="BGS_design_25jun09.ppt" path="N:\3.5.3 Laser Launch Facility\BGS\BGS_design_25jun09.ppt" size="230400" stream="N:\3.5.3 Laser Launch Facility\BGS\BGS_design_25jun09.ppt" user="Main.JasonChin" version="1"

Revision 282009-06-06 - JasonChin

Line: 1 to 1
 
META TOPICPARENT name="WebHome"
NGAO Preliminary Design Phase
Line: 38 to 38
 

WBS 3.5.4 Safety System Design

Added:
>
>
 
Line: 103 to 106
 
META FILEATTACHMENT attachment="NGAO_Laser_Clearing_House_Planning.doc" attr="h" comment="Laser Clearinghouse Planning PDR" date="1242762328" name="NGAO_Laser_Clearing_House_Planning.doc" path="N:\3.5.4 Laser Safety System\LCH\NGAO Laser Clearing House Planning.doc" size="343552" stream="N:\3.5.4 Laser Safety System\LCH\NGAO Laser Clearing House Planning.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="LLF_System_Project_Plan.mpp" attr="h" comment="LLF Project Plan" date="1244234584" name="LLF_System_Project_Plan.mpp" path="N:\3.5.3 Laser Launch Facility\LLF System Project Plan.mpp" size="243200" stream="N:\3.5.3 Laser Launch Facility\LLF System Project Plan.mpp" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_Nsquared_V3_0.xls" attr="h" comment="Interface N^2 Diagram" date="1244235010" name="NGAO_Nsquared_V3_0.xls" path="N:\3.3 System Engineering\NGAO_Nsquared_V3 0.xls" size="69120" stream="N:\3.3 System Engineering\NGAO_Nsquared_V3 0.xls" user="Main.JasonChin" version="1"
Added:
>
>
META FILEATTACHMENT attachment="NGAO_Safety_System_Functions_with_the_LLF.doc" attr="h" comment="Safety System Functions with LLF" date="1244250291" name="NGAO_Safety_System_Functions_with_the_LLF.doc" path="N:\3.5.4 Laser Safety System\NGAO Safety System Functions with the LLF.doc" size="198656" stream="N:\3.5.4 Laser Safety System\NGAO Safety System Functions with the LLF.doc" user="Main.JasonChin" version="1"

Revision 272009-06-05 - JasonChin

Line: 1 to 1
 
META TOPICPARENT name="WebHome"
NGAO Preliminary Design Phase
Line: 10 to 10
 

Useful Information

Added:
>
>
 

WBS 3.3 System Engineering

Line: 26 to 27
 

WBS 3.5.1.1 Laser Enclosure Requirements

Changed:
<
<

WBS 3.5.3 Beam Transport System

>
>

WBS 3.5.3 Laser Launch Facility

 
Line: 95 to 101
 
META FILEATTACHMENT attachment="NGAO_Operations_Maintenance_Plan.doc" attr="h" comment="NGAO Operations Maintenance Plan" date="1242433449" name="NGAO_Operations_Maintenance_Plan.doc" path="N:\3.10 Operations Transition\NGAO Operations Maintenance Plan.doc" size="254976" stream="N:\3.10 Operations Transition\NGAO Operations Maintenance Plan.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="LCH_Laser_Registration_Form_(V5)_1MAY09.doc" attr="h" comment="Laser Clearing House Registration Form" date="1242762304" name="LCH_Laser_Registration_Form_(V5)_1MAY09.doc" path="N:\3.5.4 Laser Safety System\LCH\LCH Laser Registration Form (V5) 1MAY09.doc" size="511488" stream="N:\3.5.4 Laser Safety System\LCH\LCH Laser Registration Form (V5) 1MAY09.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_Laser_Clearing_House_Planning.doc" attr="h" comment="Laser Clearinghouse Planning PDR" date="1242762328" name="NGAO_Laser_Clearing_House_Planning.doc" path="N:\3.5.4 Laser Safety System\LCH\NGAO Laser Clearing House Planning.doc" size="343552" stream="N:\3.5.4 Laser Safety System\LCH\NGAO Laser Clearing House Planning.doc" user="Main.JasonChin" version="1"
Added:
>
>
META FILEATTACHMENT attachment="LLF_System_Project_Plan.mpp" attr="h" comment="LLF Project Plan" date="1244234584" name="LLF_System_Project_Plan.mpp" path="N:\3.5.3 Laser Launch Facility\LLF System Project Plan.mpp" size="243200" stream="N:\3.5.3 Laser Launch Facility\LLF System Project Plan.mpp" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_Nsquared_V3_0.xls" attr="h" comment="Interface N^2 Diagram" date="1244235010" name="NGAO_Nsquared_V3_0.xls" path="N:\3.3 System Engineering\NGAO_Nsquared_V3 0.xls" size="69120" stream="N:\3.3 System Engineering\NGAO_Nsquared_V3 0.xls" user="Main.JasonChin" version="1"

Revision 262009-06-02 - JasonChin

Line: 1 to 1
 
META TOPICPARENT name="WebHome"
NGAO Preliminary Design Phase
Line: 67 to 67
 

META FILEATTACHMENT attachment="K2_Laser_Removal_Plan.doc" attr="h" comment="Word Document describing tasks associated with removing the K2 laser" date="1234310927" name="K2_Laser_Removal_Plan.doc" path="H:\NGAO\K2 Laser Removal Plan.doc" size="3721728" stream="H:\NGAO\K2 Laser Removal Plan.doc" user="Main.JasonChin" version="1"
Changed:
<
<
META FILEATTACHMENT attachment="K2_Laser_Removal_v1.mpp" attr="h" comment="Project Plan associated with removing the K2 laser" date="1234310971" name="K2_Laser_Removal_v1.mpp" path="H:\NGAO\K2 Laser Removal v1.mpp" size="202240" stream="H:\NGAO\K2 Laser Removal v1.mpp" user="Main.JasonChin" version="1"
>
>
META FILEATTACHMENT attachment="K2_Laser_Removal_v1.mpp" attr="h" comment="Project Plan associated with removing the K2 laser" date="1243971145" name="K2_Laser_Removal_v1.mpp" path="N:\3.9 Integration and Test\K2 Laser Removal v1 entirety.mpp" size="271872" stream="N:\3.9 Integration and Test\K2 Laser Removal v1 entirety.mpp" user="Main.JasonChin" version="2"
 
META FILEATTACHMENT attachment="NGAO_Laser_to_Safety_System_Interface.pdf" attr="h" comment="" date="1234490284" name="NGAO_Laser_to_Safety_System_Interface.pdf" path="H:\NGAO\1.3.5.4 Safety System\NGAO Laser to Safety System Interface.pdf" size="120237" stream="H:\NGAO\1.3.5.4 Safety System\NGAO Laser to Safety System Interface.pdf" user="Main.JasonChin" version="1"
Changed:
<
<
META FILEATTACHMENT attachment="K2_Laser_Removal_Plan.pdf" attr="h" comment="" date="1234490312" name="K2_Laser_Removal_Plan.pdf" path="H:\NGAO\1.3.8 Integration and Test\K2 Laser Removal Plan.pdf" size="295336" stream="H:\NGAO\1.3.8 Integration and Test\K2 Laser Removal Plan.pdf" user="Main.JasonChin" version="1"
>
>
META FILEATTACHMENT attachment="K2_Laser_Removal_Plan.pdf" attr="h" comment="" date="1243971400" name="K2_Laser_Removal_Plan.pdf" path="N:\3.9 Integration and Test\K2 Laser Removal Plan v1_1.pdf" size="287212" stream="N:\3.9 Integration and Test\K2 Laser Removal Plan v1_1.pdf" user="Main.JasonChin" version="2"
 
META FILEATTACHMENT attachment="NGAO_Safety_System_Interface.pdf" attr="h" comment="Safety System Interfaces" date="1234899396" name="NGAO_Safety_System_Interface.pdf" path="H:\NGAO\1.3.5.4 Safety System\NGAO Safety System Interface.pdf" size="423008" stream="H:\NGAO\1.3.5.4 Safety System\NGAO Safety System Interface.pdf" user="Main.JasonChin" version="2"
META FILEATTACHMENT attachment="NGAO_Safety_System_Interface_Signals_v1_0.pdf" attr="h" comment="Spreadsheet of Safety System Signals" date="1241121284" name="NGAO_Safety_System_Interface_Signals_v1_0.pdf" path="H:\NGAO\3.3.5 Laser Safety System\13x-xx-xx_Safety System ICD.pdf" size="20248" stream="H:\NGAO\3.3.5 Laser Safety System\13x-xx-xx_Safety System ICD.pdf" user="Main.JasonChin" version="2"
META FILEATTACHMENT attachment="NGAO_Safety_System_Interlocks_v1_0.pdf" attr="h" comment="Safety System Interlocks" date="1234908165" name="NGAO_Safety_System_Interlocks_v1_0.pdf" path="H:\NGAO\1.3.5.4 Safety System\NGAO Safety System Interlocks v1_0.pdf" size="19894" stream="H:\NGAO\1.3.5.4 Safety System\NGAO Safety System Interlocks v1_0.pdf" user="Main.JasonChin" version="2"

Revision 252009-05-19 - JasonChin

Line: 1 to 1
 
META TOPICPARENT name="WebHome"
NGAO Preliminary Design Phase
Line: 26 to 26
 

WBS 3.5.1.1 Laser Enclosure Requirements

Changed:
<
<

WBS 3.5.3 Laser Launch Facility (Includes Beam Transport System)

>
>

WBS 3.5.3 Beam Transport System

 
Line: 41 to 41
 

Added:
>
>
 

WBS 3.5.5 Laser System Control

Line: 59 to 61
 
Changed:
<
<

Others

>
>

Other Supporting Documents

 
Added:
>
>
 
META FILEATTACHMENT attachment="K2_Laser_Removal_Plan.doc" attr="h" comment="Word Document describing tasks associated with removing the K2 laser" date="1234310927" name="K2_Laser_Removal_Plan.doc" path="H:\NGAO\K2 Laser Removal Plan.doc" size="3721728" stream="H:\NGAO\K2 Laser Removal Plan.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="K2_Laser_Removal_v1.mpp" attr="h" comment="Project Plan associated with removing the K2 laser" date="1234310971" name="K2_Laser_Removal_v1.mpp" path="H:\NGAO\K2 Laser Removal v1.mpp" size="202240" stream="H:\NGAO\K2 Laser Removal v1.mpp" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_Laser_to_Safety_System_Interface.pdf" attr="h" comment="" date="1234490284" name="NGAO_Laser_to_Safety_System_Interface.pdf" path="H:\NGAO\1.3.5.4 Safety System\NGAO Laser to Safety System Interface.pdf" size="120237" stream="H:\NGAO\1.3.5.4 Safety System\NGAO Laser to Safety System Interface.pdf" user="Main.JasonChin" version="1"
Line: 89 to 93
 
META FILEATTACHMENT attachment="NGAO_Safety_System_Test_Plan.doc" attr="h" comment="Laser Safety System Test Plan" date="1242238265" name="NGAO_Safety_System_Test_Plan.doc" path="N:\3.5.4 Laser Safety System\NGAO Safety System Test Plan.doc" size="291840" stream="N:\3.5.4 Laser Safety System\NGAO Safety System Test Plan.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_Operations_Support_Plan.doc" attr="h" comment="NGAO Operations Support Plan" date="1242420002" name="NGAO_Operations_Support_Plan.doc" path="N:\3.10 Operations Transition\NGAO Operations Support Plan.doc" size="421376" stream="N:\3.10 Operations Transition\NGAO Operations Support Plan.doc" user="Main.JasonChin" version="2"
META FILEATTACHMENT attachment="NGAO_Operations_Maintenance_Plan.doc" attr="h" comment="NGAO Operations Maintenance Plan" date="1242433449" name="NGAO_Operations_Maintenance_Plan.doc" path="N:\3.10 Operations Transition\NGAO Operations Maintenance Plan.doc" size="254976" stream="N:\3.10 Operations Transition\NGAO Operations Maintenance Plan.doc" user="Main.JasonChin" version="1"
Added:
>
>
META FILEATTACHMENT attachment="LCH_Laser_Registration_Form_(V5)_1MAY09.doc" attr="h" comment="Laser Clearing House Registration Form" date="1242762304" name="LCH_Laser_Registration_Form_(V5)_1MAY09.doc" path="N:\3.5.4 Laser Safety System\LCH\LCH Laser Registration Form (V5) 1MAY09.doc" size="511488" stream="N:\3.5.4 Laser Safety System\LCH\LCH Laser Registration Form (V5) 1MAY09.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_Laser_Clearing_House_Planning.doc" attr="h" comment="Laser Clearinghouse Planning PDR" date="1242762328" name="NGAO_Laser_Clearing_House_Planning.doc" path="N:\3.5.4 Laser Safety System\LCH\NGAO Laser Clearing House Planning.doc" size="343552" stream="N:\3.5.4 Laser Safety System\LCH\NGAO Laser Clearing House Planning.doc" user="Main.JasonChin" version="1"

Revision 242009-05-16 - JasonChin

Line: 1 to 1
 
META TOPICPARENT name="WebHome"
NGAO Preliminary Design Phase

Revision 232009-05-16 - JasonChin

Line: 1 to 1
 
META TOPICPARENT name="WebHome"
NGAO Preliminary Design Phase
Line: 55 to 55
 

WBS 3.10 Operations Handover

Changed:
<
<
>
>
 

Others

Line: 90 to 88
 
META FILEATTACHMENT attachment="NGAO_Guider_to_LGSF_ICD_v1.doc" attr="h" comment="NGAO Acquisition Guider System to LGSF ICD" date="1242183515" name="NGAO_Guider_to_LGSF_ICD_v1.doc" path="N:\3.3.6 Internal Interface\NGAO Guider to LGSF ICD v1.doc" size="291840" stream="N:\3.3.6 Internal Interface\NGAO Guider to LGSF ICD v1.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_Safety_System_Test_Plan.doc" attr="h" comment="Laser Safety System Test Plan" date="1242238265" name="NGAO_Safety_System_Test_Plan.doc" path="N:\3.5.4 Laser Safety System\NGAO Safety System Test Plan.doc" size="291840" stream="N:\3.5.4 Laser Safety System\NGAO Safety System Test Plan.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_Operations_Support_Plan.doc" attr="h" comment="NGAO Operations Support Plan" date="1242420002" name="NGAO_Operations_Support_Plan.doc" path="N:\3.10 Operations Transition\NGAO Operations Support Plan.doc" size="421376" stream="N:\3.10 Operations Transition\NGAO Operations Support Plan.doc" user="Main.JasonChin" version="2"
Added:
>
>
META FILEATTACHMENT attachment="NGAO_Operations_Maintenance_Plan.doc" attr="h" comment="NGAO Operations Maintenance Plan" date="1242433449" name="NGAO_Operations_Maintenance_Plan.doc" path="N:\3.10 Operations Transition\NGAO Operations Maintenance Plan.doc" size="254976" stream="N:\3.10 Operations Transition\NGAO Operations Maintenance Plan.doc" user="Main.JasonChin" version="1"

Revision 222009-05-15 - JasonChin

Line: 1 to 1
 
META TOPICPARENT name="WebHome"
NGAO Preliminary Design Phase
Line: 89 to 89
 
META FILEATTACHMENT attachment="NGAO_Telescope_to_LGSF_ICD_v1.doc" attr="h" comment="Telescope to LGSF ICD" date="1242183410" name="NGAO_Telescope_to_LGSF_ICD_v1.doc" path="N:\3.3.6 Internal Interface\NGAO Telescope to LGSF ICD v1.doc" size="233984" stream="N:\3.3.6 Internal Interface\NGAO Telescope to LGSF ICD v1.doc" user="Main.JasonChin" version="2"
META FILEATTACHMENT attachment="NGAO_Guider_to_LGSF_ICD_v1.doc" attr="h" comment="NGAO Acquisition Guider System to LGSF ICD" date="1242183515" name="NGAO_Guider_to_LGSF_ICD_v1.doc" path="N:\3.3.6 Internal Interface\NGAO Guider to LGSF ICD v1.doc" size="291840" stream="N:\3.3.6 Internal Interface\NGAO Guider to LGSF ICD v1.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_Safety_System_Test_Plan.doc" attr="h" comment="Laser Safety System Test Plan" date="1242238265" name="NGAO_Safety_System_Test_Plan.doc" path="N:\3.5.4 Laser Safety System\NGAO Safety System Test Plan.doc" size="291840" stream="N:\3.5.4 Laser Safety System\NGAO Safety System Test Plan.doc" user="Main.JasonChin" version="1"
Changed:
<
<
META FILEATTACHMENT attachment="NGAO_Operations_Support_Plan.doc" attr="h" comment="NGAO Operations Support Plan" date="1242350496" name="NGAO_Operations_Support_Plan.doc" path="N:\3.10 Operations Transition\NGAO Operations Support Plan.doc" size="312832" stream="N:\3.10 Operations Transition\NGAO Operations Support Plan.doc" user="Main.JasonChin" version="1"
>
>
META FILEATTACHMENT attachment="NGAO_Operations_Support_Plan.doc" attr="h" comment="NGAO Operations Support Plan" date="1242420002" name="NGAO_Operations_Support_Plan.doc" path="N:\3.10 Operations Transition\NGAO Operations Support Plan.doc" size="421376" stream="N:\3.10 Operations Transition\NGAO Operations Support Plan.doc" user="Main.JasonChin" version="2"

Revision 212009-05-15 - JasonChin

Line: 1 to 1
 
META TOPICPARENT name="WebHome"
NGAO Preliminary Design Phase
Line: 55 to 55
 

WBS 3.10 Operations Handover

Added:
>
>
 

Others

Line: 86 to 89
 
META FILEATTACHMENT attachment="NGAO_Telescope_to_LGSF_ICD_v1.doc" attr="h" comment="Telescope to LGSF ICD" date="1242183410" name="NGAO_Telescope_to_LGSF_ICD_v1.doc" path="N:\3.3.6 Internal Interface\NGAO Telescope to LGSF ICD v1.doc" size="233984" stream="N:\3.3.6 Internal Interface\NGAO Telescope to LGSF ICD v1.doc" user="Main.JasonChin" version="2"
META FILEATTACHMENT attachment="NGAO_Guider_to_LGSF_ICD_v1.doc" attr="h" comment="NGAO Acquisition Guider System to LGSF ICD" date="1242183515" name="NGAO_Guider_to_LGSF_ICD_v1.doc" path="N:\3.3.6 Internal Interface\NGAO Guider to LGSF ICD v1.doc" size="291840" stream="N:\3.3.6 Internal Interface\NGAO Guider to LGSF ICD v1.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_Safety_System_Test_Plan.doc" attr="h" comment="Laser Safety System Test Plan" date="1242238265" name="NGAO_Safety_System_Test_Plan.doc" path="N:\3.5.4 Laser Safety System\NGAO Safety System Test Plan.doc" size="291840" stream="N:\3.5.4 Laser Safety System\NGAO Safety System Test Plan.doc" user="Main.JasonChin" version="1"
Added:
>
>
META FILEATTACHMENT attachment="NGAO_Operations_Support_Plan.doc" attr="h" comment="NGAO Operations Support Plan" date="1242350496" name="NGAO_Operations_Support_Plan.doc" path="N:\3.10 Operations Transition\NGAO Operations Support Plan.doc" size="312832" stream="N:\3.10 Operations Transition\NGAO Operations Support Plan.doc" user="Main.JasonChin" version="1"

Revision 202009-05-13 - JasonChin

Line: 1 to 1
 
META TOPICPARENT name="WebHome"
NGAO Preliminary Design Phase
Line: 35 to 35
 
Changed:
<
<
>
>
 
Added:
>
>
 
Line: 88 to 85
 
META FILEATTACHMENT attachment="NGAO_LTCS_Modification_Preliiminary_Design_DS.doc" attr="h" comment="LTCS Modifications Preliminary Design" date="1242099405" name="NGAO_LTCS_Modification_Preliiminary_Design_DS.doc" path="N:\3.5.4.2 LTCS\NGAO LTCS Modification Preliiminary Design_DS.doc" size="208384" stream="N:\3.5.4.2 LTCS\NGAO LTCS Modification Preliiminary Design_DS.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_Telescope_to_LGSF_ICD_v1.doc" attr="h" comment="Telescope to LGSF ICD" date="1242183410" name="NGAO_Telescope_to_LGSF_ICD_v1.doc" path="N:\3.3.6 Internal Interface\NGAO Telescope to LGSF ICD v1.doc" size="233984" stream="N:\3.3.6 Internal Interface\NGAO Telescope to LGSF ICD v1.doc" user="Main.JasonChin" version="2"
META FILEATTACHMENT attachment="NGAO_Guider_to_LGSF_ICD_v1.doc" attr="h" comment="NGAO Acquisition Guider System to LGSF ICD" date="1242183515" name="NGAO_Guider_to_LGSF_ICD_v1.doc" path="N:\3.3.6 Internal Interface\NGAO Guider to LGSF ICD v1.doc" size="291840" stream="N:\3.3.6 Internal Interface\NGAO Guider to LGSF ICD v1.doc" user="Main.JasonChin" version="1"
Added:
>
>
META FILEATTACHMENT attachment="NGAO_Safety_System_Test_Plan.doc" attr="h" comment="Laser Safety System Test Plan" date="1242238265" name="NGAO_Safety_System_Test_Plan.doc" path="N:\3.5.4 Laser Safety System\NGAO Safety System Test Plan.doc" size="291840" stream="N:\3.5.4 Laser Safety System\NGAO Safety System Test Plan.doc" user="Main.JasonChin" version="1"

Revision 192009-05-13 - JasonChin

Line: 1 to 1
 
META TOPICPARENT name="WebHome"
NGAO Preliminary Design Phase
Line: 16 to 16
 

WBS 3.3.5 External Interfaces

Added:
>
>
 

WBS 3.3.6 Internal Interfaces

Line: 81 to 83
 
META FILEATTACHMENT attachment="NGAO_Safety_System_Preliiminary_Design.doc" attr="h" comment="Safety System Preliminary Design (Draft)" date="1241127294" name="NGAO_Safety_System_Preliiminary_Design.doc" path="H:\NGAO\3.3.5 Laser Safety System\NGAO Safety System Preliiminary Design.doc" size="1104384" stream="H:\NGAO\3.3.5 Laser Safety System\NGAO Safety System Preliiminary Design.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="LGS_FacilityTrans_WFE_Budgets_V0.1.xls" attr="" comment="Transmission and wavefront error budget" date="1241569023" name="LGS_FacilityTrans_WFE_Budgets_V0.1.xls" path="H:\NGAO\PreliminaryDesignPhase\LaserFacility\LGS_FacilityTrans_WFE_Budgets_V0.1.xls" size="31744" stream="H:\NGAO\PreliminaryDesignPhase\LaserFacility\LGS_FacilityTrans_WFE_Budgets_V0.1.xls" user="Main.ChrisNeyman" version="1"
META FILEATTACHMENT attachment="NGAO_LGSF_Training.doc" attr="" comment="Laser Guide Star Facility Training" date="1241813452" name="NGAO_LGSF_Training.doc" path="N:\3.10 Operations Transition\NGAO LGSF Training.doc" size="322560" stream="N:\3.10 Operations Transition\NGAO LGSF Training.doc" user="Main.JasonChin" version="1"
Changed:
<
<
META FILEATTACHMENT attachment="NGAO_AO_to_LGSF_ICD_v1.doc" attr="" comment="Adaptive Optics System to LGSF ICD" date="1241815615" name="NGAO_AO_to_LGSF_ICD_v1.doc" path="N:\3.3.6 Internal Interface\NGAO AO to LGSF ICD v1.doc" size="386048" stream="N:\3.3.6 Internal Interface\NGAO AO to LGSF ICD v1.doc" user="Main.JasonChin" version="2"
>
>
META FILEATTACHMENT attachment="NGAO_AO_to_LGSF_ICD_v1.doc" attr="h" comment="Adaptive Optics System to LGSF ICD" date="1242183475" name="NGAO_AO_to_LGSF_ICD_v1.doc" path="N:\3.3.6 Internal Interface\NGAO AO to LGSF ICD v1.doc" size="398848" stream="N:\3.3.6 Internal Interface\NGAO AO to LGSF ICD v1.doc" user="Main.JasonChin" version="3"
 
META FILEATTACHMENT attachment="NGAO_Operations_Transition_Handover_Criteria.doc" attr="" comment="Operations Transition Success Criteria" date="1241813553" name="NGAO_Operations_Transition_Handover_Criteria.doc" path="N:\3.10 Operations Transition\NGAO Operations Transition Handover Criteria.doc" size="166400" stream="N:\3.10 Operations Transition\NGAO Operations Transition Handover Criteria.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_LTCS_Modification_Preliiminary_Design_DS.doc" attr="h" comment="LTCS Modifications Preliminary Design" date="1242099405" name="NGAO_LTCS_Modification_Preliiminary_Design_DS.doc" path="N:\3.5.4.2 LTCS\NGAO LTCS Modification Preliiminary Design_DS.doc" size="208384" stream="N:\3.5.4.2 LTCS\NGAO LTCS Modification Preliiminary Design_DS.doc" user="Main.JasonChin" version="1"
Changed:
<
<
META FILEATTACHMENT attachment="NGAO_Telescope_to_LGSF_ICD_v1.doc" attr="h" comment="Telescope to LGSF ICD" date="1242161547" name="NGAO_Telescope_to_LGSF_ICD_v1.doc" path="N:\3.3.6 Internal Interface\NGAO Telescope to LGSF ICD v1.doc" size="234496" stream="N:\3.3.6 Internal Interface\NGAO Telescope to LGSF ICD v1.doc" user="Main.JasonChin" version="1"
>
>
META FILEATTACHMENT attachment="NGAO_Telescope_to_LGSF_ICD_v1.doc" attr="h" comment="Telescope to LGSF ICD" date="1242183410" name="NGAO_Telescope_to_LGSF_ICD_v1.doc" path="N:\3.3.6 Internal Interface\NGAO Telescope to LGSF ICD v1.doc" size="233984" stream="N:\3.3.6 Internal Interface\NGAO Telescope to LGSF ICD v1.doc" user="Main.JasonChin" version="2"
META FILEATTACHMENT attachment="NGAO_Guider_to_LGSF_ICD_v1.doc" attr="h" comment="NGAO Acquisition Guider System to LGSF ICD" date="1242183515" name="NGAO_Guider_to_LGSF_ICD_v1.doc" path="N:\3.3.6 Internal Interface\NGAO Guider to LGSF ICD v1.doc" size="291840" stream="N:\3.3.6 Internal Interface\NGAO Guider to LGSF ICD v1.doc" user="Main.JasonChin" version="1"

Revision 182009-05-12 - JasonChin

Line: 1 to 1
 
META TOPICPARENT name="WebHome"
NGAO Preliminary Design Phase
Line: 15 to 15
 

WBS 3.3.5 External Interfaces

Added:
>
>
 

WBS 3.3.6 Internal Interfaces

WBS 3.5 Laser System Design

Line: 82 to 84
 
META FILEATTACHMENT attachment="NGAO_AO_to_LGSF_ICD_v1.doc" attr="" comment="Adaptive Optics System to LGSF ICD" date="1241815615" name="NGAO_AO_to_LGSF_ICD_v1.doc" path="N:\3.3.6 Internal Interface\NGAO AO to LGSF ICD v1.doc" size="386048" stream="N:\3.3.6 Internal Interface\NGAO AO to LGSF ICD v1.doc" user="Main.JasonChin" version="2"
META FILEATTACHMENT attachment="NGAO_Operations_Transition_Handover_Criteria.doc" attr="" comment="Operations Transition Success Criteria" date="1241813553" name="NGAO_Operations_Transition_Handover_Criteria.doc" path="N:\3.10 Operations Transition\NGAO Operations Transition Handover Criteria.doc" size="166400" stream="N:\3.10 Operations Transition\NGAO Operations Transition Handover Criteria.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_LTCS_Modification_Preliiminary_Design_DS.doc" attr="h" comment="LTCS Modifications Preliminary Design" date="1242099405" name="NGAO_LTCS_Modification_Preliiminary_Design_DS.doc" path="N:\3.5.4.2 LTCS\NGAO LTCS Modification Preliiminary Design_DS.doc" size="208384" stream="N:\3.5.4.2 LTCS\NGAO LTCS Modification Preliiminary Design_DS.doc" user="Main.JasonChin" version="1"
Added:
>
>
META FILEATTACHMENT attachment="NGAO_Telescope_to_LGSF_ICD_v1.doc" attr="h" comment="Telescope to LGSF ICD" date="1242161547" name="NGAO_Telescope_to_LGSF_ICD_v1.doc" path="N:\3.3.6 Internal Interface\NGAO Telescope to LGSF ICD v1.doc" size="234496" stream="N:\3.3.6 Internal Interface\NGAO Telescope to LGSF ICD v1.doc" user="Main.JasonChin" version="1"

Revision 172009-05-12 - JasonChin

Line: 1 to 1
 
META TOPICPARENT name="WebHome"
NGAO Preliminary Design Phase
Line: 35 to 35
 
Added:
>
>
 

WBS 3.5.5 Laser System Control

WBS 1.3.5.5.1 Laser System Control Software

Line: 77 to 81
 
META FILEATTACHMENT attachment="NGAO_LGSF_Training.doc" attr="" comment="Laser Guide Star Facility Training" date="1241813452" name="NGAO_LGSF_Training.doc" path="N:\3.10 Operations Transition\NGAO LGSF Training.doc" size="322560" stream="N:\3.10 Operations Transition\NGAO LGSF Training.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_AO_to_LGSF_ICD_v1.doc" attr="" comment="Adaptive Optics System to LGSF ICD" date="1241815615" name="NGAO_AO_to_LGSF_ICD_v1.doc" path="N:\3.3.6 Internal Interface\NGAO AO to LGSF ICD v1.doc" size="386048" stream="N:\3.3.6 Internal Interface\NGAO AO to LGSF ICD v1.doc" user="Main.JasonChin" version="2"
META FILEATTACHMENT attachment="NGAO_Operations_Transition_Handover_Criteria.doc" attr="" comment="Operations Transition Success Criteria" date="1241813553" name="NGAO_Operations_Transition_Handover_Criteria.doc" path="N:\3.10 Operations Transition\NGAO Operations Transition Handover Criteria.doc" size="166400" stream="N:\3.10 Operations Transition\NGAO Operations Transition Handover Criteria.doc" user="Main.JasonChin" version="1"
Added:
>
>
META FILEATTACHMENT attachment="NGAO_LTCS_Modification_Preliiminary_Design_DS.doc" attr="h" comment="LTCS Modifications Preliminary Design" date="1242099405" name="NGAO_LTCS_Modification_Preliiminary_Design_DS.doc" path="N:\3.5.4.2 LTCS\NGAO LTCS Modification Preliiminary Design_DS.doc" size="208384" stream="N:\3.5.4.2 LTCS\NGAO LTCS Modification Preliiminary Design_DS.doc" user="Main.JasonChin" version="1"

Revision 162009-05-08 - JasonChin

Line: 1 to 1
 
META TOPICPARENT name="WebHome"
NGAO Preliminary Design Phase
Line: 11 to 11
 

Useful Information

Added:
>
>

WBS 3.3 System Engineering

 
Added:
>
>

WBS 3.3.5 External Interfaces

WBS 3.3.6 Internal Interfaces

 

WBS 3.5 Laser System Design

WBS 3.5.1 Laser Enclosure

Line: 42 to 47
 

WBS 3.10 Operations Handover

Added:
>
>
 

Others

Line: 65 to 74
 
META FILEATTACHMENT attachment="Environmental_and_Power_Control_Monitoring.pdf" attr="" comment="Environmental and Power Control and Monitoring System" date="1239407593" name="Environmental_and_Power_Control_Monitoring.pdf" path="H:\NGAO\3.2.4.2_NonRealTimeContrElect\Environmental Control and Monitoring.pdf" size="134156" stream="H:\NGAO\3.2.4.2_NonRealTimeContrElect\Environmental Control and Monitoring.pdf" user="Main.JasonChin" version="2"
META FILEATTACHMENT attachment="NGAO_Safety_System_Preliiminary_Design.doc" attr="h" comment="Safety System Preliminary Design (Draft)" date="1241127294" name="NGAO_Safety_System_Preliiminary_Design.doc" path="H:\NGAO\3.3.5 Laser Safety System\NGAO Safety System Preliiminary Design.doc" size="1104384" stream="H:\NGAO\3.3.5 Laser Safety System\NGAO Safety System Preliiminary Design.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="LGS_FacilityTrans_WFE_Budgets_V0.1.xls" attr="" comment="Transmission and wavefront error budget" date="1241569023" name="LGS_FacilityTrans_WFE_Budgets_V0.1.xls" path="H:\NGAO\PreliminaryDesignPhase\LaserFacility\LGS_FacilityTrans_WFE_Budgets_V0.1.xls" size="31744" stream="H:\NGAO\PreliminaryDesignPhase\LaserFacility\LGS_FacilityTrans_WFE_Budgets_V0.1.xls" user="Main.ChrisNeyman" version="1"
Added:
>
>
META FILEATTACHMENT attachment="NGAO_LGSF_Training.doc" attr="" comment="Laser Guide Star Facility Training" date="1241813452" name="NGAO_LGSF_Training.doc" path="N:\3.10 Operations Transition\NGAO LGSF Training.doc" size="322560" stream="N:\3.10 Operations Transition\NGAO LGSF Training.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_AO_to_LGSF_ICD_v1.doc" attr="" comment="Adaptive Optics System to LGSF ICD" date="1241815615" name="NGAO_AO_to_LGSF_ICD_v1.doc" path="N:\3.3.6 Internal Interface\NGAO AO to LGSF ICD v1.doc" size="386048" stream="N:\3.3.6 Internal Interface\NGAO AO to LGSF ICD v1.doc" user="Main.JasonChin" version="2"
META FILEATTACHMENT attachment="NGAO_Operations_Transition_Handover_Criteria.doc" attr="" comment="Operations Transition Success Criteria" date="1241813553" name="NGAO_Operations_Transition_Handover_Criteria.doc" path="N:\3.10 Operations Transition\NGAO Operations Transition Handover Criteria.doc" size="166400" stream="N:\3.10 Operations Transition\NGAO Operations Transition Handover Criteria.doc" user="Main.JasonChin" version="1"

Revision 152009-05-06 - JasonChin

Line: 1 to 1
 
META TOPICPARENT name="WebHome"
NGAO Preliminary Design Phase
Line: 41 to 41
 
Added:
>
>

WBS 3.10 Operations Handover

 

Others

Revision 142009-05-06 - ChrisNeyman

Line: 1 to 1
 
META TOPICPARENT name="WebHome"
NGAO Preliminary Design Phase
Line: 8 to 8
 
Added:
>
>

Useful Information

 

WBS 3.5 Laser System Design

Line: 15 to 18
 

WBS 3.5.1.1 Laser Enclosure Requirements

Changed:
<
<

WBS 3.5.3 Laser Launch Facility

>
>

WBS 3.5.3 Laser Launch Facility (Includes Beam Transport System)

 
Line: 59 to 62
 
META FILEATTACHMENT attachment="NGAO_LTA_Installation_Plan.pdf" attr="h" comment="Laser Launch Telescope Installation Plan" date="1236394168" name="NGAO_LTA_Installation_Plan.pdf" path="T:\NGAO\1.3.5.3 Laser Launch Facility\NGAO LTA Installation Plan.pdf" size="593990" stream="T:\NGAO\1.3.5.3 Laser Launch Facility\NGAO LTA Installation Plan.pdf" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="Environmental_and_Power_Control_Monitoring.pdf" attr="" comment="Environmental and Power Control and Monitoring System" date="1239407593" name="Environmental_and_Power_Control_Monitoring.pdf" path="H:\NGAO\3.2.4.2_NonRealTimeContrElect\Environmental Control and Monitoring.pdf" size="134156" stream="H:\NGAO\3.2.4.2_NonRealTimeContrElect\Environmental Control and Monitoring.pdf" user="Main.JasonChin" version="2"
META FILEATTACHMENT attachment="NGAO_Safety_System_Preliiminary_Design.doc" attr="h" comment="Safety System Preliminary Design (Draft)" date="1241127294" name="NGAO_Safety_System_Preliiminary_Design.doc" path="H:\NGAO\3.3.5 Laser Safety System\NGAO Safety System Preliiminary Design.doc" size="1104384" stream="H:\NGAO\3.3.5 Laser Safety System\NGAO Safety System Preliiminary Design.doc" user="Main.JasonChin" version="1"
Added:
>
>
META FILEATTACHMENT attachment="LGS_FacilityTrans_WFE_Budgets_V0.1.xls" attr="" comment="Transmission and wavefront error budget" date="1241569023" name="LGS_FacilityTrans_WFE_Budgets_V0.1.xls" path="H:\NGAO\PreliminaryDesignPhase\LaserFacility\LGS_FacilityTrans_WFE_Budgets_V0.1.xls" size="31744" stream="H:\NGAO\PreliminaryDesignPhase\LaserFacility\LGS_FacilityTrans_WFE_Budgets_V0.1.xls" user="Main.ChrisNeyman" version="1"

Revision 132009-04-30 - JasonChin

Line: 1 to 1
 
META TOPICPARENT name="WebHome"
NGAO Preliminary Design Phase
Line: 21 to 21
 

WBS 3.5.4 Safety System Design

Added:
>
>
 
Line: 56 to 58
 
META FILEATTACHMENT attachment="NGAO_LLF_constraints_at_Prime_Focus.pdf" attr="h" comment="Laser Launch Facility Constraints at Prime Focus" date="1236394144" name="NGAO_LLF_constraints_at_Prime_Focus.pdf" path="T:\NGAO\1.3.5.3 Laser Launch Facility\NGAO LLF constraints at Prime Focus.pdf" size="229021" stream="T:\NGAO\1.3.5.3 Laser Launch Facility\NGAO LLF constraints at Prime Focus.pdf" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_LTA_Installation_Plan.pdf" attr="h" comment="Laser Launch Telescope Installation Plan" date="1236394168" name="NGAO_LTA_Installation_Plan.pdf" path="T:\NGAO\1.3.5.3 Laser Launch Facility\NGAO LTA Installation Plan.pdf" size="593990" stream="T:\NGAO\1.3.5.3 Laser Launch Facility\NGAO LTA Installation Plan.pdf" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="Environmental_and_Power_Control_Monitoring.pdf" attr="" comment="Environmental and Power Control and Monitoring System" date="1239407593" name="Environmental_and_Power_Control_Monitoring.pdf" path="H:\NGAO\3.2.4.2_NonRealTimeContrElect\Environmental Control and Monitoring.pdf" size="134156" stream="H:\NGAO\3.2.4.2_NonRealTimeContrElect\Environmental Control and Monitoring.pdf" user="Main.JasonChin" version="2"
Added:
>
>
META FILEATTACHMENT attachment="NGAO_Safety_System_Preliiminary_Design.doc" attr="h" comment="Safety System Preliminary Design (Draft)" date="1241127294" name="NGAO_Safety_System_Preliiminary_Design.doc" path="H:\NGAO\3.3.5 Laser Safety System\NGAO Safety System Preliiminary Design.doc" size="1104384" stream="H:\NGAO\3.3.5 Laser Safety System\NGAO Safety System Preliiminary Design.doc" user="Main.JasonChin" version="1"

Revision 122009-04-30 - JasonChin

Line: 1 to 1
 
META TOPICPARENT name="WebHome"
NGAO Preliminary Design Phase
Line: 45 to 45
 
META FILEATTACHMENT attachment="NGAO_Laser_to_Safety_System_Interface.pdf" attr="h" comment="" date="1234490284" name="NGAO_Laser_to_Safety_System_Interface.pdf" path="H:\NGAO\1.3.5.4 Safety System\NGAO Laser to Safety System Interface.pdf" size="120237" stream="H:\NGAO\1.3.5.4 Safety System\NGAO Laser to Safety System Interface.pdf" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="K2_Laser_Removal_Plan.pdf" attr="h" comment="" date="1234490312" name="K2_Laser_Removal_Plan.pdf" path="H:\NGAO\1.3.8 Integration and Test\K2 Laser Removal Plan.pdf" size="295336" stream="H:\NGAO\1.3.8 Integration and Test\K2 Laser Removal Plan.pdf" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_Safety_System_Interface.pdf" attr="h" comment="Safety System Interfaces" date="1234899396" name="NGAO_Safety_System_Interface.pdf" path="H:\NGAO\1.3.5.4 Safety System\NGAO Safety System Interface.pdf" size="423008" stream="H:\NGAO\1.3.5.4 Safety System\NGAO Safety System Interface.pdf" user="Main.JasonChin" version="2"
Changed:
<
<
META FILEATTACHMENT attachment="NGAO_Safety_System_Interface_Signals_v1_0.pdf" attr="h" comment="Spreadsheet of Safety System Signals" date="1234899433" name="NGAO_Safety_System_Interface_Signals_v1_0.pdf" path="H:\NGAO\1.3.5.4 Safety System\NGAO Safety System Interface Signals v1_0.pdf" size="33928" stream="H:\NGAO\1.3.5.4 Safety System\NGAO Safety System Interface Signals v1_0.pdf" user="Main.JasonChin" version="1"
>
>
META FILEATTACHMENT attachment="NGAO_Safety_System_Interface_Signals_v1_0.pdf" attr="h" comment="Spreadsheet of Safety System Signals" date="1241121284" name="NGAO_Safety_System_Interface_Signals_v1_0.pdf" path="H:\NGAO\3.3.5 Laser Safety System\13x-xx-xx_Safety System ICD.pdf" size="20248" stream="H:\NGAO\3.3.5 Laser Safety System\13x-xx-xx_Safety System ICD.pdf" user="Main.JasonChin" version="2"
 
META FILEATTACHMENT attachment="NGAO_Safety_System_Interlocks_v1_0.pdf" attr="h" comment="Safety System Interlocks" date="1234908165" name="NGAO_Safety_System_Interlocks_v1_0.pdf" path="H:\NGAO\1.3.5.4 Safety System\NGAO Safety System Interlocks v1_0.pdf" size="19894" stream="H:\NGAO\1.3.5.4 Safety System\NGAO Safety System Interlocks v1_0.pdf" user="Main.JasonChin" version="2"
META FILEATTACHMENT attachment="LaserSystemControlSequencer.doc" attr="h" comment="Laser System Control Sequencer" date="1235529810" name="LaserSystemControlSequencer.doc" path="T:\NGAO\3.3.6 Laser Control System\LaserSystemControlSequencer.doc" size="548352" stream="T:\NGAO\3.3.6 Laser Control System\LaserSystemControlSequencer.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="LaserSystemControlSequencer.pdf" attr="h" comment="Laser System Control Sequencers" date="1235529931" name="LaserSystemControlSequencer.pdf" path="T:\NGAO\3.3.6 Laser Control System\LaserSystemControlSequencer.pdf" size="227368" stream="T:\NGAO\3.3.6 Laser Control System\LaserSystemControlSequencer.pdf" user="Main.JasonChin" version="1"

Revision 112009-04-10 - JasonChin

Line: 1 to 1
 
META TOPICPARENT name="WebHome"
NGAO Preliminary Design Phase
Line: 38 to 38
 

Others

Changed:
<
<
>
>
 
META FILEATTACHMENT attachment="K2_Laser_Removal_Plan.doc" attr="h" comment="Word Document describing tasks associated with removing the K2 laser" date="1234310927" name="K2_Laser_Removal_Plan.doc" path="H:\NGAO\K2 Laser Removal Plan.doc" size="3721728" stream="H:\NGAO\K2 Laser Removal Plan.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="K2_Laser_Removal_v1.mpp" attr="h" comment="Project Plan associated with removing the K2 laser" date="1234310971" name="K2_Laser_Removal_v1.mpp" path="H:\NGAO\K2 Laser Removal v1.mpp" size="202240" stream="H:\NGAO\K2 Laser Removal v1.mpp" user="Main.JasonChin" version="1"
Line: 55 to 55
 
META FILEATTACHMENT attachment="NGAO_F-15_Module_LLF_Supports_Installation_Plan.pdf" attr="h" comment="F/15 Module Supports Installation Plan" date="1236394117" name="NGAO_F-15_Module_LLF_Supports_Installation_Plan.pdf" path="T:\NGAO\1.3.5.3 Laser Launch Facility\NGAO F-15 Module LLF Supports Installation Plan.pdf" size="38176" stream="T:\NGAO\1.3.5.3 Laser Launch Facility\NGAO F-15 Module LLF Supports Installation Plan.pdf" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_LLF_constraints_at_Prime_Focus.pdf" attr="h" comment="Laser Launch Facility Constraints at Prime Focus" date="1236394144" name="NGAO_LLF_constraints_at_Prime_Focus.pdf" path="T:\NGAO\1.3.5.3 Laser Launch Facility\NGAO LLF constraints at Prime Focus.pdf" size="229021" stream="T:\NGAO\1.3.5.3 Laser Launch Facility\NGAO LLF constraints at Prime Focus.pdf" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_LTA_Installation_Plan.pdf" attr="h" comment="Laser Launch Telescope Installation Plan" date="1236394168" name="NGAO_LTA_Installation_Plan.pdf" path="T:\NGAO\1.3.5.3 Laser Launch Facility\NGAO LTA Installation Plan.pdf" size="593990" stream="T:\NGAO\1.3.5.3 Laser Launch Facility\NGAO LTA Installation Plan.pdf" user="Main.JasonChin" version="1"
Changed:
<
<
META FILEATTACHMENT attachment="Environmental_and_Power_Control_Monitoring.pdf" attr="" comment="Environmental and Power Control and Monitoring System" date="1239069993" name="Environmental_and_Power_Control_Monitoring.pdf" path="H:\NGAO\3.2.4.2_NonRealTimeContrElect\Environmental and Power Control Monitoring.pdf" size="134386" stream="H:\NGAO\3.2.4.2_NonRealTimeContrElect\Environmental and Power Control Monitoring.pdf" user="Main.JasonChin" version="1"
>
>
META FILEATTACHMENT attachment="Environmental_and_Power_Control_Monitoring.pdf" attr="" comment="Environmental and Power Control and Monitoring System" date="1239407593" name="Environmental_and_Power_Control_Monitoring.pdf" path="H:\NGAO\3.2.4.2_NonRealTimeContrElect\Environmental Control and Monitoring.pdf" size="134156" stream="H:\NGAO\3.2.4.2_NonRealTimeContrElect\Environmental Control and Monitoring.pdf" user="Main.JasonChin" version="2"

Revision 102009-04-07 - JasonChin

Line: 1 to 1
 
META TOPICPARENT name="WebHome"
NGAO Preliminary Design Phase
Line: 37 to 37
 
Changed:
<
<
>
>

Others

 
META FILEATTACHMENT attachment="K2_Laser_Removal_Plan.doc" attr="h" comment="Word Document describing tasks associated with removing the K2 laser" date="1234310927" name="K2_Laser_Removal_Plan.doc" path="H:\NGAO\K2 Laser Removal Plan.doc" size="3721728" stream="H:\NGAO\K2 Laser Removal Plan.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="K2_Laser_Removal_v1.mpp" attr="h" comment="Project Plan associated with removing the K2 laser" date="1234310971" name="K2_Laser_Removal_v1.mpp" path="H:\NGAO\K2 Laser Removal v1.mpp" size="202240" stream="H:\NGAO\K2 Laser Removal v1.mpp" user="Main.JasonChin" version="1"
Line: 54 to 55
 
META FILEATTACHMENT attachment="NGAO_F-15_Module_LLF_Supports_Installation_Plan.pdf" attr="h" comment="F/15 Module Supports Installation Plan" date="1236394117" name="NGAO_F-15_Module_LLF_Supports_Installation_Plan.pdf" path="T:\NGAO\1.3.5.3 Laser Launch Facility\NGAO F-15 Module LLF Supports Installation Plan.pdf" size="38176" stream="T:\NGAO\1.3.5.3 Laser Launch Facility\NGAO F-15 Module LLF Supports Installation Plan.pdf" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_LLF_constraints_at_Prime_Focus.pdf" attr="h" comment="Laser Launch Facility Constraints at Prime Focus" date="1236394144" name="NGAO_LLF_constraints_at_Prime_Focus.pdf" path="T:\NGAO\1.3.5.3 Laser Launch Facility\NGAO LLF constraints at Prime Focus.pdf" size="229021" stream="T:\NGAO\1.3.5.3 Laser Launch Facility\NGAO LLF constraints at Prime Focus.pdf" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_LTA_Installation_Plan.pdf" attr="h" comment="Laser Launch Telescope Installation Plan" date="1236394168" name="NGAO_LTA_Installation_Plan.pdf" path="T:\NGAO\1.3.5.3 Laser Launch Facility\NGAO LTA Installation Plan.pdf" size="593990" stream="T:\NGAO\1.3.5.3 Laser Launch Facility\NGAO LTA Installation Plan.pdf" user="Main.JasonChin" version="1"
Added:
>
>
META FILEATTACHMENT attachment="Environmental_and_Power_Control_Monitoring.pdf" attr="" comment="Environmental and Power Control and Monitoring System" date="1239069993" name="Environmental_and_Power_Control_Monitoring.pdf" path="H:\NGAO\3.2.4.2_NonRealTimeContrElect\Environmental and Power Control Monitoring.pdf" size="134386" stream="H:\NGAO\3.2.4.2_NonRealTimeContrElect\Environmental and Power Control Monitoring.pdf" user="Main.JasonChin" version="1"

Revision 92009-03-07 - JasonChin

Line: 1 to 1
 
META TOPICPARENT name="WebHome"
NGAO Preliminary Design Phase
Line: 15 to 15
 

WBS 3.5.1.1 Laser Enclosure Requirements

Added:
>
>

WBS 3.5.3 Laser Launch Facility

 

WBS 3.5.4 Safety System Design

Line: 47 to 51
 
META FILEATTACHMENT attachment="Laser_Enclosure_Requirements_Review.doc" attr="h" comment="Review of Laser Enclosure Requirement PD Phase" date="1235612429" name="Laser_Enclosure_Requirements_Review.doc" path="T:\NGAO\3.3.2 Enclosure\Laser Enclosure Requirements Review.doc" size="522752" stream="T:\NGAO\3.3.2 Enclosure\Laser Enclosure Requirements Review.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="Laser_Enclosure_Requirements_Review.pdf" attr="h" comment="Laser Enclosure Requirements Review PD Phase" date="1235615627" name="Laser_Enclosure_Requirements_Review.pdf" path="T:\NGAO\3.3.2 Enclosure\Laser Enclosure Requirements Review.pdf" size="375572" stream="T:\NGAO\3.3.2 Enclosure\Laser Enclosure Requirements Review.pdf" user="Main.JasonChin" version="3"
META FILEATTACHMENT attachment="NGAO_Safety_System_Shutters.pdf" attr="" comment="Description of Safety Shutter Layout for NGAO Safety System" date="1236369626" name="NGAO_Safety_System_Shutters.pdf" path="T:\NGAO\1.3.5.4 Safety System\NGAO Safety System Shutters.pdf" size="170823" stream="T:\NGAO\1.3.5.4 Safety System\NGAO Safety System Shutters.pdf" user="Main.JasonChin" version="1"
Added:
>
>
META FILEATTACHMENT attachment="NGAO_F-15_Module_LLF_Supports_Installation_Plan.pdf" attr="h" comment="F/15 Module Supports Installation Plan" date="1236394117" name="NGAO_F-15_Module_LLF_Supports_Installation_Plan.pdf" path="T:\NGAO\1.3.5.3 Laser Launch Facility\NGAO F-15 Module LLF Supports Installation Plan.pdf" size="38176" stream="T:\NGAO\1.3.5.3 Laser Launch Facility\NGAO F-15 Module LLF Supports Installation Plan.pdf" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_LLF_constraints_at_Prime_Focus.pdf" attr="h" comment="Laser Launch Facility Constraints at Prime Focus" date="1236394144" name="NGAO_LLF_constraints_at_Prime_Focus.pdf" path="T:\NGAO\1.3.5.3 Laser Launch Facility\NGAO LLF constraints at Prime Focus.pdf" size="229021" stream="T:\NGAO\1.3.5.3 Laser Launch Facility\NGAO LLF constraints at Prime Focus.pdf" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_LTA_Installation_Plan.pdf" attr="h" comment="Laser Launch Telescope Installation Plan" date="1236394168" name="NGAO_LTA_Installation_Plan.pdf" path="T:\NGAO\1.3.5.3 Laser Launch Facility\NGAO LTA Installation Plan.pdf" size="593990" stream="T:\NGAO\1.3.5.3 Laser Launch Facility\NGAO LTA Installation Plan.pdf" user="Main.JasonChin" version="1"

Revision 82009-03-06 - JasonChin

Line: 1 to 1
 
META TOPICPARENT name="WebHome"
NGAO Preliminary Design Phase
Line: 21 to 21
 
Changed:
<
<
>
>
 

WBS 3.5.5 Laser System Control

WBS 1.3.5.5.1 Laser System Control Software

Line: 44 to 46
 
META FILEATTACHMENT attachment="LaserSystemControlSequencer.pdf" attr="h" comment="Laser System Control Sequencers" date="1235529931" name="LaserSystemControlSequencer.pdf" path="T:\NGAO\3.3.6 Laser Control System\LaserSystemControlSequencer.pdf" size="227368" stream="T:\NGAO\3.3.6 Laser Control System\LaserSystemControlSequencer.pdf" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="Laser_Enclosure_Requirements_Review.doc" attr="h" comment="Review of Laser Enclosure Requirement PD Phase" date="1235612429" name="Laser_Enclosure_Requirements_Review.doc" path="T:\NGAO\3.3.2 Enclosure\Laser Enclosure Requirements Review.doc" size="522752" stream="T:\NGAO\3.3.2 Enclosure\Laser Enclosure Requirements Review.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="Laser_Enclosure_Requirements_Review.pdf" attr="h" comment="Laser Enclosure Requirements Review PD Phase" date="1235615627" name="Laser_Enclosure_Requirements_Review.pdf" path="T:\NGAO\3.3.2 Enclosure\Laser Enclosure Requirements Review.pdf" size="375572" stream="T:\NGAO\3.3.2 Enclosure\Laser Enclosure Requirements Review.pdf" user="Main.JasonChin" version="3"
Added:
>
>
META FILEATTACHMENT attachment="NGAO_Safety_System_Shutters.pdf" attr="" comment="Description of Safety Shutter Layout for NGAO Safety System" date="1236369626" name="NGAO_Safety_System_Shutters.pdf" path="T:\NGAO\1.3.5.4 Safety System\NGAO Safety System Shutters.pdf" size="170823" stream="T:\NGAO\1.3.5.4 Safety System\NGAO Safety System Shutters.pdf" user="Main.JasonChin" version="1"

Revision 72009-02-26 - JasonChin

Line: 1 to 1
 
META TOPICPARENT name="WebHome"
NGAO Preliminary Design Phase
Line: 11 to 11
 

WBS 3.5 Laser System Design

Added:
>
>

WBS 3.5.1 Laser Enclosure

WBS 3.5.1.1 Laser Enclosure Requirements

 

WBS 3.5.4 Safety System Design

Line: 38 to 42
 
META FILEATTACHMENT attachment="NGAO_Safety_System_Interlocks_v1_0.pdf" attr="h" comment="Safety System Interlocks" date="1234908165" name="NGAO_Safety_System_Interlocks_v1_0.pdf" path="H:\NGAO\1.3.5.4 Safety System\NGAO Safety System Interlocks v1_0.pdf" size="19894" stream="H:\NGAO\1.3.5.4 Safety System\NGAO Safety System Interlocks v1_0.pdf" user="Main.JasonChin" version="2"
META FILEATTACHMENT attachment="LaserSystemControlSequencer.doc" attr="h" comment="Laser System Control Sequencer" date="1235529810" name="LaserSystemControlSequencer.doc" path="T:\NGAO\3.3.6 Laser Control System\LaserSystemControlSequencer.doc" size="548352" stream="T:\NGAO\3.3.6 Laser Control System\LaserSystemControlSequencer.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="LaserSystemControlSequencer.pdf" attr="h" comment="Laser System Control Sequencers" date="1235529931" name="LaserSystemControlSequencer.pdf" path="T:\NGAO\3.3.6 Laser Control System\LaserSystemControlSequencer.pdf" size="227368" stream="T:\NGAO\3.3.6 Laser Control System\LaserSystemControlSequencer.pdf" user="Main.JasonChin" version="1"
Added:
>
>
META FILEATTACHMENT attachment="Laser_Enclosure_Requirements_Review.doc" attr="h" comment="Review of Laser Enclosure Requirement PD Phase" date="1235612429" name="Laser_Enclosure_Requirements_Review.doc" path="T:\NGAO\3.3.2 Enclosure\Laser Enclosure Requirements Review.doc" size="522752" stream="T:\NGAO\3.3.2 Enclosure\Laser Enclosure Requirements Review.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="Laser_Enclosure_Requirements_Review.pdf" attr="h" comment="Laser Enclosure Requirements Review PD Phase" date="1235615627" name="Laser_Enclosure_Requirements_Review.pdf" path="T:\NGAO\3.3.2 Enclosure\Laser Enclosure Requirements Review.pdf" size="375572" stream="T:\NGAO\3.3.2 Enclosure\Laser Enclosure Requirements Review.pdf" user="Main.JasonChin" version="3"

Revision 62009-02-25 - JasonChin

Line: 1 to 1
 
META TOPICPARENT name="WebHome"
NGAO Preliminary Design Phase
Line: 17 to 17
 
Added:
>
>

WBS 3.5.5 Laser System Control

WBS 1.3.5.5.1 Laser System Control Software

 

WBS 3.8 Telescope integration & Test

WBS 3.8.1.2 K2 Laser Removal

Line: 31 to 36
 
META FILEATTACHMENT attachment="NGAO_Safety_System_Interface.pdf" attr="h" comment="Safety System Interfaces" date="1234899396" name="NGAO_Safety_System_Interface.pdf" path="H:\NGAO\1.3.5.4 Safety System\NGAO Safety System Interface.pdf" size="423008" stream="H:\NGAO\1.3.5.4 Safety System\NGAO Safety System Interface.pdf" user="Main.JasonChin" version="2"
META FILEATTACHMENT attachment="NGAO_Safety_System_Interface_Signals_v1_0.pdf" attr="h" comment="Spreadsheet of Safety System Signals" date="1234899433" name="NGAO_Safety_System_Interface_Signals_v1_0.pdf" path="H:\NGAO\1.3.5.4 Safety System\NGAO Safety System Interface Signals v1_0.pdf" size="33928" stream="H:\NGAO\1.3.5.4 Safety System\NGAO Safety System Interface Signals v1_0.pdf" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_Safety_System_Interlocks_v1_0.pdf" attr="h" comment="Safety System Interlocks" date="1234908165" name="NGAO_Safety_System_Interlocks_v1_0.pdf" path="H:\NGAO\1.3.5.4 Safety System\NGAO Safety System Interlocks v1_0.pdf" size="19894" stream="H:\NGAO\1.3.5.4 Safety System\NGAO Safety System Interlocks v1_0.pdf" user="Main.JasonChin" version="2"
Added:
>
>
META FILEATTACHMENT attachment="LaserSystemControlSequencer.doc" attr="h" comment="Laser System Control Sequencer" date="1235529810" name="LaserSystemControlSequencer.doc" path="T:\NGAO\3.3.6 Laser Control System\LaserSystemControlSequencer.doc" size="548352" stream="T:\NGAO\3.3.6 Laser Control System\LaserSystemControlSequencer.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="LaserSystemControlSequencer.pdf" attr="h" comment="Laser System Control Sequencers" date="1235529931" name="LaserSystemControlSequencer.pdf" path="T:\NGAO\3.3.6 Laser Control System\LaserSystemControlSequencer.pdf" size="227368" stream="T:\NGAO\3.3.6 Laser Control System\LaserSystemControlSequencer.pdf" user="Main.JasonChin" version="1"

Revision 52009-02-17 - JasonChin

Line: 1 to 1
 
META TOPICPARENT name="WebHome"
NGAO Preliminary Design Phase
Line: 15 to 15
 
Added:
>
>
 

WBS 3.8 Telescope integration & Test

Line: 29 to 30
 
META FILEATTACHMENT attachment="K2_Laser_Removal_Plan.pdf" attr="h" comment="" date="1234490312" name="K2_Laser_Removal_Plan.pdf" path="H:\NGAO\1.3.8 Integration and Test\K2 Laser Removal Plan.pdf" size="295336" stream="H:\NGAO\1.3.8 Integration and Test\K2 Laser Removal Plan.pdf" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_Safety_System_Interface.pdf" attr="h" comment="Safety System Interfaces" date="1234899396" name="NGAO_Safety_System_Interface.pdf" path="H:\NGAO\1.3.5.4 Safety System\NGAO Safety System Interface.pdf" size="423008" stream="H:\NGAO\1.3.5.4 Safety System\NGAO Safety System Interface.pdf" user="Main.JasonChin" version="2"
META FILEATTACHMENT attachment="NGAO_Safety_System_Interface_Signals_v1_0.pdf" attr="h" comment="Spreadsheet of Safety System Signals" date="1234899433" name="NGAO_Safety_System_Interface_Signals_v1_0.pdf" path="H:\NGAO\1.3.5.4 Safety System\NGAO Safety System Interface Signals v1_0.pdf" size="33928" stream="H:\NGAO\1.3.5.4 Safety System\NGAO Safety System Interface Signals v1_0.pdf" user="Main.JasonChin" version="1"
Added:
>
>
META FILEATTACHMENT attachment="NGAO_Safety_System_Interlocks_v1_0.pdf" attr="h" comment="Safety System Interlocks" date="1234908165" name="NGAO_Safety_System_Interlocks_v1_0.pdf" path="H:\NGAO\1.3.5.4 Safety System\NGAO Safety System Interlocks v1_0.pdf" size="19894" stream="H:\NGAO\1.3.5.4 Safety System\NGAO Safety System Interlocks v1_0.pdf" user="Main.JasonChin" version="2"

Revision 42009-02-17 - JasonChin

Line: 1 to 1
 
META TOPICPARENT name="WebHome"
NGAO Preliminary Design Phase
Line: 12 to 12
 

WBS 3.5 Laser System Design

WBS 3.5.4 Safety System Design

Changed:
<
<
>
>
 

WBS 3.8 Telescope integration & Test

WBS 3.8.1.2 K2 Laser Removal

Changed:
<
<
>
>
 

Line: 28 to 27
 
META FILEATTACHMENT attachment="K2_Laser_Removal_v1.mpp" attr="h" comment="Project Plan associated with removing the K2 laser" date="1234310971" name="K2_Laser_Removal_v1.mpp" path="H:\NGAO\K2 Laser Removal v1.mpp" size="202240" stream="H:\NGAO\K2 Laser Removal v1.mpp" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_Laser_to_Safety_System_Interface.pdf" attr="h" comment="" date="1234490284" name="NGAO_Laser_to_Safety_System_Interface.pdf" path="H:\NGAO\1.3.5.4 Safety System\NGAO Laser to Safety System Interface.pdf" size="120237" stream="H:\NGAO\1.3.5.4 Safety System\NGAO Laser to Safety System Interface.pdf" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="K2_Laser_Removal_Plan.pdf" attr="h" comment="" date="1234490312" name="K2_Laser_Removal_Plan.pdf" path="H:\NGAO\1.3.8 Integration and Test\K2 Laser Removal Plan.pdf" size="295336" stream="H:\NGAO\1.3.8 Integration and Test\K2 Laser Removal Plan.pdf" user="Main.JasonChin" version="1"
Changed:
<
<
META FILEATTACHMENT attachment="NGAO_Safety_System_Interface.pdf" attr="h" comment="Safety System Interfaces" date="1234580571" name="NGAO_Safety_System_Interface.pdf" path="H:\NGAO\1.3.5.4 Safety System\NGAO Safety System Interface.pdf" size="416546" stream="H:\NGAO\1.3.5.4 Safety System\NGAO Safety System Interface.pdf" user="Main.JasonChin" version="1"
>
>
META FILEATTACHMENT attachment="NGAO_Safety_System_Interface.pdf" attr="h" comment="Safety System Interfaces" date="1234899396" name="NGAO_Safety_System_Interface.pdf" path="H:\NGAO\1.3.5.4 Safety System\NGAO Safety System Interface.pdf" size="423008" stream="H:\NGAO\1.3.5.4 Safety System\NGAO Safety System Interface.pdf" user="Main.JasonChin" version="2"
META FILEATTACHMENT attachment="NGAO_Safety_System_Interface_Signals_v1_0.pdf" attr="h" comment="Spreadsheet of Safety System Signals" date="1234899433" name="NGAO_Safety_System_Interface_Signals_v1_0.pdf" path="H:\NGAO\1.3.5.4 Safety System\NGAO Safety System Interface Signals v1_0.pdf" size="33928" stream="H:\NGAO\1.3.5.4 Safety System\NGAO Safety System Interface Signals v1_0.pdf" user="Main.JasonChin" version="1"

Revision 32009-02-14 - JasonChin

Line: 1 to 1
 
META TOPICPARENT name="WebHome"
NGAO Preliminary Design Phase
Line: 13 to 13
 

WBS 3.5.4 Safety System Design

Added:
>
>
 

WBS 3.8 Telescope integration & Test

Line: 25 to 28
 
META FILEATTACHMENT attachment="K2_Laser_Removal_v1.mpp" attr="h" comment="Project Plan associated with removing the K2 laser" date="1234310971" name="K2_Laser_Removal_v1.mpp" path="H:\NGAO\K2 Laser Removal v1.mpp" size="202240" stream="H:\NGAO\K2 Laser Removal v1.mpp" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="NGAO_Laser_to_Safety_System_Interface.pdf" attr="h" comment="" date="1234490284" name="NGAO_Laser_to_Safety_System_Interface.pdf" path="H:\NGAO\1.3.5.4 Safety System\NGAO Laser to Safety System Interface.pdf" size="120237" stream="H:\NGAO\1.3.5.4 Safety System\NGAO Laser to Safety System Interface.pdf" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="K2_Laser_Removal_Plan.pdf" attr="h" comment="" date="1234490312" name="K2_Laser_Removal_Plan.pdf" path="H:\NGAO\1.3.8 Integration and Test\K2 Laser Removal Plan.pdf" size="295336" stream="H:\NGAO\1.3.8 Integration and Test\K2 Laser Removal Plan.pdf" user="Main.JasonChin" version="1"
Added:
>
>
META FILEATTACHMENT attachment="NGAO_Safety_System_Interface.pdf" attr="h" comment="Safety System Interfaces" date="1234580571" name="NGAO_Safety_System_Interface.pdf" path="H:\NGAO\1.3.5.4 Safety System\NGAO Safety System Interface.pdf" size="416546" stream="H:\NGAO\1.3.5.4 Safety System\NGAO Safety System Interface.pdf" user="Main.JasonChin" version="1"

Revision 22009-02-13 - JasonChin

Line: 1 to 1
 
META TOPICPARENT name="WebHome"
NGAO Preliminary Design Phase
Line: 11 to 11
 

WBS 3.5 Laser System Design

Added:
>
>

WBS 3.5.4 Safety System Design

 

WBS 3.8 Telescope integration & Test

WBS 3.8.1.2 K2 Laser Removal

Changed:
<
<
>
>
 

META FILEATTACHMENT attachment="K2_Laser_Removal_Plan.doc" attr="h" comment="Word Document describing tasks associated with removing the K2 laser" date="1234310927" name="K2_Laser_Removal_Plan.doc" path="H:\NGAO\K2 Laser Removal Plan.doc" size="3721728" stream="H:\NGAO\K2 Laser Removal Plan.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="K2_Laser_Removal_v1.mpp" attr="h" comment="Project Plan associated with removing the K2 laser" date="1234310971" name="K2_Laser_Removal_v1.mpp" path="H:\NGAO\K2 Laser Removal v1.mpp" size="202240" stream="H:\NGAO\K2 Laser Removal v1.mpp" user="Main.JasonChin" version="1"
Added:
>
>
META FILEATTACHMENT attachment="NGAO_Laser_to_Safety_System_Interface.pdf" attr="h" comment="" date="1234490284" name="NGAO_Laser_to_Safety_System_Interface.pdf" path="H:\NGAO\1.3.5.4 Safety System\NGAO Laser to Safety System Interface.pdf" size="120237" stream="H:\NGAO\1.3.5.4 Safety System\NGAO Laser to Safety System Interface.pdf" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="K2_Laser_Removal_Plan.pdf" attr="h" comment="" date="1234490312" name="K2_Laser_Removal_Plan.pdf" path="H:\NGAO\1.3.8 Integration and Test\K2 Laser Removal Plan.pdf" size="295336" stream="H:\NGAO\1.3.8 Integration and Test\K2 Laser Removal Plan.pdf" user="Main.JasonChin" version="1"

Revision 12009-02-11 - JasonChin

Line: 1 to 1
Added:
>
>
META TOPICPARENT name="WebHome"
NGAO Preliminary Design Phase

-- Main.Jason Chin - Originated 09 February 2009

Laser System Design Effort (WBS 3.5 & 3.8), Preliminary Design Phase

WBS 3.5 Laser System Design

WBS 3.8 Telescope integration & Test

WBS 3.8.1.2 K2 Laser Removal

META FILEATTACHMENT attachment="K2_Laser_Removal_Plan.doc" attr="h" comment="Word Document describing tasks associated with removing the K2 laser" date="1234310927" name="K2_Laser_Removal_Plan.doc" path="H:\NGAO\K2 Laser Removal Plan.doc" size="3721728" stream="H:\NGAO\K2 Laser Removal Plan.doc" user="Main.JasonChin" version="1"
META FILEATTACHMENT attachment="K2_Laser_Removal_v1.mpp" attr="h" comment="Project Plan associated with removing the K2 laser" date="1234310971" name="K2_Laser_Removal_v1.mpp" path="H:\NGAO\K2 Laser Removal v1.mpp" size="202240" stream="H:\NGAO\K2 Laser Removal v1.mpp" user="Main.JasonChin" version="1"
 