Difference: Eng_070823 (1 vs. 16)

Revision 162008-04-03 - AntoninBouchez

Line: 1 to 1
 
META TOPICPARENT

August 23-25, 2007 LGS observing run

Night logs and results

Line: 43 to 43
 

Procedures and test plans

Changed:
<
<
Please post your test plans on the Test Plan Library page, and add a link below.
>
>
Please post your test plans on the Test Plan Library page, and add a link below.
 
  • AO setup
    • AO system internal focus: doc, pdf
    • AO bench setup and checkout: doc, pdf

Revision 152007-09-21 - AntoninBouchez

Line: 1 to 1
 
META TOPICPARENT

August 23-25, 2007 LGS observing run

Night logs and results

Revision 142007-08-27 - AntoninBouchez

Line: 1 to 1
 
META TOPICPARENT

August 23-25, 2007 LGS observing run

Added:
>
>

Night logs and results

*8/24/07 UT*
Photometric. Completed BTO setup for 1 hr. Measured LLT imaging performance (1.9" stars with RG610 filter; 2.4" LGS projection), return vs. polarization. Laser return fluctuating around ~15kDN/s, performance poor. Laser 8.0-7.3 W. Seeing 0.6" in V. palm_lgs_log_070824.pdf

*8/25/07 UT*
Scattered thin clouds all night. System optimization until 2320, then 2 science targets observed through clouds. Completed LOWFS vignetting measurement. Laser return stable at ~18kDN/s; power 8.1-7.4 W. Seeing 0.7" in V. palm_lgs_log_070825.pdf

*8/26/07 UT*
Scattered thick clouds all night. Attempted to observe through holes in the clouds, mostly unsuccessfully (1 target observed for 30 min). Laser return stable at ~15kDN/s; power 8.5-7.8 W. Seeing 0.7-0.9" in V. palm_lgs_log_070826.pdf

ASCAM movies

8/24/07 UT 8/25/07 UT 8/26/07 UT
 

Safety documents

  • FAA approved laser projection times:
    • 20:22:00 8/23/07 - 05:18:00 8/24/07 PDT
Line: 49 to 63
 
    • AO Optimization on the laser at zenith: doc, pdf
    • Low-order loop optimization: doc, pdf
Deleted:
<
<

Night logs and results

ASCAM movies

8/24/07 UT 8/25/07 UT 8/26/07 UT
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1187628865" name="lgs070823_schedule_v1-1.xls" path="lgs070823_schedule_v1-1.xls" size="538624" user="Main.AntoninBouchez" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1187738203" name="PMR-palomar070825.txt" path="PMR-palomar070825.txt" size="17022" user="Main.AntoninBouchez" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1187633939" name="lgs070823_schedule_v1-2.pdf" path="lgs070823_schedule_v1-2.pdf" size="61409" user="Main.AntoninBouchez" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1188234891" name="palm_lgs_log_070826.pdf" path="palm_lgs_log_070826.pdf" size="31715" user="Main.AntoninBouchez" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1187628883" name="lgs070823_schedule_v1-1.pdf" path="lgs070823_schedule_v1-1.pdf" size="61490" user="Main.AntoninBouchez" version="1"
Changed:
<
<
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1188047390" name="palm_lgs_log_070825.pdf" path="palm_lgs_log_070825.pdf" size="36779" user="Main.AntoninBouchez" version="1"
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1188234902" name="palm_lgs_log_070825.pdf" path="palm_lgs_log_070825.pdf" size="36779" user="Main.AntoninBouchez" version="2"
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1187654160" name="PMR-palomar070824.txt" path="PMR-palomar070824.txt" size="15973" user="Main.AntoninBouchez" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1188047373" name="palm_lgs_log_070824.pdf" path="palm_lgs_log_070824.pdf" size="41477" user="Main.AntoninBouchez" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1187633929" name="lgs070823_schedule_v1-2.xls" path="lgs070823_schedule_v1-2.xls" size="538624" user="Main.AntoninBouchez" version="1"

Revision 132007-08-26 - AntoninBouchez

Line: 1 to 1
 
META TOPICPARENT

August 23-25, 2007 LGS observing run

Safety documents

Line: 35 to 35
 
    • AO bench setup and checkout: doc, pdf
  • BTO setup
Changed:
<
<
    • BTO checkout: doc (v2.3), pdf (v2.3)
>
>
    • BTO alignment: doc (v2.3), pdf (v2.3)
    • BTO alignment, abbreviated version (v1.0): doc, pdf
 
    • BTO shutdown (v1.1): doc, pdf
  • Observing procedures:
    • NGS Checkout (v3.1): doc, pdf

Revision 122007-08-25 - AntoninBouchez

Line: 1 to 1
 
META TOPICPARENT

August 23-25, 2007 LGS observing run

Safety documents

Line: 11 to 11
 
Changed:
<
<
    • 8/26/07 UT P/A request: Sent 16:23 8/22/07 PDT.
>
>
    • 8/26/07 UT P/A request: no closures.
 

Personnel and engineering schedules

  Thu. 8/23 Fri. 8/24 Sat. 8/25
Line: 52 to 52
 
Added:
>
>
ASCAM movies
8/24/07 UT 8/25/07 UT 8/26/07 UT
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1187628865" name="lgs070823_schedule_v1-1.xls" path="lgs070823_schedule_v1-1.xls" size="538624" user="Main.AntoninBouchez" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1187738203" name="PMR-palomar070825.txt" path="PMR-palomar070825.txt" size="17022" user="Main.AntoninBouchez" version="2"

Revision 112007-08-25 - AntoninBouchez

Line: 1 to 1
 
META TOPICPARENT

August 23-25, 2007 LGS observing run

Safety documents

Line: 49 to 49
 
    • Low-order loop optimization: doc, pdf

Night logs and results

Changed:
<
<
>
>
 

META FILEATTACHMENT attr="" autoattached="1" comment="" date="1187628865" name="lgs070823_schedule_v1-1.xls" path="lgs070823_schedule_v1-1.xls" size="538624" user="Main.AntoninBouchez" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1187738203" name="PMR-palomar070825.txt" path="PMR-palomar070825.txt" size="17022" user="Main.AntoninBouchez" version="2"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1187633939" name="lgs070823_schedule_v1-2.pdf" path="lgs070823_schedule_v1-2.pdf" size="61409" user="Main.AntoninBouchez" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1187628883" name="lgs070823_schedule_v1-1.pdf" path="lgs070823_schedule_v1-1.pdf" size="61490" user="Main.AntoninBouchez" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1188047390" name="palm_lgs_log_070825.pdf" path="palm_lgs_log_070825.pdf" size="36779" user="Main.AntoninBouchez" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1187654160" name="PMR-palomar070824.txt" path="PMR-palomar070824.txt" size="15973" user="Main.AntoninBouchez" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1188047373" name="palm_lgs_log_070824.pdf" path="palm_lgs_log_070824.pdf" size="41477" user="Main.AntoninBouchez" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1187633929" name="lgs070823_schedule_v1-2.xls" path="lgs070823_schedule_v1-2.xls" size="538624" user="Main.AntoninBouchez" version="1"

Revision 102007-08-24 - AntoninBouchez

Line: 1 to 1
 
META TOPICPARENT

August 23-25, 2007 LGS observing run

Safety documents

Line: 10 to 10
 
Changed:
<
<
>
>
 
    • 8/26/07 UT P/A request: Sent 16:23 8/22/07 PDT.

Personnel and engineering schedules

Revision 92007-08-24 - AntoninBouchez

Line: 1 to 1
 
META TOPICPARENT

August 23-25, 2007 LGS observing run

Safety documents

Line: 39 to 39
 
    • BTO shutdown (v1.1): doc, pdf
  • Observing procedures:
    • NGS Checkout (v3.1): doc, pdf
Added:
>
>
    • LGS Checkout (v1.0): doc, pdf Replaces:
 
    • Laser Acquisition (v5.1): doc, pdf
Added:
>
>
      • AO Optimization on the laser at zenith: doc, pdf
 
    • LGS target acquisition (v4.0): doc, pdf
  • Engineering experiments:
    • AO Optimization on the laser at zenith: doc, pdf

Revision 82007-08-23 - AntoninBouchez

Line: 1 to 1
 
META TOPICPARENT

August 23-25, 2007 LGS observing run

Safety documents

Line: 9 to 9
 
Changed:
<
<
>
>
 

Revision 72007-08-22 - AntoninBouchez

Line: 1 to 1
 
META TOPICPARENT

August 23-25, 2007 LGS observing run

Safety documents

Line: 11 to 11
 
Added:
>
>
    • 8/26/07 UT P/A request: Sent 16:23 8/22/07 PDT.
 

Personnel and engineering schedules

  Thu. 8/23 Fri. 8/24 Sat. 8/25

Revision 62007-08-21 - AntoninBouchez

Line: 1 to 1
 
META TOPICPARENT

August 23-25, 2007 LGS observing run

Safety documents

Line: 10 to 10
 
Changed:
<
<
>
>
 

Personnel and engineering schedules

  Thu. 8/23 Fri. 8/24 Sat. 8/25
Line: 19 to 19
 
Cromer X X X
Fogarty X X  
Guiwits X    
Changed:
<
<
Petrie ?    
>
>
Petrie X    
 
Roberts X X X
Tripathi X X X
Trinh   X  
Line: 51 to 51
 

META FILEATTACHMENT attr="" autoattached="1" comment="" date="1187628865" name="lgs070823_schedule_v1-1.xls" path="lgs070823_schedule_v1-1.xls" size="538624" user="Main.AntoninBouchez" version="1"
Changed:
<
<
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1187734521" name="PMR-palomar070825.txt" path="PMR-palomar070825.txt" size="17191" user="Main.AntoninBouchez" version="1"
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1187738203" name="PMR-palomar070825.txt" path="PMR-palomar070825.txt" size="17022" user="Main.AntoninBouchez" version="2"
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1187633939" name="lgs070823_schedule_v1-2.pdf" path="lgs070823_schedule_v1-2.pdf" size="61409" user="Main.AntoninBouchez" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1187628883" name="lgs070823_schedule_v1-1.pdf" path="lgs070823_schedule_v1-1.pdf" size="61490" user="Main.AntoninBouchez" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1187654160" name="PMR-palomar070824.txt" path="PMR-palomar070824.txt" size="15973" user="Main.AntoninBouchez" version="1"

Revision 52007-08-21 - AntoninBouchez

Line: 1 to 1
 
META TOPICPARENT

August 23-25, 2007 LGS observing run

Safety documents

Line: 10 to 10
 
Added:
>
>
 

Personnel and engineering schedules

  Thu. 8/23 Fri. 8/24 Sat. 8/25
Line: 50 to 51
 

META FILEATTACHMENT attr="" autoattached="1" comment="" date="1187628865" name="lgs070823_schedule_v1-1.xls" path="lgs070823_schedule_v1-1.xls" size="538624" user="Main.AntoninBouchez" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1187734521" name="PMR-palomar070825.txt" path="PMR-palomar070825.txt" size="17191" user="Main.AntoninBouchez" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1187633939" name="lgs070823_schedule_v1-2.pdf" path="lgs070823_schedule_v1-2.pdf" size="61409" user="Main.AntoninBouchez" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1187628883" name="lgs070823_schedule_v1-1.pdf" path="lgs070823_schedule_v1-1.pdf" size="61490" user="Main.AntoninBouchez" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1187654160" name="PMR-palomar070824.txt" path="PMR-palomar070824.txt" size="15973" user="Main.AntoninBouchez" version="1"

Revision 42007-08-21 - AntoninBouchez

Line: 1 to 1
 
META TOPICPARENT

August 23-25, 2007 LGS observing run

Safety documents

Changed:
<
<
  • FAA documents:
    • Approved laser projection times:
    • Securitas spotters contract times:
>
>
  • FAA approved laser projection times:
    • 20:22:00 8/23/07 - 05:18:00 8/24/07 PDT
    • 20:21:00 8/24/07 - 05:19:00 8/25/07 PDT
    • 20:19:00 8/25/07 - 05:20:00 8/26/07 PDT
  • Securitas spotters are schedule to be on site 19:30 - 05:30 PDT.
 
Added:
>
>
 

Personnel and engineering schedules

  Thu. 8/23 Fri. 8/24 Sat. 8/25
Line: 47 to 52
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1187628865" name="lgs070823_schedule_v1-1.xls" path="lgs070823_schedule_v1-1.xls" size="538624" user="Main.AntoninBouchez" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1187633939" name="lgs070823_schedule_v1-2.pdf" path="lgs070823_schedule_v1-2.pdf" size="61409" user="Main.AntoninBouchez" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1187628883" name="lgs070823_schedule_v1-1.pdf" path="lgs070823_schedule_v1-1.pdf" size="61490" user="Main.AntoninBouchez" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1187654160" name="PMR-palomar070824.txt" path="PMR-palomar070824.txt" size="15973" user="Main.AntoninBouchez" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1187633929" name="lgs070823_schedule_v1-2.xls" path="lgs070823_schedule_v1-2.xls" size="538624" user="Main.AntoninBouchez" version="1"

Revision 32007-08-20 - AntoninBouchez

Line: 1 to 1
 
META TOPICPARENT

August 23-25, 2007 LGS observing run

Safety documents

Line: 21 to 21
 
Trinh   X  

Engineering Schedule

Changed:
<
<
>
>
 

Procedures and test plans

Please post your test plans on the Test Plan Library page, and add a link below.
Line: 45 to 45
 

META FILEATTACHMENT attr="" autoattached="1" comment="" date="1187628865" name="lgs070823_schedule_v1-1.xls" path="lgs070823_schedule_v1-1.xls" size="538624" user="Main.AntoninBouchez" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1187633939" name="lgs070823_schedule_v1-2.pdf" path="lgs070823_schedule_v1-2.pdf" size="61409" user="Main.AntoninBouchez" version="1"
 
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1187628883" name="lgs070823_schedule_v1-1.pdf" path="lgs070823_schedule_v1-1.pdf" size="61490" user="Main.AntoninBouchez" version="1"
Added:
>
>
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1187633929" name="lgs070823_schedule_v1-2.xls" path="lgs070823_schedule_v1-2.xls" size="538624" user="Main.AntoninBouchez" version="1"

Revision 22007-08-20 - AntoninBouchez

Line: 1 to 1
 
META TOPICPARENT

August 23-25, 2007 LGS observing run

Safety documents

Line: 10 to 10
 

Personnel and engineering schedules

  Thu. 8/23 Fri. 8/24 Sat. 8/25
Changed:
<
<
Angione ?    
>
>
Angione X X ?
 
Bouchez X X X
Cromer X X X
Changed:
<
<
Guiwits ?    
>
>
Fogarty X X  
Guiwits X    
 
Petrie ?    
Roberts X X X
Tripathi X X X
Changed:
<
<
Trinh ?    
Troy      
>
>
Trinh   X  
 
Changed:
<
<
  • Engineering Schedule:
>
>
Engineering Schedule
 

Procedures and test plans

Please post your test plans on the Test Plan Library page, and add a link below.
Line: 40 to 41
 
    • Low-order loop optimization: doc, pdf

Night logs and results

Added:
>
>

META FILEATTACHMENT attr="" autoattached="1" comment="" date="1187628865" name="lgs070823_schedule_v1-1.xls" path="lgs070823_schedule_v1-1.xls" size="538624" user="Main.AntoninBouchez" version="1"
META FILEATTACHMENT attr="" autoattached="1" comment="" date="1187628883" name="lgs070823_schedule_v1-1.pdf" path="lgs070823_schedule_v1-1.pdf" size="61490" user="Main.AntoninBouchez" version="1"

Revision 12007-07-31 - AntoninBouchez

Line: 1 to 1
Added:
>
>
META TOPICPARENT

August 23-25, 2007 LGS observing run

Safety documents

Personnel and engineering schedules

  Thu. 8/23 Fri. 8/24 Sat. 8/25
Angione ?    
Bouchez X X X
Cromer X X X
Guiwits ?    
Petrie ?    
Roberts X X X
Tripathi X X X
Trinh ?    
Troy      

  • Engineering Schedule:

Procedures and test plans

Please post your test plans on the Test Plan Library page, and add a link below.
  • AO setup
    • AO system internal focus: doc, pdf
    • AO bench setup and checkout: doc, pdf
  • BTO setup
    • BTO setup (v2.3): doc, pdf
    • BTO checkout: doc (v2.3), pdf (v2.3)
    • BTO shutdown (v1.1): doc, pdf
  • Observing procedures:
    • NGS Checkout (v3.1): doc, pdf
    • Laser Acquisition (v5.1): doc, pdf
    • LGS target acquisition (v4.0): doc, pdf
  • Engineering experiments:
    • AO Optimization on the laser at zenith: doc, pdf
    • Low-order loop optimization: doc, pdf

Night logs and results

 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2021 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback