Tags:
create new tag
view all tags

NGAO Development Process Standards

Posted below is some material that document the W. M. Keck Observatory Development Phases. The author of these documents is the WMKO Instrumentation Program Manager (SA).

Topic attachments
I Attachment History Action Size Date Who Comment
Microsoft Word filedoc Baseline_Requirements_Document.doc r1 manage 918.5 K 2008-01-25 - 20:44 UnknownUser  
PDFpdf Observing_Operations_Concept_Documents_v3.pdf r1 manage 204.8 K 2008-08-19 - 00:08 UnknownUser  
PDFpdf Overview_of_the_WMKO_Development_Phases.pdf r1 manage 117.2 K 2008-01-25 - 20:43 UnknownUser  
PDFpdf The_WMKO_New_Instrument_Development_Program.pdf r1 manage 1059.7 K 2008-01-25 - 20:43 UnknownUser  
Microsoft Word filedoc system_design_phase.doc r1 manage 77.5 K 2008-01-25 - 20:44 UnknownUser  
Edit | Attach | Watch | Print version | History: r4 < r3 < r2 < r1 | Backlinks | Raw View | Raw edit | More topic actions
Topic revision: r4 - 2008-08-19 - DavidLeMignant
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback