<Keck NGAO Team Meeting #5>

9:50a - 4:00p PST
Wednesday, March 7, 2007
Tele/Videoconference

Dial-in Number: 877-280-4645 Passcode: 540030 Videoconference IP: 128.171.99.70 (Hualalai CR)


In effigie (e.g. on the phone): Adkins, Bauman, Flicker, Dekany, Gavel, Johannson, Le Mignant, Liu, Marchis, Max, Neyman, Velur, Wizinowich

Action Items from the meeting. Status of Action Items as of 03/16/07.

(Tentative) Goals:

  • Review Project Status
  • Review recent Trade Studies

(Tentative) Agenda:

  • 9:50 am Telecommunications check
  • 10:00 am Management Report (Wizinowich) Management Report
    • Review study overall progress, progress against milestones, and summary financial situation
  • 10:30 am Science Team Report (Max) * Max_BHs_in_Nearby_Gals.ppt
  • 10:45 am Systems Engineering Report (Dekany) Systems Engineering Report (.pdf)
    • Review the status of all systems engineering deliverables.
  • 11:15 am Throughput and Emissivity Performance Budgets (Bouchez) emissivity_budget_mtg5.ppt
    • From the WBS Dictionary: Development of optical transmission budgets for each of the science path(s), HOWFS, LOWFS(s), and slow WFS. Development of thermal background budget for the IR science and wavefront sensor instruments
  • 11:45 am Trade Study Report: GLAO for non-NGAO instruments (Flicker) GLAO for non-NGAO instruments (.ppt)
    • From the WBS Dictionary: Consider the relative performance, cost, risk, and schedule of GLAO compensation using an ASM as a wide-field optical relay for non-NGAO instruments. Complete when expected performance benefit for each instrument documented.
  • 12:15 pm Trade Study Report: MOAO vs MCAO Update (Gavel) Report (.pdf)
    • From the WBS Dictionary: This trade study is intended to build our expertise with MOAO & MCAO. The existing MOAO & MCAO design studies should be reviewed. The product should be a summary of the issues related to these two approaches, including an understanding of the potential risks, technical challenges, limitations, advantages and room for improvement with each of these approaches.
    • This trade study was also presented at Meeting 3.

  • 12:45 pm Break

  • 1:15 pm Trade Study Report: Optical relay (Bauman) Report (.ppt)
    • From the WBS Dictionary: Consider the relative performance, cost & risk of OAP, general 2-mirror & Offner relays. Consider image quality vs. FoV? , pupil image quality & the flowdown of requirements onto the (variable distance) LGS wavefront sensor(s). Evaluate science path and wavefront sensor paths to 150? radius, while optimizing the design over a 90? radius (after confirming that these are the correct radii to consider). Complete when an NGAO baseline optical design is selected.
  • 1:45 pm Trade Study Report: NGAO vs. Keck AO upgrades (Wizinowich) Keck AO Upgrade Report (.ppt) KAON461 KAON462
    • From the WBS Dictionary: Consider the feasibility of upgrading one of the existing Keck AO systems incrementally to meet NGAO science requirements. Consider opto-mechanical constraints & upgradeability of embedded & supervisory control systems. Consider impact on science operations during NGAO commissioning. Complete when option assessment documented
  • 2:15 pm Trade Study Report: Interferometry Support Options (Neyman) NGAOIF (.ppt)
    • From the WBS Dictionary: Consider the relative performance, cost, risk & schedule of feeding KI with NGAO or a repackaged version of the current AO system. Decoupling of NGAO from interferometer support may simplify & improve performance of NGAO. The feasibility of maintaining a version of the two current AO systems for KI use should be evaluated. Complete when NGAO baseline architecture selected.
  • 2:45 pm Trade Study Report: Rayleigh Rejection (Velur) Rayleigh Rejection TS (.pdf)
    • From the WBS Dictionary: Evaluate the impact of unwanted Rayleigh backscatter to NGAO system performance. Consider the relative performance, cost, risk & schedule of various strategies for mitigation of LGS Rayleigh backscatter. Techniques include background subtraction, modulation & optimizing projection location. This issue is closely coupled to laser pulse format, with pulsed lasers generally providing more options for Rayleigh mitigation than CW lasers. Complete when NGAO baseline architecture selected.
    • This trade study was also presented at Meeting 3.

  • 3:15 pm Upcoming tasks and milestones (Wizinowich) .ppt
  • 3:30 pm Discussion: Issues pertaining to ongoing and upcoming work (All)

  • 4:00 pm Adjourn

Topic attachments
I Attachment Action Size Date Who Comment
pdfpdf 070307_NGAO_Sys_Eng_Status.pdf manage 2061.1 K 07 Mar 2007 - 16:57 RichardDekany Corrected minor typo 070307
pptppt GLAOnonNGAOinst_rev2.ppt manage 561.5 K 07 Mar 2007 - 04:16 RalfFlicker NGAO TS 3.1.2.1.7
pptppt GLAOnonNGAOinst_rev3.ppt manage 653.0 K 07 Mar 2007 - 18:56 RalfFlicker GLAO TS 3.1.2.1.7
pptppt Keck_AO_Upgrade_TS.ppt manage 459.0 K 07 Mar 2007 - 04:24 PeterWizinowich Keck AO Upgrade TS
pdfpdf MOAOvsMCAODesignStudyReport_Draftv2.1.pdf manage 388.0 K 07 Mar 2007 - 08:01 DonaldGavel  
pdfpdf MOAOvsMCAODesignStudyReport_Draftv2.pdf manage 435.7 K 06 Mar 2007 - 05:43 DonaldGavel  
pptppt Max_BHs_in_Nearby_Gals.ppt manage 680.5 K 07 Mar 2007 - 07:38 ClaireMax  
docdoc Meeting_5_Action_Items.doc manage 37.5 K 08 Mar 2007 - 03:08 PeterWizinowich Action Items
docdoc Meeting_5_Action_Items_Status.doc manage 37.5 K 16 Mar 2007 - 23:24 PeterWizinowich Meeting 5 action items status
pptppt NGAO_meeting_5.ppt manage 286.0 K 07 Mar 2007 - 03:25 PeterWizinowich Meeting 5 management report
pptppt NeymanNGAOmeeting7March07.ppt manage 637.0 K 08 Mar 2007 - 01:57 ChrisNeyman Options for Interferometry with NGAO
pptppt emissivity_budget_mtg5.ppt manage 668.5 K 07 Mar 2007 - 10:17 AntoninBouchez  
pdfpdf velur_NGAO_meeting5.pdf manage 2375.4 K 07 Mar 2007 - 15:58 ViswaVelur Rayleigh rejection TS
pptppt velur_NGAO_meeting5.ppt manage 704.5 K 07 Mar 2007 - 15:59 ViswaVelur Rayleigh rejection TS (PPT file)
Edit | Attach | Printable | Raw View | Backlinks: Web, All Webs | History: r28 < r27 < r26 < r25 < r24 | More topic actions
 
Keck Next Generation Adaptive Optics
This site is powered by the TWiki collaboration platformCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback