Chicago Sum Frequency Laser Upgrade Documents cooling schematic.pdf: CSFL cooling schematic laser.pdf: current CSFL schematic LGS inventory (LGS inventory...
AO Software External Instrument Interface Document file for instrument interfaces(ao if.h) System User Guide Interface Modifications (v3)...
RickBurruss 23 Mar 2010
Laser Launch Telescope subsystem The laser launch telescope is a 45 cm Magnin reflecting telescope mounted on the optical axis of the Hale Telescope, behind the secondary...
Laser Automation Computer Users Guide LGS computer How To 070518.txt S. Guiwits, 6/12/07 Requirements, etc. 617: Laser Automation Computer Requirements...
February 27 March 1, 2007 LGS engineering run Safety documents FAA documents: letter of non objection (0 45 deg. zenith angle). Securitas spotters...
January 5 7, 2010 LGS SWIFT observing run Nightly Summaries 1/06/10 UT Ash and moderate to thick cirrus. Laser power 6.5 7.3 W. Closed until 22:00 due to ash...
LGS Observing Runs 2008 2009 2005 2007 observing runs Semester 2008A April 9, 2008 NGS engineering May 18, 2008 NGS engineering June 15 21,...
October 8 13, 2009 LGS PHARO/SWIFT observing run Nightly Summaries 10/09/09 UT Closed due to ash until 2:20am. Observed LCROSS impact. 10/10/09 UT Closed due...
Oct. 9, 2009 UT LCROSS Impact Imaging Preliminary Results Palomar AO image of Cabeus crater 10s after Centaur impact: ... and 15s after impact. No obvious detection...
August 6 10, 2009 LGS SWIFT observing run Nightly Summaries Aug. 7, 2009 UT Clear, 2.0 3.0` seeing due to primary mirror 6 C hotter than dome air. Laser power...
Palomar LGS Test Plan Library Please list your test plans by observing run, and add a link from the observing run page. Test plan template: doc, pdf General AO setup...
AO Operational Procedures This is a list of procedures used to operate the AO system. How to run the AO system with the off axis relay optics bench installed...
January 10 16, 2009 LGS observing run Nightly Summaries 1/11/09 UT (SWIFT LGS engineering) Clear and windy. Laser power 5.1 4.9 W. Seeing 4 6`. Opened for...
December 11 12, 2008 LGS observing run Nightly Summaries 12/12/08 UT Mostly cloudy, 1.0` seeing in R. Performed NGS observations with SWIFT most of night. Performance...
October 14 16, 2008 LGS observing run Nightly Summaries 10/15/08 UT Clear, seeing ~1.9` in V. Laser power 6.0 W. Attempted to diagnose BTO servo loop instability...
September 15 22, 2008 LGS observing run Nightly Summaries 9/16/08 UT Scattered clouds, seeing 0.8` in K. Spent first half of the night on AO/PHARO/BTO setup after...
June 14 20, 2008 LGS observing run Night logs and results 6/15/08 UT Photometric. Completed various calibrations and testing of the LGS system. Tested primary...
August 11 13, 2008 LGS observing run Night logs and results 8/12/08 UT Clear, seeing 0.8` in K. Aligned BTO, laser. Laser power 7.5 7.2 W. Canceled LGS operations...
Palomar Automated Airspace Safety Systems Palomar`s multi tiered airspace safety system consists of an all sky visible camera (ASCAM), a narrow field mid infrared...
AO Cassegrain Cage Setup Wiring diagrams AO wiring diagram: DWG,PDF J. Hickey 6/22/06 Installation Documents AO bench setup and checkout: doc, Chopper...
LGS Engineering Runs 2005 present 2005 2006 summary Semester 2005A June 30 July 6, 2005 August 17 20, 2005 Semester 2005B September 19 22, 2005...
December 12 13, 2005 NGS Engineering Run Test schedule: Test plans: Night logs: AntoninBouchez 12 May 2006
May 18, 2008 NGS Engineering Goals While basic checkout and calibration of the NGS AO system were successfully accomplished on April 9, 2008, performance tests were...
% WDSORB: Computing orbits for epoch 2008.3815 WDS00057 4549 00 05 40.280 45 48 44.80 2000.0 vmag 8.98 v2mag 9.15 sep 5.949 pa 185.7 WDS00057 4549 00 05...
Ephemeris / WWW USER Sat May 17 19:17:45 2008 Pasadena, USA / Horizons Target...
April 9, 2008 NGS Engineering Goals The Palomar AO system has recently undergone a significant refurbishment. In the 4 months since November 29, 2007, we have:...
% WDSORB: Computing orbits for epoch 2008.2746 WDS00057 4549 00 05 40.280 45 48 44.80 2000.0 vmag 8.98 v2mag 9.15 sep 5.950 pa 185.7 WDS00057 4549 00 05...
August 23 25, 2007 LGS observing run Night logs and results 8/24/07 UT Photometric. Completed BTO setup for 1 hr. Measured LLT imaging performance (1.9` stars...
September 18 21, 2007 LGS observing run Night logs and results 9/19/07 UT Never opened due to high humidity and AO dynamic aperture device (DAD) failure. Laser...
October 22 27, 2007 LGS Observing Run Night logs and results 10/23/07 UT Observing cancelled due to fire danger and high winds. 10/24/07 UT Observing cancelled...
Solidworks Models of the LLT bench LLT FULL ASSEMBLY 18 Inch Diagnostics.EASM: Edrawings file of full LLT model H. Petrie, 2/25/08. Externally supplied SW part...
Zemax Models of the LLT bench Original models of LLT optical path by Chris Shelton (as designed): ZMX: telescope through the FSM, and a star camera. This has...
From C. Shelton, 06/02/06: Here`s a to do list, at least what I can remember. Is there anything else you can think of? Finish the `tasks left for next week` from...
Statistics for Palomar/PalmLGS Web Month: Topic views: Topic saves: File uploads: Most popular topic views: Top contributors for topic...
Beam Transfer Optics The beam transfer optics subsystem delivers the 589nm laser beam from the Coude lab to the laser launch telescope located behind the Hale telescope...
September 5 7, 2006 LGS Engineering Run Project schedules and task lists laser upgrade schedule LGS IPT meeting minutes, with task list JPL AO meeting...
Laser IPT Meeting Minutes Laser integrated produce team meetings are held Mondays 9:00 10:00am in 012 Robinson. The call in number is: 866 674 1191 x8203140....
PALMAO bench The PALMAO optical bench is placed onto the Cassegrain focus of the 200` Hale telescope. The system contains (1) the AO science instrument; (2) the deformable...
Error budgets and Performance Models LGS flux analysis v2.1 A. Bouchez Old versions: https://www.oir.caltech.edu/twiki oir/pub/Palomar/PalmLGS/ErrorBudget...
July 23 28, 2007 LGS observing run Night logs and results 7/24/07 UT Clear, excellent seeing. Completed laser and BTO setup for first 4 hrs. Then measured bright...
April 23 27, 2007 LGS observing run Night logs and results 4/24/07 UT Closed due to fog until 2:30am, then opened for NGS engineering due to low laser power...
May 23 26, 2007 LGS observing run Night logs and results 5/24/07 UT Laser and BTO setup until 10:00pm. Then checked LLT boresighting no adjustments necessary...
LGS Diagnostic Benches by Anna Moore on behalf of the LGS team (COO, JPL and Univ. of Chicago) Update ppt 040909 by Anna Moore and Hal Petrie summary SW.ppt:...
Management IPT Meeting Minutes Management integrated produce team meetings are held biweekly, Wednesdays 8:00 10:00am, at JPL. Management Mtg. (v2, edited 6/...
Welcome to Michael Martin`s twiki page LabVIEW Laser Diagnostics GUI.bmp:LabVIEW Laser Diagnostics GUI AnnaMoore 16 Jun 2007
MitchTroy 10 Apr 2007 JPG:
April 2 6, 2007 LGS observing run Safety documents FAA documents: letter of non objection (0 45 deg. zenith angle). Securitas spotters are scheduled...
Drawings Path for Feb `07(EASM) bench, WFS section As built April `07 (ao bench 070401.tar.gz) JennyRoberts 30 Jan 2007
June 12 14, 2006 LGS Engineering Run Pre run engineering work 6/5 6/6 BTO work schedule laser sched 060606.pdf: CSFL tasks for 6/06 LGS engineering run...
Palomar AO engineering run summary (2005 2006) Semester 06B UT Date Mode Conditions Seeing Log Comments 10/14/06 LGS rain link...
LGS Team Meetings Team meetings are held once per month, on 3:30pm 5:00pm on Thursdays in 023 Robinson on the Caltech campus. A video conference system is available...
AO Acquistion Camera Pulnix LGS platescale: Acq LGS platescale.txt A. Bouchez 7/17/06
Dynamic Aperture Device JennyRoberts 30 Jan 2007
PALM LGS High Order Wavefront Sensor AWFS Dynamic Aperture.doc: Two page summary of the Dynamic Aperture Device (Trash.Palomar PalmLGSDAD) RichardDekany...
January 5 7, 2007 LGS engineering run Safety documents Cleared by FAA for laser projection 18:00 05:45 PST. Spotters scheduled to be on site 20:00 06:...
December 6 8, 2006 LGS engineering run Schedules and calendars Dec. engineering run personnel schedule (v3) A. Bouchez 12/05/06 (v2) Safety documents...
LGS Project Schedules FY07 lgs 0612 personnel shed v2.pdf: 12/06 Palomar LGS schedule v2 AB 11/29/06 FY06 laser 060510.pdf: Laser schedule May June...
August 2006 Laser Move from Coude to AO lab Laser move preparations Pictures taken at Palomar by VNV: JPG: ID of connector 0.155` (may need to be reamed...
October 11 13, 2006 LGS Engineering Run Project schedules and task lists task schedule, v1 A. Bouchez 10/2/06 Oct. engineering run personnel schedule...
Cabling and Data Transfer by Anna Moore and John Henning The following summarises the current cabling installed on the 200inch telescope. We describe how signals from...
Components for the data communcation by Anna Moore and John Henning AnnaMoore 30 Sep 2006
Zemax Models of the Coude bench AnnaMoore 28 Sep 2006
Solidworks Models of the LLT bench by Anna Moore and Hal Petrie Externally supplied SW part models of components Newport U100 A2K NL.SLDPRT: Newport 1` kinematic...
Palomar Science Meeting 2006 Presentations PALAO LGS Science meeting CS.ppt: AO presentation part 1 C. Shelton PALAO LGS Science meeting AB.ppt: AO presentation...
OIR 1 Project Publications Available Information SPIE Conference #5490, Glassgow, Scotland, U.K. (2004) SPIE Conference #6272, Orlando, FL, U.S.A (...
July 11 13, 2006 LGS Engineering Run Project schedules and task lists plan for new CSFL etalons LGS IPT meeting minutes Safety documents letter of...
PALAO bench subsystem The PALAO bench is placed onto the 200` Hale telescope at the Cassegrain focus and contains (1) the science instrument; (2) the adaptive optics...
LGS AO Library LGS AO system characterization Dam et al. 2006, The W.M. Keck Observatory laser guide star adaptive optics system: Performance characterization...
Astronomical Telescopes and Instrumentation 2006 mgsu paper.pdf: Velur et al., Multiple Guide Star Unit: Palomar`s Tomograph, 6272 188 (preprint). MGSU poster...
Spie2006 Orlando, 24 31 May 2006 Presentations and posters spie06 palomarlgs.pdf: Bouchez et al., Laser Guide Star Adaptive Optics at Palomar Observatory,...
05/16/06 Experiments and Analysis Conclusions I suggest replacing the M2 mirror with an enhanced aluminum version, such as CVI part EAV PM 4050 C ($730). This will...
Version 2 (5:15pm, 6/2/06) Monday 6/5 0800 AB arrives at Palomar 0800 1000 AB: Complete BTO breadboard setup and 660nm laser alignment. 1000 CS arrives at Palomar...
All, I just returned from a long day at Palomar. Here`s what I got done on the BtO: (I will also post this on the TWiki site BtO page...) 1. Checked stability and...
Chicago Sum Frequency Laser CSFL upgrade CSFL operational documents
Testing 1, 2, 3.... AntoninBouchez 02 Jun 2006
CSFL upgrade purchase list: 1. Coarse Filter parts : a. Filter enclosure : Mc Master CArr # 6882K1 Bttm Load Hi Purity Single Cartridge Housing for 9 3/4 To...
ViswaVelur 13 May 2006 Optics.xls: Optics inventory EEC, VNV 5/12/06 Inventory.xls: General inventory (sans optics) EEC, VNV 5/12/06
Vendor list Non linear Crystal databaseDocument Actions last edited 3 months ago by abouchez Conex systems, Inc. San Ramon, CA Ph: 925 735 8825 Contact Ting...
Astronomical Telescopes and Instrumentation 2006 Advances in adaptive optics CSFL spie.pdf: preprint of paper on LGS testbed at Palomar observatory ViswaVelur...
August 17 20, 2005 NGS Engineering Run Test schedule: 050818 engplan v2.pdf: NGS Engineering schedule v2 Test plans: Night logs: AntoninBouchez 13 May 2006
September 19 22, 2005 LGS Engineering Run Test schedule: 050920 engplan v2.pdf: LGS engineering test schedule v2 Test plans: Night logs: palm lgs log...
February 9 11, 2006 NGS Engineering Run Test schedule: lgs0602 schedule v2.xls: Engineering test schedule, v2.1 Test plans: testplan 0602 lowfs perf.pdf: LOWFS...
January 11 12, 2006 NGS Engineering Run Test schedule: lgs0601 schedule v4.xls: LGS Engineering test plan v4 Test plans: Night logs: AntoninBouchez 12 May...
November 14 18, 2005 LGS Engineering Run Test schedule: lgs0511 schedule v2.xls: LGS Engineering schedule v2 Test plans: Night logs: palm lgs log 051116.txt...
April 13 15, 2006 LGS Engineering Run Test schedule: lgs0604 schedule v3.xls: lgs0604 schedule v3.xls Test plans: Night logs: https://www.oir.caltech.edu...
Engineering Test Plan (v3) Testing 1, 2, 3. AntoninBouchez 11 Apr 2006
OIR 1 Project Proposals Available Information ... (advanced search)
Palomar/PalmLGS Web Preferences The following settings are web preferences of the Palomar/PalmLGS web. These preferences overwrite the site level preferences...
OIR 1 Project Reviews Available Information Pre project Reviews Feasibility Study Review Conceptual Design Review Preliminary Design Review...
OIR 1 Project Commissioning Available Information Commissioning Plans Engineering run xx/xx/xx yy/yy/yy ... (advanced search)
OIR 1 Project Management Available Information ... (advanced search)
OIR 1 Project Science Case Available Information ... (advanced search)
OIR 1 Project Technical Available Information Requirements Documents Optical Designs CAD Models Interface Control Documents Component and...
See also the verbose 1 .
TWiki`s Palomar/PalmLGS web /Palomar/PalmLGS The 1 web of TWiki. TWiki is a Web Based Collaboration Platform for the Enterprise.
This is a subscription service to be automatically notified by e mail when topics change in this 1 web. This is a convenient service, so you do not have to come...
1 Web Create New Topic Index Search Changes Notifications Statistics Preferences
See also the faster 1

 

Show 10, 20, 50, 100, 500, 1000 results per page, or show all.

Related topics: RSS feed, rounded corners RSS feed, ATOM feed, WebNotify, site changes, site map

Edit | Attach | Watch | Print version | History: r2 < r1 | Backlinks | Raw View | Raw edit | More topic actions
Topic revision: r2 - 2005-03-28 - TWikiContributor
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback