r5 - 10 Sep 2008 - 03:45:31 - PeterWizinowichYou are here: TWiki >  Keck/NGAO Web > PDPlanning
This collection is for maintaining the Preliminary Design Phase Management Plan.

Preliminary Design (PD) Phase Plan from System Design Review (SDR) Systems Engineering Management Plan (SEMP):

Replan #1 (based on SDR & Personnel Changes):

Topic attachments
I Attachment Action Size Date Who Comment
elsempp NGAO_Design_v14.mpp manage 811.0 K 17 Jul 2008 - 17:39 PeterWizinowich  
elsempp NGAO_Design_v17.mpp manage 884.0 K 17 Jul 2008 - 17:41 PeterWizinowich  
elsempp NGAO_Design_v18_emj3.mpp manage 847.5 K 10 Sep 2008 - 03:42 PeterWizinowich  
xlsxls NGAO_PD_v14_Work.xls manage 40.5 K 17 Jul 2008 - 17:40 PeterWizinowich  
xlsxls NGAO_PD_v17_Work.xls manage 38.5 K 14 Aug 2008 - 19:56 PeterWizinowich  
Edit | Attach | Printable | Raw View | Backlinks: Web, All Webs | History: r5 < r4 < r3 < r2 < r1 | More topic actions
 
Keck Next Generation Adaptive Optics
This site is powered by the TWiki collaboration platformCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback