<Keck NGAO PD Team Meeting #5>

1:00p - 5:00p PST
11:00a - 3:00p HST
Thursday, February 5, 2009
Tele/Videoconference

Dial-in Number: 877-280-4645 Passcode: 540030
Videoconference IP: 128.171.99.69 (Kamuela CR)


*In effigie (e.g. on the phone or video): Adkins, Bouchez, Dekany, Gavel, Johansson, Kupke, Max, McGrath, Neyman, Velur, Wizinowich

Background materials:

Goals:

  • Select build-to-cost concept descopes to proceed with.
  • Identify build-to-cost concept descopes that require additional evaluation.

Draft Agenda:

  • 3:05. Break
  • 3:25. AO opto-mechanical design architectures - emissivity, throughput & cost impact (Gavel)
  • 4:05. Science instrument options - performance & cost impact (Adkins)
  • 4:35. Auxiliary wavefront sensors - performance & cost impact (Wizinowich)
  • 4:45. General discussion
  • 5:00. End

Topic attachments
I Attachment History Action Size Date Who Comment
PDFpdf 090205_B2C_Performance_Trades.pdf r1 manage 110.8 K 2009-02-05 - 20:56 RichardDekany  
PDFpdf 090205_B2C_Performance_Trades_[Compatibility_Mode].pdf r1 manage 110.8 K 2009-02-05 - 20:54 RichardDekany  
PDFpdf 090205_Design_Concepts_Delacroix.pdf r1 manage 675.4 K 2009-02-05 - 21:50 RichardDekany  
PowerPointppt B2C_Report_v2.ppt r1 manage 599.5 K 2009-01-26 - 20:42 PeterWizinowich  
PowerPointppt B2C_Report_v3.ppt r1 manage 1385.0 K 2009-01-31 - 03:10 PeterWizinowich  
PowerPointppt B2C_Report_v4.ppt r1 manage 1277.5 K 2009-02-05 - 03:26 PeterWizinowich  
PowerPointppt B2C_Report_v5.ppt r1 manage 1172.0 K 2009-02-05 - 20:38 PeterWizinowich  
Microsoft Excel Spreadsheetxls Cost_savings_ideas_evaluation_v10.xls r1 manage 242.0 K 2009-02-05 - 03:27 PeterWizinowich  
Microsoft Excel Spreadsheetxls Cost_savings_ideas_evaluation_v8.xls r1 manage 229.0 K 2009-01-26 - 20:38 PeterWizinowich  
Microsoft Excel Spreadsheetxls Cost_savings_ideas_evaluation_v9.xls r1 manage 239.5 K 2009-01-31 - 03:11 PeterWizinowich  
PowerPointpptx Design_Concepts_Presentation_2.pptx r1 manage 1910.4 K 2009-02-05 - 21:17 UnknownUser LGS WFS concept for 4 fixed, 3 patrolling beacon pickoffs.
PowerPointppt MaxMcGrath.ppt r1 manage 104.0 K 2009-02-05 - 23:13 UnknownUser  
PowerPointppt NGAO_Instrumentation_B2C_v2.ppt r1 manage 408.5 K 2009-02-05 - 21:35 UnknownUser Science Instrumentation Design/Build to Cost Status
PowerPointppt OptoMechanicalDesign_BuildToCostMeeting_Feb5,2009.ppt r1 manage 388.0 K 2009-02-05 - 21:41 UnknownUser  
PowerPointppt ThroughputEmissivityStudy.ppt r1 manage 589.0 K 2009-02-05 - 21:41 UnknownUser  
Edit | Attach | Watch | Print version | History: r13 < r12 < r11 < r10 < r9 | Backlinks | Raw View | Raw edit | More topic actions
Topic revision: r13 - 2009-03-12 - PeterWizinowich
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback