While basic checkout and calibration of the NGS-AO system were successfully accomplished on April 9, 2008, performance tests were not possible due to clouds and poor seeing. The primary goal of this additional NGS engineering night is to complete the performance characterization of the NGS-AO system after the winter 07/08 optical bench relayout. A secondary goal is the testing of a new iterative reconstructor by L. Lessard and D. MacMynowski.
Personnel schedule
Planning to be present on 5/18/08: Bouchez, Lessard, Roberts, MacMynowski.
Procedures and test plans
Please post your test plans on the Test Plan Library page, and add a link below.
Daytime tests
AO bench setup and checkout (1 hrs) - J. Roberts
Tune image on PHARO
Test iterative reconstructor with AO stimulus - L. Lessard
Nighttime tests
PHARO vignetting: In twilight, verify even illumination of PHARO wide field.