Tags:
create new tag
view all tags

Recent Changes in Palomar/PalmLGS Web retrieved at 12:24 (GMT)

Chicago Sum Frequency Laser Upgrade Documents cooling schematic.pdf: CSFL cooling schematic laser.pdf: current CSFL schematic LGS inventory (LGS inventory...
AO Software External Instrument Interface Document file for instrument interfaces(ao if.h) System User Guide Interface Modifications (v3)...
RickBurruss 23 Mar 2010
February 27 March 1, 2007 LGS engineering run Safety documents FAA documents: letter of non objection (0 45 deg. zenith angle). Securitas spotters...
Laser Automation Computer Users Guide LGS computer How To 070518.txt S. Guiwits, 6/12/07 Requirements, etc. 617: Laser Automation Computer Requirements...
Laser Launch Telescope subsystem The laser launch telescope is a 45 cm Magnin reflecting telescope mounted on the optical axis of the Hale Telescope, behind the secondary...
January 5 7, 2010 LGS SWIFT observing run Nightly Summaries 1/06/10 UT Ash and moderate to thick cirrus. Laser power 6.5 7.3 W. Closed until 22:00 due to ash...
LGS Observing Runs 2008 2009 2005 2007 observing runs Semester 2008A April 9, 2008 NGS engineering May 18, 2008 NGS engineering June 15 21,...
October 8 13, 2009 LGS PHARO/SWIFT observing run Nightly Summaries 10/09/09 UT Closed due to ash until 2:20am. Observed LCROSS impact. 10/10/09 UT Closed due...
Oct. 9, 2009 UT LCROSS Impact Imaging Preliminary Results Palomar AO image of Cabeus crater 10s after Centaur impact: ... and 15s after impact. No obvious detection...
August 6 10, 2009 LGS SWIFT observing run Nightly Summaries Aug. 7, 2009 UT Clear, 2.0 3.0` seeing due to primary mirror 6 C hotter than dome air. Laser power...
Palomar LGS Test Plan Library Please list your test plans by observing run, and add a link from the observing run page. Test plan template: doc, pdf General AO setup...
AO Operational Procedures This is a list of procedures used to operate the AO system. How to run the AO system with the off axis relay optics bench installed...
January 10 16, 2009 LGS observing run Nightly Summaries 1/11/09 UT (SWIFT LGS engineering) Clear and windy. Laser power 5.1 4.9 W. Seeing 4 6`. Opened for...
December 11 12, 2008 LGS observing run Nightly Summaries 12/12/08 UT Mostly cloudy, 1.0` seeing in R. Performed NGS observations with SWIFT most of night. Performance...
October 14 16, 2008 LGS observing run Nightly Summaries 10/15/08 UT Clear, seeing ~1.9` in V. Laser power 6.0 W. Attempted to diagnose BTO servo loop instability...
September 15 22, 2008 LGS observing run Nightly Summaries 9/16/08 UT Scattered clouds, seeing 0.8` in K. Spent first half of the night on AO/PHARO/BTO setup after...
June 14 20, 2008 LGS observing run Night logs and results 6/15/08 UT Photometric. Completed various calibrations and testing of the LGS system. Tested primary...
August 11 13, 2008 LGS observing run Night logs and results 8/12/08 UT Clear, seeing 0.8` in K. Aligned BTO, laser. Laser power 7.5 7.2 W. Canceled LGS operations...
Palomar Automated Airspace Safety Systems Palomar`s multi tiered airspace safety system consists of an all sky visible camera (ASCAM), a narrow field mid infrared...

«Previous   1  2  3  4  5  6   Next»

Show 10, 20, 50, 100, 500, 1000 results per page, or show all.

Related topics: RSS feed, rounded corners RSS feed, ATOM feed, WebNotify, site changes, site map

Edit | Attach | Watch | Print version | History: r2 < r1 | Backlinks | Raw View | Raw edit | More topic actions
Topic revision: r2 - 2005-03-28 - TWikiContributor
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback