June 14-20, 2007 LGS observing run

>
>

June 14-20, 2008 LGS observing run

 

Night logs and results

6/15/08 UT
Photometric. Completed various calibrations and testing of the LGS system. Tested primary mirror figure sensitivity to spring scales. Seeing 1.1" in V. No laser projection.

Revision 132008-08-12 - AntoninBouchez

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

June 14-20, 2007 LGS observing run

Night logs and results

Changed:
<
<
6/15/078UT
>
>
6/15/08 UT
 Photometric. Completed various calibrations and testing of the LGS system. Tested primary mirror figure sensitivity to spring scales. Seeing 1.1" in V. No laser projection.

6/16/08 UT

Revision 122008-06-21 - AntoninBouchez

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

June 14-20, 2007 LGS observing run

Night logs and results

6/15/078UT
Changed:
<
<
Photometric. Completed various calibrations and testing of the LGS system. Seeing 1.1" in V. No laser projection.
>
>
Photometric. Completed various calibrations and testing of the LGS system. Tested primary mirror figure sensitivity to spring scales. Seeing 1.1" in V. No laser projection.
  6/16/08 UT
Photometric. Calibrated PHARO, AO, and Acq. Cam platescales. Tested BTO. Seeing 8" in V. No laser projection.

Revision 112008-06-18 - AntoninBouchez

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

June 14-20, 2007 LGS observing run

Night logs and results

Added:
>
>
6/15/078UT
Photometric. Completed various calibrations and testing of the LGS system. Seeing 1.1" in V. No laser projection.

6/16/08 UT
Photometric. Calibrated PHARO, AO, and Acq. Cam platescales. Tested BTO. Seeing 8" in V. No laser projection.

6/17/08 - 6/21/08 UT
Canceled LGS science run due to laser power, stability, and wavefront problems.

 

Safety Documents

Line: 16 to 25
 
Changed:
<
<
    • 6/17/07 UT P/A request: Submitted 19:19 6/13/08 PDT.
    • 6/18/07 UT P/A request: Submitted 05:16 6/15/08 PDT.
    • 6/19/07 UT P/A request: not yet submitted.
    • 6/20/07 UT P/A request: not yet submitted.
    • 6/21/07 UT P/A request: not yet submitted.
>
>
    • 6/17/07 UT P/A request: Time windows received.
    • 6/18/07 UT P/A request: Time windows received.
    • 6/19/07 UT P/A request: Submitted 05:53 6/16/08 PDT. Request canceled 6/18/08.
    • 6/20/07 UT P/A request: not submitted.
    • 6/21/07 UT P/A request: not submitted.
 

Personnel and engineering schedules

  Thu 6/12 Fri 6/13 Sat 6/14 Sun 6/15 Mon 6/16 Tue 6/17 Wed 6/18 Thu 6/19 Fri 6/20

Revision 102008-06-15 - AntoninBouchez

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

June 14-20, 2007 LGS observing run

Night logs and results

Line: 15 to 15
 
Changed:
<
<
>
>
 
    • 6/17/07 UT P/A request: Submitted 19:19 6/13/08 PDT.
Changed:
<
<
    • 6/18/07 UT P/A request: not yet submitted.
>
>
    • 6/18/07 UT P/A request: Submitted 05:16 6/15/08 PDT.
 
    • 6/19/07 UT P/A request: not yet submitted.
    • 6/20/07 UT P/A request: not yet submitted.
    • 6/21/07 UT P/A request: not yet submitted.

Revision 92008-06-14 - AntoninBouchez

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

June 14-20, 2007 LGS observing run

Night logs and results

Safety Documents

Changed:
<
<
    • 6/14: not yet approved.
>
>
    • 21:04:00 6/14/08 - 04:33:00 6/15/08 PDT
 
    • 21:04:00 6/15/08 - 04:33:00 6/16/08 PDT
    • 21:04:00 6/16/08 - 04:33:00 6/17/08 PDT
    • 21:04:00 6/17/08 - 04:33:00 6/18/08 PDT
Line: 14 to 14
 
Changed:
<
<
>
>
 
Changed:
<
<
>
>
    • 6/17/07 UT P/A request: Submitted 19:19 6/13/08 PDT.
    • 6/18/07 UT P/A request: not yet submitted.
    • 6/19/07 UT P/A request: not yet submitted.
    • 6/20/07 UT P/A request: not yet submitted.
    • 6/21/07 UT P/A request: not yet submitted.
 

Personnel and engineering schedules

  Thu 6/12 Fri 6/13 Sat 6/14 Sun 6/15 Mon 6/16 Tue 6/17 Wed 6/18 Thu 6/19 Fri 6/20

Revision 82008-06-13 - AntoninBouchez

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

June 14-20, 2007 LGS observing run

Night logs and results

Changed:
<
<

Safety documents

>
>

Safety Documents

 
Line: 23 to 23
 

Personnel and engineering schedules

Deleted:
<
<
Personnel
 
  Thu 6/12 Fri 6/13 Sat 6/14 Sun 6/15 Mon 6/16 Tue 6/17 Wed 6/18 Thu 6/19 Fri 6/20
Angione   X   X          
Bouchez   X X X X X X X X
Line: 33 to 32
 
Velur X X X X          
Kajsa     X X X X X X X
Deleted:
<
<
Schedules
 

Procedures and test plans

Revision 72008-06-12 - AntoninBouchez

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

June 14-20, 2007 LGS observing run

Night logs and results

Line: 15 to 15
 
Changed:
<
<
>
>
 
Line: 24 to 24
 

Personnel and engineering schedules

Personnel
Changed:
<
<
Engineering Thu 6/12 Fri 6/13 Sat 6/14 Sun 6/15
Angione   arrive noon X  
Bouchez   arrive 2pm X X
Cromer     X X
Dekany   arrive evening? X X
Roberts X X X X
Velur X X X X
Kajsa     X X

Science Mon 6/16 Tue 6/17 Wed 6/18 Thu 6/19 Fri 6/20
Bouchez X X X X X
Cromer     X X X
Dekany          
Velur          
Kajsa X X X X X
>
>
  Thu 6/12 Fri 6/13 Sat 6/14 Sun 6/15 Mon 6/16 Tue 6/17 Wed 6/18 Thu 6/19 Fri 6/20
Angione   X   X          
Bouchez   X X X X X X X X
Cromer     X X     ? ? ?
Dekany     X X          
Roberts X X X X          
Velur X X X X          
Kajsa     X X X X X X X
 
Schedules
Line: 69 to 62
 
META FILEATTACHMENT attachment="LCH_updated_contact_information.pdf" attr="" comment="" date="1213161945" name="LCH_updated_contact_information.pdf" path="LCH_updated_contact_information.pdf" size="49672" stream="LCH_updated_contact_information.pdf" user="Main.AntoninBouchez" version="1"
META FILEATTACHMENT attachment="PMR-palomar080615.txt" attr="" comment="" date="1213291905" name="PMR-palomar080615.txt" path="PMR-palomar080615.txt" size="15499" stream="PMR-palomar080615.txt" user="Main.AntoninBouchez" version="1"
META FILEATTACHMENT attachment="run_schedule_080612.txt" attr="" comment="" date="1213294187" name="run_schedule_080612.txt" path="run_schedule_080612.txt" size="2520" stream="run_schedule_080612.txt" user="Main.AntoninBouchez" version="1"
Added:
>
>
META FILEATTACHMENT attachment="PMR-palomar080616.txt" attr="" comment="" date="1213307556" name="PMR-palomar080616.txt" path="PMR-palomar080616.txt" size="15499" stream="PMR-palomar080616.txt" user="Main.AntoninBouchez" version="1"

Revision 62008-06-12 - AntoninBouchez

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

June 14-20, 2007 LGS observing run

Night logs and results

Line: 14 to 14
 
Changed:
<
<
>
>
 
Line: 40 to 40
 
Velur          
Kajsa X X X X X
Changed:
<
<
Subsystems
Laser: Velur supporting laser engineering Thu.-Sun. Dekany to assist Fri. eve - Sun.
BTO: Angione and Bouchez to test BTO with stimulus laser Friday 4-8pm.
LLT: Bouchez to deliver to Palomar Friday, ~2pm. Currently planned to install Sat. morning.
AO: Burruss and Roberts working on stimulus in AO Lab Wed.-Fri. Palomar to install on telescope Sat. morning.
>
>
Schedules
 

Procedures and test plans

Please post your test plans on the Test Plan Library page, and add a link below.
Line: 68 to 67
 
META FILEATTACHMENT attachment="LOD_Palomar_Observatory_051308.pdf" attr="" comment="" date="1213136618" name="LOD_Palomar_Observatory_051308.pdf" path="LOD_Palomar_Observatory_051308.pdf" size="457327" stream="LOD_Palomar_Observatory_051308.pdf" user="Main.AntoninBouchez" version="1"
META FILEATTACHMENT attachment="LCH_Reports_Handbook_Change_1_8-22-06.pdf" attr="" comment="" date="1213161931" name="LCH_Reports_Handbook_Change_1_8-22-06.pdf" path="LCH_Reports_Handbook_Change_1_8-22-06.pdf" size="307610" stream="LCH_Reports_Handbook_Change_1_8-22-06.pdf" user="Main.AntoninBouchez" version="1"
META FILEATTACHMENT attachment="LCH_updated_contact_information.pdf" attr="" comment="" date="1213161945" name="LCH_updated_contact_information.pdf" path="LCH_updated_contact_information.pdf" size="49672" stream="LCH_updated_contact_information.pdf" user="Main.AntoninBouchez" version="1"
Added:
>
>
META FILEATTACHMENT attachment="PMR-palomar080615.txt" attr="" comment="" date="1213291905" name="PMR-palomar080615.txt" path="PMR-palomar080615.txt" size="15499" stream="PMR-palomar080615.txt" user="Main.AntoninBouchez" version="1"
META FILEATTACHMENT attachment="run_schedule_080612.txt" attr="" comment="" date="1213294187" name="run_schedule_080612.txt" path="run_schedule_080612.txt" size="2520" stream="run_schedule_080612.txt" user="Main.AntoninBouchez" version="1"

Revision 52008-06-11 - AntoninBouchez

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

June 14-20, 2007 LGS observing run

Night logs and results

Line: 23 to 23
 

Personnel and engineering schedules

Added:
>
>
Personnel
 
Engineering Thu 6/12 Fri 6/13 Sat 6/14 Sun 6/15
Angione   arrive noon X  
Bouchez   arrive 2pm X X
Line: 30 to 31
 
Dekany   arrive evening? X X
Roberts X X X X
Velur X X X X
Added:
>
>
Kajsa     X X
 
Science Mon 6/16 Tue 6/17 Wed 6/18 Thu 6/19 Fri 6/20
Bouchez X X X X X
Cromer     X X X
Dekany          
Velur          
Added:
>
>
Kajsa X X X X X
 
Added:
>
>
Subsystems
 Laser: Velur supporting laser engineering Thu.-Sun. Dekany to assist Fri. eve - Sun.
BTO: Angione and Bouchez to test BTO with stimulus laser Friday 4-8pm.
LLT: Bouchez to deliver to Palomar Friday, ~2pm. Currently planned to install Sat. morning.

Revision 42008-06-11 - AntoninBouchez

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

June 14-20, 2007 LGS observing run

Night logs and results

Safety documents

Changed:
<
<
>
>
 
    • 6/14: not yet approved.
    • 21:04:00 6/15/08 - 04:33:00 6/16/08 PDT
    • 21:04:00 6/16/08 - 04:33:00 6/17/08 PDT
Line: 13 to 13
 
    • 21:05:00 6/20/08 - 04:33:00 6/21/08 PDT
  • Securitas spotters are schedule to be on site 20:00 - 4:45 PDT on 6/14, 20:30 - 04:45 PDT subsequent nights.
  • US-STRATCOM documents:
Changed:
<
<
>
>
 
Line: 61 to 61
 
    • Low-order loop optimization: doc, pdf
Deleted:
<
<
 
META FILEATTACHMENT attachment="LOD_Palomar_Observatory_051308.pdf" attr="" comment="" date="1213136618" name="LOD_Palomar_Observatory_051308.pdf" path="LOD_Palomar_Observatory_051308.pdf" size="457327" stream="LOD_Palomar_Observatory_051308.pdf" user="Main.AntoninBouchez" version="1"
Added:
>
>
META FILEATTACHMENT attachment="LCH_Reports_Handbook_Change_1_8-22-06.pdf" attr="" comment="" date="1213161931" name="LCH_Reports_Handbook_Change_1_8-22-06.pdf" path="LCH_Reports_Handbook_Change_1_8-22-06.pdf" size="307610" stream="LCH_Reports_Handbook_Change_1_8-22-06.pdf" user="Main.AntoninBouchez" version="1"
META FILEATTACHMENT attachment="LCH_updated_contact_information.pdf" attr="" comment="" date="1213161945" name="LCH_updated_contact_information.pdf" path="LCH_updated_contact_information.pdf" size="49672" stream="LCH_updated_contact_information.pdf" user="Main.AntoninBouchez" version="1"

Revision 32008-06-10 - AntoninBouchez

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

June 14-20, 2007 LGS observing run

Night logs and results

Safety documents

Changed:
<
<
  • FAA approved laser projection times:
    • 6/14: not yet approved
>
>
 
    • 21:04:00 6/15/08 - 04:33:00 6/16/08 PDT
    • 21:04:00 6/16/08 - 04:33:00 6/17/08 PDT
    • 21:04:00 6/17/08 - 04:33:00 6/18/08 PDT
Line: 62 to 62
 
Changed:
<
<

-- AntoninBouchez - 10 Jun 2008

>
>
META FILEATTACHMENT attachment="LOD_Palomar_Observatory_051308.pdf" attr="" comment="" date="1213136618" name="LOD_Palomar_Observatory_051308.pdf" path="LOD_Palomar_Observatory_051308.pdf" size="457327" stream="LOD_Palomar_Observatory_051308.pdf" user="Main.AntoninBouchez" version="1"

Revision 22008-06-10 - AntoninBouchez

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

June 14-20, 2007 LGS observing run

Night logs and results

Line: 27 to 27
 
Angione   arrive noon X  
Bouchez   arrive 2pm X X
Cromer     X X
Changed:
<
<
Dekany     X X
>
>
Dekany   arrive evening? X X
 
Roberts X X X X
Velur X X X X
Line: 37 to 37
 
Dekany          
Velur          
Added:
>
>
Laser: Velur supporting laser engineering Thu.-Sun. Dekany to assist Fri. eve - Sun.
BTO: Angione and Bouchez to test BTO with stimulus laser Friday 4-8pm.
LLT: Bouchez to deliver to Palomar Friday, ~2pm. Currently planned to install Sat. morning.
AO: Burruss and Roberts working on stimulus in AO Lab Wed.-Fri. Palomar to install on telescope Sat. morning.
 

Procedures and test plans

Please post your test plans on the Test Plan Library page, and add a link below.
  • AO setup

Revision 12008-06-10 - AntoninBouchez

Line: 1 to 1
Added:
>
>
META TOPICPARENT name="WebHome"

June 14-20, 2007 LGS observing run

Night logs and results

Safety documents

Personnel and engineering schedules

Engineering Thu 6/12 Fri 6/13 Sat 6/14 Sun 6/15
Angione   arrive noon X  
Bouchez   arrive 2pm X X
Cromer     X X
Dekany     X X
Roberts X X X X
Velur X X X X

Science Mon 6/16 Tue 6/17 Wed 6/18 Thu 6/19 Fri 6/20
Bouchez X X X X X
Cromer     X X X
Dekany          
Velur          

Procedures and test plans

Please post your test plans on the Test Plan Library page, and add a link below.
  • AO setup
    • AO system internal focus: doc, pdf
    • AO bench setup and checkout: doc, pdf
  • BTO setup
    • BTO setup (v2.4): doc, pdf
    • BTO alignment (v2.4): doc, pdf
    • BTO alignment, abbreviated version (v1.0): doc, pdf
    • BTO shutdown (v1.1): doc, pdf
  • Observing procedures:
    • NGS Checkout (v3.1): doc, pdf
    • LGS Checkout (v1.0): doc, pdf
    • LGS target acquisition (v4.0): doc, pdf
  • Engineering experiments:
    • AO Optimization on the laser at zenith: doc, pdf
    • Low-order loop optimization: doc, pdf

-- AntoninBouchez - 10 Jun 2008

 