Topic attachments
I |
Attachment |
History |
Action |
Size |
Date |
Who |
Comment |
doc |
PDR_relay_design_v3.doc |
r1 |
manage |
2603.0 K |
2009-07-14 - 21:22 |
UnknownUser |
14 July, 2009 version of design document. Includes preliminary tolerance analysis |
pdf |
1410-CM0010_Primary_Mirror_Proj.pdf |
r1 |
manage |
198.7 K |
2009-11-20 - 23:48 |
UnknownUser |
1410-CM0010 Primary Mirror Projected on DMs |
doc |
NGAO_optomechanical_meeting_Aug25,09.doc |
r1 |
manage |
71.0 K |
2009-08-26 - 22:26 |
UnknownUser |
August 25, 2009 |
ZMX |
KNGAO_1-tier_100mm_120arcsec_straightthru_2nd-relay_wtelescope_v3.ZMX |
r1 |
manage |
55.9 K |
2009-03-19 - 18:58 |
UnknownUser |
Cascaded-relay design, 1-tier, 100mm DM, 2nd relay passes 40" |
ZMX |
KNGAO_1-tier_100mm_120arcsec_straightthru_2nd-relay_wtelescope_v2.ZMX |
r2 r1 |
manage |
59.3 K |
2009-03-04 - 21:44 |
UnknownUser |
Cascaded-relay design, 1-tier, 100mm DM, avoiding dichroic changer, version 2 |
ZMX |
KNGAO_1-tier_100mm_straightthru_2nd-relay_wtelescope.ZMX |
r1 |
manage |
48.2 K |
2009-02-23 - 17:19 |
UnknownUser |
Cascaded-relay design, 1-tier, 100mm DM, avoiding dichroic changer. |
ZMX |
KNGAO_cascade_140mmDM_straightthru_25mmMEM.ZMX |
r1 |
manage |
48.8 K |
2009-01-29 - 21:26 |
UnknownUser |
Cascaded-relay design, 1-tier, 140mm DM, avoiding dichroic changer. |
ZMX |
KNGAO_2-tier_straightthru_2nd-relay_v4_wtelescope.ZMX |
r3 r2 r1 |
manage |
69.5 K |
2009-01-29 - 21:47 |
UnknownUser |
Cascaded-relay design, 2-tier, 100mm DM, avoiding dichroic changer. |
ZMX |
NGAO-1-tier-champion-dec2007.ZMX |
r1 |
manage |
51.1 K |
2009-01-08 - 17:51 |
UnknownUser |
Cascaded-relay, 1-tier, 140mm DM carried over from conceptual design phase |
ZMX |
KNGAO_2-tier_folded-2nd-relay_v4_wtelescope.ZMX |
r1 |
manage |
112.4 K |
2009-01-08 - 17:43 |
UnknownUser |
Cascaded-relay, 2-tier design carried over from conceptual design phase |
jpg |
NGAO_OptoMech_SwithyardPickoffOption_Jan7,09.jpg |
r1 |
manage |
265.4 K |
2009-02-18 - 00:24 |
UnknownUser |
drawing of switchyard concept, with dimensions, on the white board Jan 7, 2009 |
doc |
Keck_NGAO_OptoMechanical_Meeting_Jun_2_2009.doc |
r1 |
manage |
59.5 K |
2009-06-02 - 20:55 |
UnknownUser |
June 2, 2009 |
xls |
ThroughputEmissivity_v8_(version_1).xls |
r1 |
manage |
5272.0 K |
2009-06-12 - 14:47 |
UnknownUser |
June, 2009 update of throughput and emissivity calculator |
png |
Slide1.png |
r1 |
manage |
131.3 K |
2009-06-02 - 18:05 |
UnknownUser |
KNGAO relay design, as of June 1, 2009. |
ZMX |
KNGAO_1-tier_100mm_120arcsec_straightthru_2nd-relay_wtelescope_v7.ZMX |
r2 r1 |
manage |
114.1 K |
2009-08-25 - 17:33 |
UnknownUser |
Latest iteration of KNGAO relay design, 4 Aug, 2009 |
pdf |
interferometer_options.pdf |
r1 |
manage |
1449.7 K |
2009-09-01 - 17:31 |
UnknownUser |
Looking at options for feeding the interferometer. |
doc |
MeetingNotes_May5,2009.doc |
r1 |
manage |
79.5 K |
2009-05-07 - 16:44 |
UnknownUser |
May 5, 2009 |
EASM |
7013-01_Keck_TELESCOPE_ASSEMBLY,_K2_NGAO.EASM |
r1 |
manage |
15635.9 K |
2009-10-26 - 16:39 |
UnknownUser |
|
png |
AOandNasmythDrawing_v5relay.png |
r1 |
manage |
441.0 K |
2009-06-18 - 23:17 |
UnknownUser |
|
png |
AOrelayV5a.png |
r1 |
manage |
542.2 K |
2009-07-01 - 01:21 |
UnknownUser |
|
png |
DualStarModule.png |
r1 |
manage |
92.9 K |
2009-07-14 - 17:01 |
UnknownUser |
|
ZMX |
KNGAO_1-tier_100mm_120arcsec_straightthru_2nd-relay_wtelescope_v4.ZMX |
r1 |
manage |
92.9 K |
2009-03-30 - 19:34 |
UnknownUser |
|
SES |
KNGAO_1-tier_100mm_120arcsec_straightthru_2nd-relay_wtelescope_v6.SES |
r1 |
manage |
65.6 K |
2009-07-14 - 17:02 |
UnknownUser |
|
ZMX |
KNGAO_1-tier_100mm_120arcsec_straightthru_2nd-relay_wtelescope_v6.ZMX |
r1 |
manage |
122.1 K |
2009-07-14 - 17:31 |
UnknownUser |
|
ZMX |
KNGAO_100mmpupil_120arcsecRelay_v9.ZMX |
r1 |
manage |
132.1 K |
2010-01-12 - 18:09 |
UnknownUser |
|
png |
KNGAO_Layout6.png |
r1 |
manage |
21.7 K |
2009-07-14 - 17:48 |
UnknownUser |
|
ppt |
KNGAO_OptoMechanicalLayout.ppt |
r1 |
manage |
817.0 K |
2009-02-07 - 00:17 |
UnknownUser |
|
JPG |
KNGAO_relay_version_9.JPG |
r1 |
manage |
258.8 K |
2010-01-12 - 18:13 |
UnknownUser |
|
doc |
KeckNGAO_OptoMech_June18,09.doc |
r1 |
manage |
83.0 K |
2009-06-18 - 22:07 |
UnknownUser |
|
doc |
Keck_NGAO_Opto-Mech_meeting_June_23_2009.doc |
r1 |
manage |
89.0 K |
2009-06-25 - 23:53 |
UnknownUser |
|
doc |
Keck_NGAO_Opto-Mech_meeting_June_9,_2009.doc |
r1 |
manage |
79.5 K |
2009-06-09 - 22:52 |
UnknownUser |
|
doc |
Keck_NGAO_optomechanical_June_30_2009.doc |
r1 |
manage |
91.5 K |
2009-07-01 - 01:04 |
UnknownUser |
|
pdf |
LOWFS_Legs_KNGAO_V7.pdf |
r1 |
manage |
481.0 K |
2009-08-26 - 22:21 |
UnknownUser |
|
doc |
NGAO_Opto-Mechanical_Meeting_Minutes_01_12_10.doc |
r1 |
manage |
26.5 K |
2010-01-19 - 17:50 |
UnknownUser |
|
doc |
NGAO_OptomechanicalInterfaceMinutes_Jan19,2010_rev1.doc |
r1 |
manage |
80.5 K |
2010-01-19 - 20:15 |
UnknownUser |
|
doc |
NGAO_Optomechanical_Interface_Meeting_January_19_2010.doc |
r1 |
manage |
80.5 K |
2010-01-19 - 20:13 |
UnknownUser |
|
doc |
NGAO_Optomechanical_Interface_Meeting_January_19_2010_rev2.doc |
r1 |
manage |
82.5 K |
2010-01-19 - 20:21 |
UnknownUser |
|
doc |
NGAO_optomechanical_Aug11,2009.doc |
r1 |
manage |
36.0 K |
2009-08-18 - 21:15 |
UnknownUser |
|
doc |
NGAO_optomechanical_July17.doc |
r1 |
manage |
75.0 K |
2009-07-17 - 00:19 |
UnknownUser |
|
doc |
NGAO_optomechanical_July21,2009.doc |
r1 |
manage |
74.5 K |
2009-07-23 - 16:00 |
UnknownUser |
|
doc |
NGAO_optomechanical_meeting_Oct_20_2009.doc |
r1 |
manage |
72.0 K |
2009-10-20 - 22:12 |
UnknownUser |
|
doc |
NGAO_optomechanical_meeting_Oct_6_2009.doc |
r1 |
manage |
53.0 K |
2009-10-08 - 21:16 |
UnknownUser |
|
doc |
NGAO_optomechanical_meeting_Sept22_2009.doc |
r1 |
manage |
81.5 K |
2009-09-29 - 17:38 |
UnknownUser |
|
doc |
NGAO_optomechanical_meeting_Sept29,2009.doc |
r1 |
manage |
72.0 K |
2009-09-30 - 00:57 |
UnknownUser |
|
doc |
NGAO_optomechanical_meeting_Sept_15_2009.doc |
r2 r1 |
manage |
27.5 K |
2009-09-29 - 17:35 |
UnknownUser |
|
doc |
NGAO_optomechanical_meeting_Sept_1_2009.doc |
r1 |
manage |
32.0 K |
2009-09-08 - 19:09 |
UnknownUser |
|
doc |
NGAO_optomechanical_meeting_Sept_8_2009.doc |
r1 |
manage |
36.5 K |
2009-09-08 - 20:45 |
UnknownUser |
|
doc |
NGAO_optomechanical_meeting_notes_Aug18,09.doc |
r1 |
manage |
45.0 K |
2009-08-18 - 21:15 |
UnknownUser |
|
doc |
NGAOoptomechanical_July29,09.doc |
r1 |
manage |
2634.0 K |
2009-07-30 - 23:28 |
UnknownUser |
|
doc |
PDR_relay_design.doc |
r1 |
manage |
2571.5 K |
2009-06-12 - 19:14 |
UnknownUser |
|
rtf |
Re__Opto-Mech_meeting_takeways.rtf |
r1 |
manage |
5.9 K |
2009-04-23 - 22:56 |
UnknownUser |
|
xls |
ThroughputEmissivity_v6.xls |
r1 |
manage |
5368.5 K |
2009-05-06 - 19:59 |
UnknownUser |
|
JPG |
kngao_relay_v7.JPG |
r1 |
manage |
93.8 K |
2009-08-04 - 20:32 |
UnknownUser |
|
pdf |
placemat.pdf |
r1 |
manage |
319.0 K |
2009-07-14 - 17:01 |
UnknownUser |
|
EASM |
TELESCOPE_ASSEMBLY_w-bench_100mm_1-tier_V5.EASM |
r1 |
manage |
2113.9 K |
2009-06-09 - 16:27 |
UnknownUser |
OptoMechancanical drawing of AO relays on Nasmyth platform - 6/9/09 |
png |
TELESCOPE_ASSEMBLY_w-bench_100mm_1-tier_V5.png |
r1 |
manage |
360.9 K |
2009-06-09 - 16:29 |
UnknownUser |
OptoMechancanical drawing of AO relays on Nasmyth platform - 6/9/09 |
doc |
NGAO_optomechanical_meeting_notes_090806.doc |
r2 r1 |
manage |
28.5 K |
2009-08-06 - 20:34 |
UnknownUser |
optomechanical meeting minutes, 08/05/09 |
pdf |
OSMs_in_NGAO_F.P..pdf |
r1 |
manage |
457.9 K |
2009-07-16 - 18:20 |
UnknownUser |
OSMs in the focal plane of the first relay. |
ppt |
KNGAO_cascade_straightthru_1tier_100mm.ppt |
r1 |
manage |
147.5 K |
2009-02-23 - 17:22 |
UnknownUser |
Powerpoint slide of 1-tier, 100mm DM cascaded relay of 120" field with no dichroic changer. |
ppt |
KNGAO_cascade_straightthru_1tier_100mm_v2.ppt |
r1 |
manage |
124.0 K |
2009-03-17 - 18:40 |
UnknownUser |
Powerpoint slide of 1-tier, 100mm DM cascaded relay of 120" field with no dichroic changer. |
ppt |
KNGAO_cascade_straightthru_1tier_100mm_v4.ppt |
r1 |
manage |
252.0 K |
2009-03-30 - 19:36 |
UnknownUser |
Powerpoint slide of 1-tier, 100mm DM cascaded relay of 120" field with no dichroic changer. |
ppt |
KNGAO_cascade_straightthru_1tier_100mm_v2.2.ppt |
r1 |
manage |
124.0 K |
2009-03-17 - 18:44 |
UnknownUser |
Powerpoint slide of 1-tier, 100mm DM cascaded relay of 120" FOV, no dichroic changer, proper orientation. |
ppt |
KNGAO_cascade_straightthru.ppt |
r1 |
manage |
156.0 K |
2009-01-08 - 21:10 |
UnknownUser |
Powerpoint slide of 100mm DM cascaded relay with no dichroic changer. |
ppt |
KNGAO_cascade_straightthru_1tier.ppt |
r1 |
manage |
121.5 K |
2009-01-29 - 21:28 |
UnknownUser |
Powerpoint slide of 140mm DM cascaded relay with no dichroic changer. |
ppt |
KNGAO_annotated_layout.ppt |
r1 |
manage |
138.0 K |
2009-01-08 - 21:01 |
UnknownUser |
Powerpoint slide showing layout of 2-tier cascaded relay from conceptual design phase. |
ppt |
KNGAO_168mmDM.ppt |
r1 |
manage |
212.0 K |
2009-01-08 - 21:12 |
UnknownUser |
Powerpoint slide with layout of single relay with 168mm 48x48 piezo DM. |
ppt |
KNGAO_200mmDM.ppt |
r1 |
manage |
121.5 K |
2009-01-08 - 21:08 |
UnknownUser |
Powerpoint slide with layout of single relay with 200mm, 48x48, piezo DM. |
ppt |
KNGAO_25mmMEMs.ppt |
r1 |
manage |
170.0 K |
2009-01-08 - 21:07 |
UnknownUser |
Powerpoint slide with layout of single relay with 25mm MEMs. |
ppt |
ThroughputEmissivityStudy.ppt |
r1 |
manage |
591.0 K |
2009-05-06 - 21:42 |
UnknownUser |
Report on cooled vs uncooled option trade study |
ZMX |
KNGAO_168mmDM_wTT.ZMX |
r1 |
manage |
36.1 K |
2009-01-08 - 17:40 |
UnknownUser |
Single relay design, 168mm DM (48 actuators, 3.5mm pitch), separate tip/tilt |
ZMX |
KNGAO_200mmDM.ZMX |
r1 |
manage |
29.0 K |
2009-01-08 - 17:38 |
UnknownUser |
Single relay design, 200mm DM (48 actuator, 5mm pitch) |
ZMX |
KNGAO_splitrelay_25mmDM_asphereLGSfeed_wtelescope_v4.ZMX |
r1 |
manage |
55.2 K |
2009-01-08 - 17:37 |
UnknownUser |
Single relay design, 25mm MEMs DM |
png |
1-tier-champion-dec2007.png |
r1 |
manage |
141.8 K |
2009-01-08 - 21:34 |
UnknownUser |
Slide showing 1-tier, 140mm DM cascaded relay design carried over from conceptual design phase. |
EASM |
kngao_model_w_telescope.EASM |
r1 |
manage |
934.3 K |
2009-02-13 - 01:48 |
UnknownUser |
SolidWorks e-drawing of 2-tier layout and pickoff switchyard. (delete the enclosure to see the optics) |
xls |
ThroughputEmissivity_v7.xls |
r1 |
manage |
5287.0 K |
2009-05-06 - 21:38 |
UnknownUser |
Version that includes LGS WFS and LOWFS paths |
ZMX |
KNGAO_1-tier_100mm_120arcsec_straightthru_2nd-relay_wtelescope_v5.ZMX |
r1 |
manage |
85.4 K |
2009-05-11 - 17:55 |
UnknownUser |
Zemax file containing May 11, 2009 version of KNGAO relay. |