<Keck NGAO Team Meeting #9>

10:00a - 3:30p PDT
Friday, August 24, 2007
Tele/Videoconference

Dial-in Number: 877-280-4645 Passcode: 540030 Videoconference IP: 128.171.99.70 (Hualalai CR)


*In effigie (e.g. on the phone or video) - all tentative pending agenda: Adkins, Bauman, Bell, Chin, Dekany, Flicker, Gavel, Johansson, Kupke, Le Mignant, Lockwood, Max, Moore, Neyman, Reinig, Stomski, Velur, Wizinowich


Action Items from the meeting. Minutes from the meeting.

Goals

  • Update team on results of system architecture phase
  • Kickoff of AO Design effort (WBS 3.2)
  • Kickoff of Laser Projection System Design effort (WBS 3.3)

Agenda

10:00 am Review of project plan & schedule, with emphasis on 3.2 & 3.3 (Gavel) NGAOProjectPlanReview.pdf

10:30 am Inputs to System Design Phase & Expected Outputs (Wizinowich) Design Inputs & Outputs KAON summary Overview of Requirements Documents Science Requirements Summary

11:05 am Functional Requirements (Neyman) Functional Requirements Overview FRD Sample

11:15 am Outputs of the system architecture phase (Dekany) KAON 499 - NGAO System Architecture Definition Preliminary Cascaded Relay Layout

12:15 pm Lunch break

12:45 pm Open questions going into the system design phase (Dekany) 070824_Open_Issues.pdf

1:45 pm Discussion of roles & teams, charge & deliverables (Gavel) Discussion_of_Roles_and_Teams,_Charge_and.pdf SystemDesignAssignmentMatrix.pdf

2:45 pm Further clarification

3:30 pm Done

Topic attachments
I Attachment Action Size Date Who Comment
pdfpdf 070824_Open_Issues.pdf manage 1581.8 K 24 Aug 2007 - 09:52 RichardDekany  
xlsxls Architecture_reqments_summary_v7.xls manage 35.5 K 22 Aug 2007 - 03:34 PeterWizinowich  
pptppt CascadeOpticsJB.ppt manage 1560.5 K 24 Aug 2007 - 15:40 PeterWizinowich  
pdfpdf Meeting_9_Discussion_of_Roles_and_Teams,_Charge_and.pdf manage 100.1 K 24 Aug 2007 - 05:46 DonaldGavel  
pptppt Meeting_9_Discussion_of_Roles_and_Teams,_Charge_and.ppt manage 284.0 K 24 Aug 2007 - 05:46 DonaldGavel  
pdfpdf Meeting_9_NGAOProjectPlanReview.pdf manage 161.3 K 24 Aug 2007 - 05:47 DonaldGavel  
pptppt Meeting_9_NGAOProjectPlanReview.ppt manage 447.5 K 24 Aug 2007 - 05:48 DonaldGavel  
pptppt Meeting_9_sys_des_input__output.ppt manage 337.5 K 24 Aug 2007 - 02:49 PeterWizinowich  
pdfpdf NGAOTeam9Minutes.pdf manage 27.2 K 27 Aug 2007 - 20:25 ChrisNeyman Meeting minutes
pptppt NGAOgroupMeeting_CN_2007Aug24.ppt manage 444.0 K 24 Aug 2007 - 05:59 ChrisNeyman Comments on Functional Requirements
docdoc Overview_of_NGAO_Requirements_Documents.doc manage 30.5 K 22 Aug 2007 - 03:06 PeterWizinowich  
docdoc Sec72_AO_EncOpticalRelay.doc manage 111.5 K 24 Aug 2007 - 00:54 PeterWizinowich  
pdfpdf SystemDesignAssignmentMatrix.pdf manage 46.9 K 24 Aug 2007 - 06:00 DonaldGavel  
elsedocx Team_Meeting_9_Agenda.docx manage 330.7 K 15 Aug 2007 - 04:25 DonaldGavel  
Edit | Attach | Printable | Raw View | Backlinks: Web, All Webs | History: r15 < r14 < r13 < r12 < r11 | More topic actions
 
Keck Next Generation Adaptive Optics
This site is powered by the TWiki collaboration platformCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback