Difference: 061114_CIT_NGAO_Meeting_2 (1 vs. 24)

Revision 242007-02-28 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT

Keck NGAO Team Meeting #2>

8:30a - 5:30p
Line: 12 to 12
 
In effigie (e.g. on the phone): Bauman (potential), Flicker, Johannson, Le Mignant, Liu, Marchis

Action Items from the meeting.
Changed:
<
<
Status of Action Items as of 12/11/06.
>
>
Status of Action Items as of 2/28/07.
  Goals:
  • Introduce team structure and responsibilities
Line: 79 to 79
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1163487750" name="PerformanceRequirements_v2.xls" path="PerformanceRequirements_v2.xls" size="22016" user="Main.ClaireMax" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1163487593" name="Max_ScienceRequirements_v1.ppt" path="Max_ScienceRequirements_v1.ppt" size="2510848" user="Main.ClaireMax" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Interferometer requirements for NGAO" date="1163269431" name="KI_req_NGAO_crn.ppt" path="KI_req_NGAO_crn.ppt" size="3368960" user="Main.ChrisNeyman" version="1"
Changed:
<
<
META FILEATTACHMENT attr="" autoattached="1" comment="Status of action items (12/12/06)" date="1165975315" name="Meeting_2_Action_Items_Status.doc" path="Meeting_2_Action_Items_Status.doc" size="32256" user="Main.PeterWizinowich" version="1"
>
>
META FILEATTACHMENT attachment="Meeting_2_Action_Items_Status.doc" attr="" comment="Status of action items (2/28/07)" date="1172698530" name="Meeting_2_Action_Items_Status.doc" path="V:\ngao system design\Meeting_2_Action_Items_Status.doc" size="32768" stream="V:\ngao system design\Meeting_2_Action_Items_Status.doc" user="Main.PeterWizinowich" version="3"
 
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Instruments Working Group proposal from Adkins." date="1163380331" name="The_NGAO_Instruments_Working_Group_revised.pdf" path="The_NGAO_Instruments_Working_Group_revised.pdf" size="38305" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="latest version of variable vs. fixed asterism TS" date="1163475140" name="NGAO_m2_VFA.ppt" path="NGAO_m2_VFA.ppt" size="904192" user="Main.ViswaVelur" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1163468035" name="Perf_budget_dev_rgd.ppt" path="Perf_budget_dev_rgd.ppt" size="678912" user="Main.RichardDekany" version="1"

Revision 232006-12-13 - RichardDekany

Line: 1 to 1
 
META TOPICPARENT
Changed:
<
<

Keck NGAO Team Meeting #2

>
>

Keck NGAO Team Meeting #2>

 
8:30a - 5:30p
Tuesday, November 14, 2006
012 Robinson Laboratory, Caltech (moved to 023)

Revision 222006-12-13 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT

Keck NGAO Team Meeting #2

8:30a - 5:30p
Line: 11 to 11
 
In propria persona: Adkins, Bouchez, Cameron (am), Dekany, Gavel, Ireland (am), Max, Moore, Neyman, Velur, Wizinowich
In effigie (e.g. on the phone): Bauman (potential), Flicker, Johannson, Le Mignant, Liu, Marchis

Changed:
<
<
Action Items from the meeting: Action items.doc
>
>
Action Items from the meeting. Status of Action Items as of 12/11/06.
  Goals:
  • Introduce team structure and responsibilities
Line: 78 to 79
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1163487750" name="PerformanceRequirements_v2.xls" path="PerformanceRequirements_v2.xls" size="22016" user="Main.ClaireMax" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1163487593" name="Max_ScienceRequirements_v1.ppt" path="Max_ScienceRequirements_v1.ppt" size="2510848" user="Main.ClaireMax" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Interferometer requirements for NGAO" date="1163269431" name="KI_req_NGAO_crn.ppt" path="KI_req_NGAO_crn.ppt" size="3368960" user="Main.ChrisNeyman" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Status of action items (12/12/06)" date="1165975315" name="Meeting_2_Action_Items_Status.doc" path="Meeting_2_Action_Items_Status.doc" size="32256" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Instruments Working Group proposal from Adkins." date="1163380331" name="The_NGAO_Instruments_Working_Group_revised.pdf" path="The_NGAO_Instruments_Working_Group_revised.pdf" size="38305" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="latest version of variable vs. fixed asterism TS" date="1163475140" name="NGAO_m2_VFA.ppt" path="NGAO_m2_VFA.ppt" size="904192" user="Main.ViswaVelur" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1163468035" name="Perf_budget_dev_rgd.ppt" path="Perf_budget_dev_rgd.ppt" size="678912" user="Main.RichardDekany" version="1"
Line: 85 to 87
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1163448369" name="NGAO_m2_vnv_rev2.ppt" path="NGAO_m2_vnv_rev2.ppt" size="696832" user="Main.RichardDekany" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1163527249" name="Max_ScienceRequirements_v1a.ppt" path="Max_ScienceRequirements_v1a.ppt" size="2511360" user="Main.ClaireMax" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1163530982" name="uptime.ppt" path="uptime.ppt" size="114688" user="Main.RichardDekany" version="1"
Changed:
<
<
META FILEATTACHMENT attachment="Meeting_2_Action_Items.doc" attr="" comment="Action items from Meeting 2" date="1163642355" name="Meeting_2_Action_Items.doc" path="D:\peter\Travel Nov06\NGAO meeting 2\Meeting 2 Action Items.doc" size="29184" stream="D:\peter\Travel Nov06\NGAO meeting 2\Meeting 2 Action Items.doc" user="Main.PeterWizinowich" version="2"
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Action items from Meeting 2" date="1163642355" name="Meeting_2_Action_Items.doc" path="Meeting_2_Action_Items.doc" size="29184" user="Main.PeterWizinowich" version="2"
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1163475813" name="NGAO_m2_VFA_final.ppt" path="NGAO_m2_VFA_final.ppt" size="901632" user="Main.ViswaVelur" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Instrumentation report from Adkins for meeting 2." date="1163380276" name="NGAO_Instrumentation_Version_1.ppt" path="NGAO_Instrumentation_Version_1.ppt" size="226304" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1163468518" name="Perf_budget_dev_rgd.pdf" path="Perf_budget_dev_rgd.pdf" size="1098965" user="Main.RichardDekany" version="1"

Revision 212006-11-16 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT

Keck NGAO Team Meeting #2

8:30a - 5:30p
Line: 85 to 85
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1163448369" name="NGAO_m2_vnv_rev2.ppt" path="NGAO_m2_vnv_rev2.ppt" size="696832" user="Main.RichardDekany" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1163527249" name="Max_ScienceRequirements_v1a.ppt" path="Max_ScienceRequirements_v1a.ppt" size="2511360" user="Main.ClaireMax" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1163530982" name="uptime.ppt" path="uptime.ppt" size="114688" user="Main.RichardDekany" version="1"
Changed:
<
<
META FILEATTACHMENT attr="" autoattached="1" comment="Action items from Meeting 2" date="1163556008" name="Meeting_2_Action_Items.doc" path="Meeting_2_Action_Items.doc" size="28672" user="Main.PeterWizinowich" version="1"
>
>
META FILEATTACHMENT attachment="Meeting_2_Action_Items.doc" attr="" comment="Action items from Meeting 2" date="1163642355" name="Meeting_2_Action_Items.doc" path="D:\peter\Travel Nov06\NGAO meeting 2\Meeting 2 Action Items.doc" size="29184" stream="D:\peter\Travel Nov06\NGAO meeting 2\Meeting 2 Action Items.doc" user="Main.PeterWizinowich" version="2"
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1163475813" name="NGAO_m2_VFA_final.ppt" path="NGAO_m2_VFA_final.ppt" size="901632" user="Main.ViswaVelur" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Instrumentation report from Adkins for meeting 2." date="1163380276" name="NGAO_Instrumentation_Version_1.ppt" path="NGAO_Instrumentation_Version_1.ppt" size="226304" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1163468518" name="Perf_budget_dev_rgd.pdf" path="Perf_budget_dev_rgd.pdf" size="1098965" user="Main.RichardDekany" version="1"

Revision 202006-11-15 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT

Keck NGAO Team Meeting #2

8:30a - 5:30p
Line: 11 to 11
 
In propria persona: Adkins, Bouchez, Cameron (am), Dekany, Gavel, Ireland (am), Max, Moore, Neyman, Velur, Wizinowich
In effigie (e.g. on the phone): Bauman (potential), Flicker, Johannson, Le Mignant, Liu, Marchis

Added:
>
>
Action Items from the meeting: Action items.doc
 Goals:
  • Introduce team structure and responsibilities
  • Review System Requirements Document (Release 1)
Line: 82 to 85
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1163448369" name="NGAO_m2_vnv_rev2.ppt" path="NGAO_m2_vnv_rev2.ppt" size="696832" user="Main.RichardDekany" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1163527249" name="Max_ScienceRequirements_v1a.ppt" path="Max_ScienceRequirements_v1a.ppt" size="2511360" user="Main.ClaireMax" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1163530982" name="uptime.ppt" path="uptime.ppt" size="114688" user="Main.RichardDekany" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Action items from Meeting 2" date="1163556008" name="Meeting_2_Action_Items.doc" path="Meeting_2_Action_Items.doc" size="28672" user="Main.PeterWizinowich" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1163475813" name="NGAO_m2_VFA_final.ppt" path="NGAO_m2_VFA_final.ppt" size="901632" user="Main.ViswaVelur" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Instrumentation report from Adkins for meeting 2." date="1163380276" name="NGAO_Instrumentation_Version_1.ppt" path="NGAO_Instrumentation_Version_1.ppt" size="226304" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1163468518" name="Perf_budget_dev_rgd.pdf" path="Perf_budget_dev_rgd.pdf" size="1098965" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1163461793" name="NGAO_SRD_Release1_v3-print.pdf" path="NGAO_SRD_Release1_v3-print.pdf" size="1166443" user="Main.ClaireMax" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1163540035" name="Minimum_Variance_Wavefront_Reconstruction.ppt" path="Minimum_Variance_Wavefront_Reconstruction.ppt" size="208896" user="Main.DonaldGavel" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="LGS asterisms trade study report" date="1163386268" name="TS-tomo.pdf" path="TS-tomo.pdf" size="3149094" user="Main.RalfFlicker" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1163407621" name="NGAO_meeting_#2_1106_rgd_draft.ppt" path="NGAO_meeting_#2_1106_rgd_draft.ppt" size="342528" user="Main.RichardDekany" version="1"
Deleted:
<
<
META FILEATTACHMENT attachment="Minimum_Variance_Wavefront_Reconstruction.ppt" attr="" comment="" date="1163540035" name="Minimum_Variance_Wavefront_Reconstruction.ppt" path="Minimum Variance Wavefront Reconstruction.ppt" size="208896" stream="Minimum Variance Wavefront Reconstruction.ppt" user="Main.DonaldGavel" version="1"

Revision 192006-11-14 - DonaldGavel

Line: 1 to 1
 
META TOPICPARENT

Keck NGAO Team Meeting #2

8:30a - 5:30p
Line: 88 to 88
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1163461793" name="NGAO_SRD_Release1_v3-print.pdf" path="NGAO_SRD_Release1_v3-print.pdf" size="1166443" user="Main.ClaireMax" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="LGS asterisms trade study report" date="1163386268" name="TS-tomo.pdf" path="TS-tomo.pdf" size="3149094" user="Main.RalfFlicker" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1163407621" name="NGAO_meeting_#2_1106_rgd_draft.ppt" path="NGAO_meeting_#2_1106_rgd_draft.ppt" size="342528" user="Main.RichardDekany" version="1"
Added:
>
>
META FILEATTACHMENT attachment="Minimum_Variance_Wavefront_Reconstruction.ppt" attr="" comment="" date="1163540035" name="Minimum_Variance_Wavefront_Reconstruction.ppt" path="Minimum Variance Wavefront Reconstruction.ppt" size="208896" stream="Minimum Variance Wavefront Reconstruction.ppt" user="Main.DonaldGavel" version="1"

Revision 182006-11-14 - RichardDekany

Line: 1 to 1
 
META TOPICPARENT

Keck NGAO Team Meeting #2

8:30a - 5:30p
Line: 40 to 40
 
        • Polarimetric Precision (Ireland)
        • Wavefront Error (Dekany)
        • Observing Efficiency (LeMignant)
Changed:
<
<
        • Observing Uptime (Johansson)
>
>
 
  • 12:15 pm Box Lunch (provided)
  • 1:00 pm Trade Study Report: LGS Asterism Geometry and Size (Flicker) TS-tomo.pdf
    • From the WBS Dictionary: Find the simplest LGS asterism geometry meeting the performance budget goals (e.g. quincunx, ring, 1+triangle, or hex) and the asterism radii. Consider optimization of the Strehl of the tip/tilt stars and the resultant sky coverage as well. Complete when LGS asterism, HO WFS, and LO WFS requirements have been documented.
Line: 81 to 81
 
META FILEATTACHMENT attr="" autoattached="1" comment="Management Report" date="1163380111" name="NGAO_meeting_#2_1106.ppt" path="NGAO_meeting_#2_1106.ppt" size="406016" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1163448369" name="NGAO_m2_vnv_rev2.ppt" path="NGAO_m2_vnv_rev2.ppt" size="696832" user="Main.RichardDekany" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1163527249" name="Max_ScienceRequirements_v1a.ppt" path="Max_ScienceRequirements_v1a.ppt" size="2511360" user="Main.ClaireMax" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1163530982" name="uptime.ppt" path="uptime.ppt" size="114688" user="Main.RichardDekany" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1163475813" name="NGAO_m2_VFA_final.ppt" path="NGAO_m2_VFA_final.ppt" size="901632" user="Main.ViswaVelur" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Instrumentation report from Adkins for meeting 2." date="1163380276" name="NGAO_Instrumentation_Version_1.ppt" path="NGAO_Instrumentation_Version_1.ppt" size="226304" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1163468518" name="Perf_budget_dev_rgd.pdf" path="Perf_budget_dev_rgd.pdf" size="1098965" user="Main.RichardDekany" version="1"

Revision 172006-11-14 - ClaireMax

Line: 1 to 1
 
META TOPICPARENT

Keck NGAO Team Meeting #2

8:30a - 5:30p
Line: 24 to 24
 
  • 8:30 am Welcome and Team Introductions (All)
  • 9:00 am Management Report (Wizinowich) Management Report.ppt
    • Review study overall progress, progress against milestones, and summary financial situation
Changed:
<
<
>
>
 
    • From the SD SEMP: The SRD describes the new system in terms of the needed scientific and technical performance. The document also expresses specific requirements for implementation or design where those requirements are essential to satisfactory integration and interoperation of the new system with other observatory systems.
    • Review changes to science requirements contained in SRD (Release 1) compared to June NGAO proposal
    • Discuss science / engineering team interactions
Line: 78 to 80
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1163468035" name="Perf_budget_dev_rgd.ppt" path="Perf_budget_dev_rgd.ppt" size="678912" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Management Report" date="1163380111" name="NGAO_meeting_#2_1106.ppt" path="NGAO_meeting_#2_1106.ppt" size="406016" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1163448369" name="NGAO_m2_vnv_rev2.ppt" path="NGAO_m2_vnv_rev2.ppt" size="696832" user="Main.RichardDekany" version="2"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1163527249" name="Max_ScienceRequirements_v1a.ppt" path="Max_ScienceRequirements_v1a.ppt" size="2511360" user="Main.ClaireMax" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1163475813" name="NGAO_m2_VFA_final.ppt" path="NGAO_m2_VFA_final.ppt" size="901632" user="Main.ViswaVelur" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Instrumentation report from Adkins for meeting 2." date="1163380276" name="NGAO_Instrumentation_Version_1.ppt" path="NGAO_Instrumentation_Version_1.ppt" size="226304" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1163468518" name="Perf_budget_dev_rgd.pdf" path="Perf_budget_dev_rgd.pdf" size="1098965" user="Main.RichardDekany" version="1"

Revision 162006-11-14 - AnnaMoore

Line: 1 to 1
 
META TOPICPARENT

Keck NGAO Team Meeting #2

8:30a - 5:30p
Line: 62 to 62
 
  • 5:30 Adjourn

  • Evening NGAO Dinner in Old Town Pasadena (6:30p)
Changed:
<
<
    • Akbar Cuisine of India ($20) (Wizinowich, Neyman, Dekany)
>
>
    • Akbar Cuisine of India ($20) (Wizinowich, Neyman, Dekany, Moore)
 
    • Gaucho Grill (Argentinian) ($20) (vote here)
    • Il Fornaio (Italian) ($30) (vote here)
    • Twin Palms (Californian) ($40) (vote here)

Revision 152006-11-14 - RichardDekany

Line: 1 to 1
 
META TOPICPARENT

Keck NGAO Team Meeting #2

8:30a - 5:30p
Tuesday, November 14, 2006
Changed:
<
<
012 Robinson Laboratory, Caltech
>
>
012 Robinson Laboratory, Caltech (moved to 023)
 
Telecon attendees: 877-280-4645 passcode 540030

Directions: Getting to Caltech (.html) and Caltech campus map (.pdf)

Revision 142006-11-14 - ClaireMax

Line: 1 to 1
 
META TOPICPARENT

Keck NGAO Team Meeting #2

8:30a - 5:30p
Line: 24 to 24
 
  • 8:30 am Welcome and Team Introductions (All)
  • 9:00 am Management Report (Wizinowich) Management Report.ppt
    • Review study overall progress, progress against milestones, and summary financial situation
Changed:
<
<
>
>
 
    • From the SD SEMP: The SRD describes the new system in terms of the needed scientific and technical performance. The document also expresses specific requirements for implementation or design where those requirements are essential to satisfactory integration and interoperation of the new system with other observatory systems.
    • Review changes to science requirements contained in SRD (Release 1) compared to June NGAO proposal
    • Discuss science / engineering team interactions
Line: 68 to 68
 
    • Twin Palms (Californian) ($40) (vote here)
Added:
>
>
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1163408381" name="Perf_budget_dev_rgd_draft.ppt" path="Perf_budget_dev_rgd_draft.ppt" size="293376" user="Main.RichardDekany" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1163487750" name="PerformanceRequirements_v2.xls" path="PerformanceRequirements_v2.xls" size="22016" user="Main.ClaireMax" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1163487593" name="Max_ScienceRequirements_v1.ppt" path="Max_ScienceRequirements_v1.ppt" size="2510848" user="Main.ClaireMax" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Interferometer requirements for NGAO" date="1163269431" name="KI_req_NGAO_crn.ppt" path="KI_req_NGAO_crn.ppt" size="3368960" user="Main.ChrisNeyman" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Instruments Working Group proposal from Adkins." date="1163380331" name="The_NGAO_Instruments_Working_Group_revised.pdf" path="The_NGAO_Instruments_Working_Group_revised.pdf" size="38305" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="latest version of variable vs. fixed asterism TS" date="1163475140" name="NGAO_m2_VFA.ppt" path="NGAO_m2_VFA.ppt" size="904192" user="Main.ViswaVelur" version="2"

Revision 132006-11-14 - ViswaVelur

Line: 1 to 1
 
META TOPICPARENT

Keck NGAO Team Meeting #2

8:30a - 5:30p
Line: 44 to 44
 
  • 12:15 pm Box Lunch (provided)
  • 1:00 pm Trade Study Report: LGS Asterism Geometry and Size (Flicker) TS-tomo.pdf
    • From the WBS Dictionary: Find the simplest LGS asterism geometry meeting the performance budget goals (e.g. quincunx, ring, 1+triangle, or hex) and the asterism radii. Consider optimization of the Strehl of the tip/tilt stars and the resultant sky coverage as well. Complete when LGS asterism, HO WFS, and LO WFS requirements have been documented.
Changed:
<
<
>
>
 
    • From the WBS DIctionary: Consider the cost/benefit of continually varying the LGS asterism radius vs. a fixed number of radii (e.g. 5", 25", 50"). Complete when LGS asterism requirements have been documented.
  • 2:00 pm Keck Interferometry Requirements (Neyman) KI_req_NGAO_crn.ppt
    • Review the KI requirements on delivered wavefront, including wavefront error and polarization
Line: 75 to 71
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1163408381" name="Perf_budget_dev_rgd_draft.ppt" path="Perf_budget_dev_rgd_draft.ppt" size="293376" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Interferometer requirements for NGAO" date="1163269431" name="KI_req_NGAO_crn.ppt" path="KI_req_NGAO_crn.ppt" size="3368960" user="Main.ChrisNeyman" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Instruments Working Group proposal from Adkins." date="1163380331" name="The_NGAO_Instruments_Working_Group_revised.pdf" path="The_NGAO_Instruments_Working_Group_revised.pdf" size="38305" user="Main.PeterWizinowich" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="latest version of variable vs. fixed asterism TS" date="1163475140" name="NGAO_m2_VFA.ppt" path="NGAO_m2_VFA.ppt" size="904192" user="Main.ViswaVelur" version="2"
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1163468035" name="Perf_budget_dev_rgd.ppt" path="Perf_budget_dev_rgd.ppt" size="678912" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Management Report" date="1163380111" name="NGAO_meeting_#2_1106.ppt" path="NGAO_meeting_#2_1106.ppt" size="406016" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1163448369" name="NGAO_m2_vnv_rev2.ppt" path="NGAO_m2_vnv_rev2.ppt" size="696832" user="Main.RichardDekany" version="2"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1163475813" name="NGAO_m2_VFA_final.ppt" path="NGAO_m2_VFA_final.ppt" size="901632" user="Main.ViswaVelur" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Instrumentation report from Adkins for meeting 2." date="1163380276" name="NGAO_Instrumentation_Version_1.ppt" path="NGAO_Instrumentation_Version_1.ppt" size="226304" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1163468518" name="Perf_budget_dev_rgd.pdf" path="Perf_budget_dev_rgd.pdf" size="1098965" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1163461793" name="NGAO_SRD_Release1_v3-print.pdf" path="NGAO_SRD_Release1_v3-print.pdf" size="1166443" user="Main.ClaireMax" version="1"

Revision 122006-11-14 - RichardDekany

Line: 1 to 1
 
META TOPICPARENT

Keck NGAO Team Meeting #2

8:30a - 5:30p
Line: 24 to 24
 
  • 8:30 am Welcome and Team Introductions (All)
  • 9:00 am Management Report (Wizinowich) Management Report.ppt
    • Review study overall progress, progress against milestones, and summary financial situation
Changed:
<
<
>
>
 
    • From the SD SEMP: The SRD describes the new system in terms of the needed scientific and technical performance. The document also expresses specific requirements for implementation or design where those requirements are essential to satisfactory integration and interoperation of the new system with other observatory systems.
    • Review changes to science requirements contained in SRD (Release 1) compared to June NGAO proposal
    • Discuss science / engineering team interactions
  • 10:30 am Break
Changed:
<
<
>
>
 
    • Review the NGAO Required Observing Modes
    • Review the key architecture and technology drivers for each of the 6 Performance and 2 Efficiency Budgets
        • Astrometric Accuracy (Cameron)
Line: 76 to 75
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1163408381" name="Perf_budget_dev_rgd_draft.ppt" path="Perf_budget_dev_rgd_draft.ppt" size="293376" user="Main.RichardDekany" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Interferometer requirements for NGAO" date="1163269431" name="KI_req_NGAO_crn.ppt" path="KI_req_NGAO_crn.ppt" size="3368960" user="Main.ChrisNeyman" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Instruments Working Group proposal from Adkins." date="1163380331" name="The_NGAO_Instruments_Working_Group_revised.pdf" path="The_NGAO_Instruments_Working_Group_revised.pdf" size="38305" user="Main.PeterWizinowich" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1163468035" name="Perf_budget_dev_rgd.ppt" path="Perf_budget_dev_rgd.ppt" size="678912" user="Main.RichardDekany" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Management Report" date="1163380111" name="NGAO_meeting_#2_1106.ppt" path="NGAO_meeting_#2_1106.ppt" size="406016" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1163448369" name="NGAO_m2_vnv_rev2.ppt" path="NGAO_m2_vnv_rev2.ppt" size="696832" user="Main.RichardDekany" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Instrumentation report from Adkins for meeting 2." date="1163380276" name="NGAO_Instrumentation_Version_1.ppt" path="NGAO_Instrumentation_Version_1.ppt" size="226304" user="Main.PeterWizinowich" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1163468518" name="Perf_budget_dev_rgd.pdf" path="Perf_budget_dev_rgd.pdf" size="1098965" user="Main.RichardDekany" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1163461793" name="NGAO_SRD_Release1_v3-print.pdf" path="NGAO_SRD_Release1_v3-print.pdf" size="1166443" user="Main.ClaireMax" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="LGS asterisms trade study report" date="1163386268" name="TS-tomo.pdf" path="TS-tomo.pdf" size="3149094" user="Main.RalfFlicker" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1163407621" name="NGAO_meeting_#2_1106_rgd_draft.ppt" path="NGAO_meeting_#2_1106_rgd_draft.ppt" size="342528" user="Main.RichardDekany" version="1"

Revision 112006-11-13 - ClaireMax

Line: 1 to 1
 
META TOPICPARENT

Keck NGAO Team Meeting #2

8:30a - 5:30p
Line: 24 to 24
 
  • 8:30 am Welcome and Team Introductions (All)
  • 9:00 am Management Report (Wizinowich) Management Report.ppt
    • Review study overall progress, progress against milestones, and summary financial situation
Changed:
<
<
  • 9:30 am Science Requirements Document (Release 1) (Max) .ppt
>
>
 
    • From the SD SEMP: The SRD describes the new system in terms of the needed scientific and technical performance. The document also expresses specific requirements for implementation or design where those requirements are essential to satisfactory integration and interoperation of the new system with other observatory systems.
    • Review changes to science requirements contained in SRD (Release 1) compared to June NGAO proposal
    • Discuss science / engineering team interactions
Line: 76 to 79
 
META FILEATTACHMENT attr="" autoattached="1" comment="Management Report" date="1163380111" name="NGAO_meeting_#2_1106.ppt" path="NGAO_meeting_#2_1106.ppt" size="406016" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1163448369" name="NGAO_m2_vnv_rev2.ppt" path="NGAO_m2_vnv_rev2.ppt" size="696832" user="Main.RichardDekany" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Instrumentation report from Adkins for meeting 2." date="1163380276" name="NGAO_Instrumentation_Version_1.ppt" path="NGAO_Instrumentation_Version_1.ppt" size="226304" user="Main.PeterWizinowich" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1163461793" name="NGAO_SRD_Release1_v3-print.pdf" path="NGAO_SRD_Release1_v3-print.pdf" size="1166443" user="Main.ClaireMax" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="LGS asterisms trade study report" date="1163386268" name="TS-tomo.pdf" path="TS-tomo.pdf" size="3149094" user="Main.RalfFlicker" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1163407621" name="NGAO_meeting_#2_1106_rgd_draft.ppt" path="NGAO_meeting_#2_1106_rgd_draft.ppt" size="342528" user="Main.RichardDekany" version="1"

Revision 102006-11-13 - RichardDekany

Line: 1 to 1
 
META TOPICPARENT

Keck NGAO Team Meeting #2

8:30a - 5:30p
Tuesday, November 14, 2006
012 Robinson Laboratory, Caltech
Changed:
<
<
Telecon attendees: 877-280-4645 passcoed 540030
>
>
Telecon attendees: 877-280-4645 passcode 540030
  Directions: Getting to Caltech (.html) and Caltech campus map (.pdf)
Line: 41 to 41
 
        • Wavefront Error (Dekany)
        • Observing Efficiency (LeMignant)
        • Observing Uptime (Johansson)
Changed:
<
<
  • 12:15 pm Lunch
>
>
  • 12:15 pm Box Lunch (provided)
 
  • 1:00 pm Trade Study Report: LGS Asterism Geometry and Size (Flicker) TS-tomo.pdf
    • From the WBS Dictionary: Find the simplest LGS asterism geometry meeting the performance budget goals (e.g. quincunx, ring, 1+triangle, or hex) and the asterism radii. Consider optimization of the Strehl of the tip/tilt stars and the resultant sky coverage as well. Complete when LGS asterism, HO WFS, and LO WFS requirements have been documented.
  • 1:30 pm Trade Study Report: Fixed vs. Variable LGS Asterism (Velur) NGAO_m2_vnv_rev2.ppt
Line: 74 to 74
 
META FILEATTACHMENT attr="" autoattached="1" comment="Interferometer requirements for NGAO" date="1163269431" name="KI_req_NGAO_crn.ppt" path="KI_req_NGAO_crn.ppt" size="3368960" user="Main.ChrisNeyman" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Instruments Working Group proposal from Adkins." date="1163380331" name="The_NGAO_Instruments_Working_Group_revised.pdf" path="The_NGAO_Instruments_Working_Group_revised.pdf" size="38305" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Management Report" date="1163380111" name="NGAO_meeting_#2_1106.ppt" path="NGAO_meeting_#2_1106.ppt" size="406016" user="Main.PeterWizinowich" version="1"
Changed:
<
<
META FILEATTACHMENT attachment="NGAO_m2_vnv_rev2.ppt" attr="" comment="" date="1163448369" name="NGAO_m2_vnv_rev2.ppt" path="NGAO_m2_vnv_rev2.ppt" size="696832" stream="NGAO_m2_vnv_rev2.ppt" user="Main.RichardDekany" version="2"
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1163448369" name="NGAO_m2_vnv_rev2.ppt" path="NGAO_m2_vnv_rev2.ppt" size="696832" user="Main.RichardDekany" version="2"
 
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Instrumentation report from Adkins for meeting 2." date="1163380276" name="NGAO_Instrumentation_Version_1.ppt" path="NGAO_Instrumentation_Version_1.ppt" size="226304" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="LGS asterisms trade study report" date="1163386268" name="TS-tomo.pdf" path="TS-tomo.pdf" size="3149094" user="Main.RalfFlicker" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1163407621" name="NGAO_meeting_#2_1106_rgd_draft.ppt" path="NGAO_meeting_#2_1106_rgd_draft.ppt" size="342528" user="Main.RichardDekany" version="1"

Revision 92006-11-13 - RichardDekany

Line: 1 to 1
 
META TOPICPARENT

Keck NGAO Team Meeting #2

8:30a - 5:30p
Line: 44 to 44
 
  • 12:15 pm Lunch
  • 1:00 pm Trade Study Report: LGS Asterism Geometry and Size (Flicker) TS-tomo.pdf
    • From the WBS Dictionary: Find the simplest LGS asterism geometry meeting the performance budget goals (e.g. quincunx, ring, 1+triangle, or hex) and the asterism radii. Consider optimization of the Strehl of the tip/tilt stars and the resultant sky coverage as well. Complete when LGS asterism, HO WFS, and LO WFS requirements have been documented.
Changed:
<
<
  • 1:30 pm Trade Study Report: Fixed vs. Variable LGS Asterism (Velur) .ppt
>
>
 
    • From the WBS DIctionary: Consider the cost/benefit of continually varying the LGS asterism radius vs. a fixed number of radii (e.g. 5", 25", 50"). Complete when LGS asterism requirements have been documented.
  • 2:00 pm Keck Interferometry Requirements (Neyman) KI_req_NGAO_crn.ppt
    • Review the KI requirements on delivered wavefront, including wavefront error and polarization
Line: 74 to 74
 
META FILEATTACHMENT attr="" autoattached="1" comment="Interferometer requirements for NGAO" date="1163269431" name="KI_req_NGAO_crn.ppt" path="KI_req_NGAO_crn.ppt" size="3368960" user="Main.ChrisNeyman" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Instruments Working Group proposal from Adkins." date="1163380331" name="The_NGAO_Instruments_Working_Group_revised.pdf" path="The_NGAO_Instruments_Working_Group_revised.pdf" size="38305" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Management Report" date="1163380111" name="NGAO_meeting_#2_1106.ppt" path="NGAO_meeting_#2_1106.ppt" size="406016" user="Main.PeterWizinowich" version="1"
Added:
>
>
META FILEATTACHMENT attachment="NGAO_m2_vnv_rev2.ppt" attr="" comment="" date="1163448369" name="NGAO_m2_vnv_rev2.ppt" path="NGAO_m2_vnv_rev2.ppt" size="696832" stream="NGAO_m2_vnv_rev2.ppt" user="Main.RichardDekany" version="2"
 
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Instrumentation report from Adkins for meeting 2." date="1163380276" name="NGAO_Instrumentation_Version_1.ppt" path="NGAO_Instrumentation_Version_1.ppt" size="226304" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="LGS asterisms trade study report" date="1163386268" name="TS-tomo.pdf" path="TS-tomo.pdf" size="3149094" user="Main.RalfFlicker" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1163407621" name="NGAO_meeting_#2_1106_rgd_draft.ppt" path="NGAO_meeting_#2_1106_rgd_draft.ppt" size="342528" user="Main.RichardDekany" version="1"

Revision 82006-11-13 - RichardDekany

Line: 1 to 1
 
META TOPICPARENT

Keck NGAO Team Meeting #2

8:30a - 5:30p
Line: 29 to 29
 
    • Review changes to science requirements contained in SRD (Release 1) compared to June NGAO proposal
    • Discuss science / engineering team interactions
  • 10:30 am Break
Changed:
<
<
  • 10:45 am Key Performance Drivers (Dekany) .ppt
>
>
 
    • Review the NGAO Required Observing Modes
Changed:
<
<
    • Review the key architecture and technology drivers for each of the 7 Performance and 2 Efficiency Budgets
        • Astrometric Precision (Cameron)
        • Background (Bouchez)
>
>
    • Review the key architecture and technology drivers for each of the 6 Performance and 2 Efficiency Budgets
        • Astrometric Accuracy (Cameron)
        • Background and Sensitivity (Bouchez)
 
        • Encircled Energy (Gavel)
        • High-Contrast (Macintosh)
        • Photometric Precision (Britton)
        • Polarimetric Precision (Ireland)
Deleted:
<
<
        • Transmission (Bouchez)
 
        • Wavefront Error (Dekany)
        • Observing Efficiency (LeMignant)
        • Observing Uptime (Johansson)
Line: 63 to 62
 
  • 5:30 Adjourn

  • Evening NGAO Dinner in Old Town Pasadena (6:30p)
Changed:
<
<
    • Akbar Cuisine of India ($20) (Wizinowich_Neyman)
>
>
    • Akbar Cuisine of India ($20) (Wizinowich, Neyman, Dekany)
 
    • Gaucho Grill (Argentinian) ($20) (vote here)
Changed:
<
<
    • Il Fornaio (Italian) ($30) (Dekany)
>
>
    • Il Fornaio (Italian) ($30) (vote here)
 
    • Twin Palms (Californian) ($40) (vote here)

Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1163408381" name="Perf_budget_dev_rgd_draft.ppt" path="Perf_budget_dev_rgd_draft.ppt" size="293376" user="Main.RichardDekany" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="Interferometer requirements for NGAO" date="1163269431" name="KI_req_NGAO_crn.ppt" path="KI_req_NGAO_crn.ppt" size="3368960" user="Main.ChrisNeyman" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Instruments Working Group proposal from Adkins." date="1163380331" name="The_NGAO_Instruments_Working_Group_revised.pdf" path="The_NGAO_Instruments_Working_Group_revised.pdf" size="38305" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Management Report" date="1163380111" name="NGAO_meeting_#2_1106.ppt" path="NGAO_meeting_#2_1106.ppt" size="406016" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Instrumentation report from Adkins for meeting 2." date="1163380276" name="NGAO_Instrumentation_Version_1.ppt" path="NGAO_Instrumentation_Version_1.ppt" size="226304" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="LGS asterisms trade study report" date="1163386268" name="TS-tomo.pdf" path="TS-tomo.pdf" size="3149094" user="Main.RalfFlicker" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1163407621" name="NGAO_meeting_#2_1106_rgd_draft.ppt" path="NGAO_meeting_#2_1106_rgd_draft.ppt" size="342528" user="Main.RichardDekany" version="1"

Revision 72006-11-13 - RalfFlicker

Line: 1 to 1
 
META TOPICPARENT

Keck NGAO Team Meeting #2

8:30a - 5:30p
Line: 43 to 43
 
        • Observing Efficiency (LeMignant)
        • Observing Uptime (Johansson)
  • 12:15 pm Lunch
Changed:
<
<
  • 1:00 pm Trade Study Report: LGS Asterism Geometry and Size (Flicker) .ppt
>
>
  • 1:00 pm Trade Study Report: LGS Asterism Geometry and Size (Flicker) TS-tomo.pdf
 
    • From the WBS Dictionary: Find the simplest LGS asterism geometry meeting the performance budget goals (e.g. quincunx, ring, 1+triangle, or hex) and the asterism radii. Consider optimization of the Strehl of the tip/tilt stars and the resultant sky coverage as well. Complete when LGS asterism, HO WFS, and LO WFS requirements have been documented.
  • 1:30 pm Trade Study Report: Fixed vs. Variable LGS Asterism (Velur) .ppt
    • From the WBS DIctionary: Consider the cost/benefit of continually varying the LGS asterism radius vs. a fixed number of radii (e.g. 5", 25", 50"). Complete when LGS asterism requirements have been documented.
Line: 75 to 75
 
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Instruments Working Group proposal from Adkins." date="1163380331" name="The_NGAO_Instruments_Working_Group_revised.pdf" path="The_NGAO_Instruments_Working_Group_revised.pdf" size="38305" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Management Report" date="1163380111" name="NGAO_meeting_#2_1106.ppt" path="NGAO_meeting_#2_1106.ppt" size="406016" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Instrumentation report from Adkins for meeting 2." date="1163380276" name="NGAO_Instrumentation_Version_1.ppt" path="NGAO_Instrumentation_Version_1.ppt" size="226304" user="Main.PeterWizinowich" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="LGS asterisms trade study report" date="1163386268" name="TS-tomo.pdf" path="TS-tomo.pdf" size="3149094" user="Main.RalfFlicker" version="1"

Revision 62006-11-13 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT

Keck NGAO Team Meeting #2

8:30a - 5:30p
Line: 22 to 22
 Agenda:
  • 8:00 am Refreshments
  • 8:30 am Welcome and Team Introductions (All)
Changed:
<
<
  • 9:00 am Management Report (Wizinowich) .ppt
>
>
 
    • Review study overall progress, progress against milestones, and summary financial situation
  • 9:30 am Science Requirements Document (Release 1) (Max) .ppt
    • From the SD SEMP: The SRD describes the new system in terms of the needed scientific and technical performance. The document also expresses specific requirements for implementation or design where those requirements are essential to satisfactory integration and interoperation of the new system with other observatory systems.
Line: 49 to 49
 
    • From the WBS DIctionary: Consider the cost/benefit of continually varying the LGS asterism radius vs. a fixed number of radii (e.g. 5", 25", 50"). Complete when LGS asterism requirements have been documented.
  • 2:00 pm Keck Interferometry Requirements (Neyman) KI_req_NGAO_crn.ppt
    • Review the KI requirements on delivered wavefront, including wavefront error and polarization
Changed:
<
<
  • 2:30 pm NGAO Instrument Study Strategy (Adkins - RD suggests + Moore) .ppt
>
>
 
    • Review the strategy, scope, organization, and expectations for instrument "proposal-level" development within the NGAO system design phase
    • Discuss science /engineering team interactions
    • Review schedule for initial NGAO instrument concepts (proposed:)
Line: 71 to 71
 
Changed:
<
<
META FILEATTACHMENT attachment="KI_req_NGAO_crn.ppt" attr="" comment="Interferometer requirements for NGAO" date="1163269431" name="KI_req_NGAO_crn.ppt" path="H:\NGAO\Interferometer\NGAOpresentation\KI_req_NGAO_crn.ppt" size="3368960" stream="H:\NGAO\Interferometer\NGAOpresentation\KI_req_NGAO_crn.ppt" user="Main.ChrisNeyman" version="1"
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="Interferometer requirements for NGAO" date="1163269431" name="KI_req_NGAO_crn.ppt" path="KI_req_NGAO_crn.ppt" size="3368960" user="Main.ChrisNeyman" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Instruments Working Group proposal from Adkins." date="1163380331" name="The_NGAO_Instruments_Working_Group_revised.pdf" path="The_NGAO_Instruments_Working_Group_revised.pdf" size="38305" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="Management Report" date="1163380111" name="NGAO_meeting_#2_1106.ppt" path="NGAO_meeting_#2_1106.ppt" size="406016" user="Main.PeterWizinowich" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="NGAO Instrumentation report from Adkins for meeting 2." date="1163380276" name="NGAO_Instrumentation_Version_1.ppt" path="NGAO_Instrumentation_Version_1.ppt" size="226304" user="Main.PeterWizinowich" version="1"

Revision 52006-11-11 - ChrisNeyman

Line: 1 to 1
 
META TOPICPARENT

Keck NGAO Team Meeting #2

8:30a - 5:30p
Line: 63 to 63
 
  • 5:30 Adjourn

  • Evening NGAO Dinner in Old Town Pasadena (6:30p)
Changed:
<
<
    • Akbar Cuisine of India ($20) (Wizinowich)
>
>
    • Akbar Cuisine of India ($20) (Wizinowich_Neyman)
 
    • Gaucho Grill (Argentinian) ($20) (vote here)
    • Il Fornaio (Italian) ($30) (Dekany)
    • Twin Palms (Californian) ($40) (vote here)
Changed:
<
<
* KI_req_NGAO_crn.ppt: Interferometer requirements for NGAO
>
>

 

META FILEATTACHMENT attachment="KI_req_NGAO_crn.ppt" attr="" comment="Interferometer requirements for NGAO" date="1163269431" name="KI_req_NGAO_crn.ppt" path="H:\NGAO\Interferometer\NGAOpresentation\KI_req_NGAO_crn.ppt" size="3368960" stream="H:\NGAO\Interferometer\NGAOpresentation\KI_req_NGAO_crn.ppt" user="Main.ChrisNeyman" version="1"

Revision 42006-11-11 - ChrisNeyman

Line: 1 to 1
 
META TOPICPARENT

Keck NGAO Team Meeting #2

8:30a - 5:30p
Line: 47 to 47
 
    • From the WBS Dictionary: Find the simplest LGS asterism geometry meeting the performance budget goals (e.g. quincunx, ring, 1+triangle, or hex) and the asterism radii. Consider optimization of the Strehl of the tip/tilt stars and the resultant sky coverage as well. Complete when LGS asterism, HO WFS, and LO WFS requirements have been documented.
  • 1:30 pm Trade Study Report: Fixed vs. Variable LGS Asterism (Velur) .ppt
    • From the WBS DIctionary: Consider the cost/benefit of continually varying the LGS asterism radius vs. a fixed number of radii (e.g. 5", 25", 50"). Complete when LGS asterism requirements have been documented.
Changed:
<
<
  • 2:00 pm Keck Interferometry Requirements (Neyman) .ppt
>
>
 
    • Review the KI requirements on delivered wavefront, including wavefront error and polarization
  • 2:30 pm NGAO Instrument Study Strategy (Adkins - RD suggests + Moore) .ppt
    • Review the strategy, scope, organization, and expectations for instrument "proposal-level" development within the NGAO system design phase
Line: 67 to 67
 
    • Gaucho Grill (Argentinian) ($20) (vote here)
    • Il Fornaio (Italian) ($30) (Dekany)
    • Twin Palms (Californian) ($40) (vote here)
\ No newline at end of file
Added:
>
>
* KI_req_NGAO_crn.ppt: Interferometer requirements for NGAO

META FILEATTACHMENT attachment="KI_req_NGAO_crn.ppt" attr="" comment="Interferometer requirements for NGAO" date="1163269431" name="KI_req_NGAO_crn.ppt" path="H:\NGAO\Interferometer\NGAOpresentation\KI_req_NGAO_crn.ppt" size="3368960" stream="H:\NGAO\Interferometer\NGAOpresentation\KI_req_NGAO_crn.ppt" user="Main.ChrisNeyman" version="1"

Revision 32006-11-11 - ChrisNeyman

Line: 1 to 1
 
META TOPICPARENT

Keck NGAO Team Meeting #2

8:30a - 5:30p

Revision 22006-11-10 - PeterWizinowich

Line: 1 to 1
 
META TOPICPARENT

Keck NGAO Team Meeting #2

8:30a - 5:30p
Tuesday, November 14, 2006
012 Robinson Laboratory, Caltech
Added:
>
>
Telecon attendees: 877-280-4645 passcoed 540030
  Directions: Getting to Caltech (.html) and Caltech campus map (.pdf)

Revision 12006-11-08 - RichardDekany

Line: 1 to 1
Added:
>
>
META TOPICPARENT

Keck NGAO Team Meeting #2

8:30a - 5:30p
Tuesday, November 14, 2006
012 Robinson Laboratory, Caltech

Directions: Getting to Caltech (.html) and Caltech campus map (.pdf)


In propria persona: Adkins, Bouchez, Cameron (am), Dekany, Gavel, Ireland (am), Max, Moore, Neyman, Velur, Wizinowich
In effigie (e.g. on the phone): Bauman (potential), Flicker, Johannson, Le Mignant, Liu, Marchis

Goals:
  • Introduce team structure and responsibilities
  • Review System Requirements Document (Release 1)
  • Review key drivers for each of the NGAO performance and efficiency budgets
  • Review recent trade studies
  • Review Keck Interferometer requirements (N.B. these are not (yet) NGAO requirements imposed by KI)
  • Review instrumentation study strategy for NGAO system design phase

Agenda:

  • 8:00 am Refreshments
  • 8:30 am Welcome and Team Introductions (All)
  • 9:00 am Management Report (Wizinowich) .ppt
    • Review study overall progress, progress against milestones, and summary financial situation
  • 9:30 am Science Requirements Document (Release 1) (Max) .ppt
    • From the SD SEMP: The SRD describes the new system in terms of the needed scientific and technical performance. The document also expresses specific requirements for implementation or design where those requirements are essential to satisfactory integration and interoperation of the new system with other observatory systems.
    • Review changes to science requirements contained in SRD (Release 1) compared to June NGAO proposal
    • Discuss science / engineering team interactions
  • 10:30 am Break
  • 10:45 am Key Performance Drivers (Dekany) .ppt
    • Review the NGAO Required Observing Modes
    • Review the key architecture and technology drivers for each of the 7 Performance and 2 Efficiency Budgets
        • Astrometric Precision (Cameron)
        • Background (Bouchez)
        • Encircled Energy (Gavel)
        • High-Contrast (Macintosh)
        • Photometric Precision (Britton)
        • Polarimetric Precision (Ireland)
        • Transmission (Bouchez)
        • Wavefront Error (Dekany)
        • Observing Efficiency (LeMignant)
        • Observing Uptime (Johansson)
  • 12:15 pm Lunch
  • 1:00 pm Trade Study Report: LGS Asterism Geometry and Size (Flicker) .ppt
    • From the WBS Dictionary: Find the simplest LGS asterism geometry meeting the performance budget goals (e.g. quincunx, ring, 1+triangle, or hex) and the asterism radii. Consider optimization of the Strehl of the tip/tilt stars and the resultant sky coverage as well. Complete when LGS asterism, HO WFS, and LO WFS requirements have been documented.
  • 1:30 pm Trade Study Report: Fixed vs. Variable LGS Asterism (Velur) .ppt
    • From the WBS DIctionary: Consider the cost/benefit of continually varying the LGS asterism radius vs. a fixed number of radii (e.g. 5", 25", 50"). Complete when LGS asterism requirements have been documented.
  • 2:00 pm Keck Interferometry Requirements (Neyman) .ppt
    • Review the KI requirements on delivered wavefront, including wavefront error and polarization
  • 2:30 pm NGAO Instrument Study Strategy (Adkins - RD suggests + Moore) .ppt
    • Review the strategy, scope, organization, and expectations for instrument "proposal-level" development within the NGAO system design phase
    • Discuss science /engineering team interactions
    • Review schedule for initial NGAO instrument concepts (proposed:)
      • Near-infrared Imager
      • Visible Imager
      • Deployable Near-Infrared IFU Spectrograph
    • Review scope of upcoming Trade Study: Science Instrument Reuse
  • 3:45 Break
  • 4:00 Discussion: Upcoming tasks and milestones (Wizinowich) .ppt
  • 4:30 General Discussion (All)
  • 5:30 Adjourn

  • Evening NGAO Dinner in Old Town Pasadena (6:30p)
    • Akbar Cuisine of India ($20) (Wizinowich)
    • Gaucho Grill (Argentinian) ($20) (vote here)
    • Il Fornaio (Italian) ($30) (Dekany)
    • Twin Palms (Californian) ($40) (vote here)
 