Tags:
create new tag
view all tags
Version 2 (5:15pm, 6/2/06)

Monday 6/5

0800 - AB arrives at Palomar
0800-1000 - AB: Complete BTO breadboard setup and 660nm laser alignment.
1000 - CS arrives at Palomar
1000-1300 - AB, CS: Test BTO signal levels, telescope at zenith (need Coude port unlocked by 10am).
1200 - JA arrives at Palomar
1300-1500 - AB, CS: Improve Q2 alignment and baffling (need a crane operator for 2hr anytime after lunch).
1500-1800 - AB, CS, JA: Test BTO servo loop with telescope moves (Rick will operate telescope)
eve. - AB, CS, JA: Finalize dual-beam BTO control strategy.

Tuesday 6/6

0900 - VV arrives at Palomar
0900-1000 - LGS IPT meeting.
1000-1100 - VV: Start up CSFL at low power for Coude lab BTO tests.
1000-1300 - JA: Work on BTO software.
1100-1300 - VV, AB, CS: Align CSFL to BTO, measure polarization.
1300 - AB, JA return to Pasadena
1300-eve. - VV: Install NLX pressure control hardware.
1300-eve. - CS: Finish up BTO work.

Wednesday 6/7

CS return to Pasadena.
EK arrives at Palomar.

-- AntoninBouchez - 02 Jun 2006

Topic revision: r1 - 2006-06-03 - AntoninBouchez
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback