NGAO Science Operations

0. Science Operations during the SD phase (up to April 2008)

Follow this link to access the Twiki page that presents the work & studies performed during the System Design phase for NGAO science operations.

1. Science Operations during the PD phase (from May 2008 till 2010)

I start with more questions than answers for our planning. Here is a ppt file presenting my way to look at the process with many questions..

Certainly, the main activities for the Science Operations will be:

  • Develop the Observing Scenarios. This is a task under WBS 3.1.2 (Science Observing Planning and Execution). The Observing scenarios and the Use Cases are captured in the Operations Concept Document (which is a deliverable of WBS 3.2 (Requirements).
  • Develop the Operations Sequences Architecture (WBS 3.4.4) which are likely to be derived from the Use Cases in the OCD. I am not sure yet whether the Operations Sequences Architecture will be included in the OCD.
  • Develop the design for the Multi-system Command Sequencer (WBS 6.1) and User Interfaces (WBS 6.2), etc
Topic attachments
I Attachment Action Size Date Who Comment
pptppt plan_my_work.ppt manage 114.0 K 18 Aug 2008 - 18:53 DavidLeMignant  
Edit | Attach | Printable | Raw View | Backlinks: Web, All Webs | History: r5 < r4 < r3 < r2 < r1 | More topic actions
 
Keck Next Generation Adaptive Optics
This site is powered by the TWiki collaboration platformCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback