August 6-10, 2009 LGS-SWIFT observing runNightly Summaries | ||||||||
Line: 14 to 14 | ||||||||
Aug. 10, 2009 UT Clear, ~0.8" seeing. Laser power 9.0-9.5 W. Gathered LGS-SWIFT PSF data. Observed 2.. science target so far. Return as high as 60000 DN/s/subap (10:25 UT). | ||||||||
Added: | ||||||||
> > |
Aug. 11, 2009 UT Clear, ~1.0" seeing. Laser power 9.5 W. Return 75000 DN/s/subap (3:55 UT). | |||||||
Safety Documents
|
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
August 6-10, 2009 LGS-SWIFT observing runNightly Summaries | ||||||||
Line: 12 to 12 | ||||||||
Clear, ~1.0" seeing. Laser power 9.0 W. Tested target centering strategies. Observed 3 science targets for 200 min. integration time with excellent AO performance (~0.4" FWHM)
Aug. 10, 2009 UT | ||||||||
Changed: | ||||||||
< < | Clear, ~0.8" seeing. Laser power 9.5 W. Gathered LGS-SWIFT PSF data. Observed 2.. science target so far. | |||||||
> > | Clear, ~0.8" seeing. Laser power 9.0-9.5 W. Gathered LGS-SWIFT PSF data. Observed 2.. science target so far. Return as high as 60000 DN/s/subap (10:25 UT). | |||||||
Safety Documents
|
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
August 6-10, 2009 LGS-SWIFT observing runNightly Summaries | ||||||||
Line: 12 to 12 | ||||||||
Clear, ~1.0" seeing. Laser power 9.0 W. Tested target centering strategies. Observed 3 science targets for 200 min. integration time with excellent AO performance (~0.4" FWHM)
Aug. 10, 2009 UT | ||||||||
Changed: | ||||||||
< < | Clear, ~0.8" seeing. Laser power 9.5 W. Gathered LGS-SWIFT PSF data. Observed 1.. science target so far. | |||||||
> > | Clear, ~0.8" seeing. Laser power 9.5 W. Gathered LGS-SWIFT PSF data. Observed 2.. science target so far. | |||||||
Safety Documents
|
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
August 6-10, 2009 LGS-SWIFT observing runNightly Summaries | ||||||||
Line: 6 to 6 | ||||||||
Clear, 2.0-3.0" seeing due to primary mirror 6 C hotter than dome air. Laser power 6.5 W. Performed LGS setup tasks. Observed 2 LGS-AO science objects in second half of night, with poor AO performance. Lost NGS frequently due to poor seeing and bright sky.
Aug. 8, 2009 UT | ||||||||
Changed: | ||||||||
< < | Clear, ~1.4" seeing. Laser power 8.6 W. Boresighted LLT (required ~120" move to W). Tested laser chirping: Found no improvement, but laser unstable at high chirping rates. Closed 10pm-2am due to high humidity. Observed 1 LGS science object for 105 min. integration with good AO performance (~0.75" FWHM). | |||||||
> > | Clear, ~1.4" seeing. Laser power 8.6 W. Boresighted LLT (required ~120" move to W). Tested laser chirping: Found no improvement, but laser unstable at high chirping rates. Closed 10pm-2am due to high humidity. Observed 1 LGS science object for 90 min. integration with good AO performance (~0.75" FWHM). | |||||||
Aug. 9, 2009 UT | ||||||||
Changed: | ||||||||
< < | Clear, ~1.0" seeing. Laser power 9.0 W. Tested target centering strategies. Observed 3 science targets for 200 min. integration time with excellent AO performance (~0.4" FWHM?) | |||||||
> > | Clear, ~1.0" seeing. Laser power 9.0 W. Tested target centering strategies. Observed 3 science targets for 200 min. integration time with excellent AO performance (~0.4" FWHM)
Aug. 10, 2009 UT Clear, ~0.8" seeing. Laser power 9.5 W. Gathered LGS-SWIFT PSF data. Observed 1.. science target so far. | |||||||
Safety Documents
|
Line: 1 to 1 | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
August 6-10, 2009 LGS-SWIFT observing runNightly Summaries | |||||||||||||
Line: 6 to 6 | |||||||||||||
Clear, 2.0-3.0" seeing due to primary mirror 6 C hotter than dome air. Laser power 6.5 W. Performed LGS setup tasks. Observed 2 LGS-AO science objects in second half of night, with poor AO performance. Lost NGS frequently due to poor seeing and bright sky.
Aug. 8, 2009 UT | |||||||||||||
Changed: | |||||||||||||
< < | Clear, ~1.4" seeing. Laser power 8.6 W. Boresighted LLT (required ~120" move to W. Final: [73,37]). Tested laser chirping: Found no improvement, but laser unstable at high chirping rates. Closed 10pm-2am due to high humidity. Observed 1 LGS science object with good AO performance (~0.75" FWHM). | ||||||||||||
> > | Clear, ~1.4" seeing. Laser power 8.6 W. Boresighted LLT (required ~120" move to W). Tested laser chirping: Found no improvement, but laser unstable at high chirping rates. Closed 10pm-2am due to high humidity. Observed 1 LGS science object for 105 min. integration with good AO performance (~0.75" FWHM).
Aug. 9, 2009 UT Clear, ~1.0" seeing. Laser power 9.0 W. Tested target centering strategies. Observed 3 science targets for 200 min. integration time with excellent AO performance (~0.4" FWHM?) | ||||||||||||
Safety Documents
| |||||||||||||
Line: 21 to 24 | |||||||||||||
Changed: | |||||||||||||
< < |
| ||||||||||||
> > | |||||||||||||
Personnel schedule
| |||||||||||||
Changed: | |||||||||||||
< < |
| ||||||||||||
> > |
| ||||||||||||
| |||||||||||||
Changed: | |||||||||||||
< < |
| ||||||||||||
> > |
| ||||||||||||
Test Plans and ProceduresPlease post your test plans on the Test Plan Library page, and add a link below. | |||||||||||||
Line: 66 to 69 | |||||||||||||
| |||||||||||||
Added: | |||||||||||||
> > |
|
Line: 1 to 1 | |||||||||
---|---|---|---|---|---|---|---|---|---|
August 6-10, 2009 LGS-SWIFT observing runNightly Summaries | |||||||||
Added: | |||||||||
> > | Aug. 7, 2009 UT Clear, 2.0-3.0" seeing due to primary mirror 6 C hotter than dome air. Laser power 6.5 W. Performed LGS setup tasks. Observed 2 LGS-AO science objects in second half of night, with poor AO performance. Lost NGS frequently due to poor seeing and bright sky. Aug. 8, 2009 UT Clear, ~1.4" seeing. Laser power 8.6 W. Boresighted LLT (required ~120" move to W. Final: [73,37]). Tested laser chirping: Found no improvement, but laser unstable at high chirping rates. Closed 10pm-2am due to high humidity. Observed 1 LGS science object with good AO performance (~0.75" FWHM). | ||||||||
Safety Documents
| |||||||||
Line: 14 to 20 | |||||||||
Changed: | |||||||||
< < |
| ||||||||
> > |
| ||||||||
Personnel schedule
| |||||||||
Line: 54 to 60 | |||||||||
| |||||||||
Changed: | |||||||||
< < |
| ||||||||
> > |
| ||||||||
| |||||||||
Added: | |||||||||
> > |
|
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
August 6-10, 2009 LGS-SWIFT observing runNightly Summaries | ||||||||
Line: 13 to 13 | ||||||||
| ||||||||
Changed: | ||||||||
< < |
| |||||||
> > |
| |||||||
Personnel schedule | ||||||||
Line: 53 to 53 | ||||||||
| ||||||||
Changed: | ||||||||
< < |
| |||||||
> > |
| |||||||
| ||||||||
Changed: | ||||||||
< < |
| |||||||
> > |
|
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
August 6-10, 2009 LGS-SWIFT observing runNightly Summaries | ||||||||
Line: 36 to 36 | ||||||||
Changed: | ||||||||
< < | ||||||||
> > | ||||||||
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
August 6-10, 2009 LGS-SWIFT observing runNightly Summaries | ||||||||
Line: 11 to 11 | ||||||||
| ||||||||
Changed: | ||||||||
< < |
| |||||||
> > | ||||||||
| ||||||||
Line: 59 to 56 | ||||||||
| ||||||||
Added: | ||||||||
> > |
|
Line: 1 to 1 | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
August 6-10, 2009 LGS-SWIFT observing runNightly Summaries | |||||||||||||
Line: 13 to 13 | |||||||||||||
| |||||||||||||
Changed: | |||||||||||||
< < | |||||||||||||
> > |
| ||||||||||||
Personnel schedule
| |||||||||||||
Changed: | |||||||||||||
< < |
| ||||||||||||
> > |
| ||||||||||||
| |||||||||||||
Changed: | |||||||||||||
< < |
| ||||||||||||
> > |
| ||||||||||||
Test Plans and Procedures | |||||||||||||
Line: 31 to 31 | |||||||||||||
Changed: | |||||||||||||
< < | |||||||||||||
> > | |||||||||||||
Line: 55 to 55 | |||||||||||||
| |||||||||||||
Changed: | |||||||||||||
< < |
| ||||||||||||
> > |
| ||||||||||||
|
Line: 1 to 1 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
August 6-10, 2009 LGS-SWIFT observing runNightly SummariesSafety Documents | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Changed: | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
< < |
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||
> > |
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||
Personnel schedule | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Changed: | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
< < |
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||
> > |
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||
Test Plans and ProceduresPlease post your test plans on the Test Plan Library page, and add a link below. | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line: 48 to 44 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Changed: | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
< < | Closed-dome tests: | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
> > | Engineering Experiments (8/6/09) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Changed: | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
< < |
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||
> > |
|
Line: 1 to 1 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Added: | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
> > |
August 6-10, 2009 LGS-SWIFT observing runNightly SummariesSafety Documents
Personnel schedule