Tags:
create new tag
view all tags

Backlinks to OptoMechanicalPDRPhase in Keck/NGAO Web (Search all webs)

Results from Keck/NGAO web retrieved at 18:24 (GMT)

Keck NGAO PD Phase LGS WFS Mini Review 10:00a 02:00p PDT 08:00a 12:00p HST Monday, December 7, 2009 Tele/Videoconference Dial in Number: 877 280 4645 Passcode...
Working files for 102018 interface meeting Slightly tweeked version of Reni`s layout v9 ZMX Output science fold mirror tilt opened by 5 degrees (from...
Keck NGAO PD Phase NGS WFS Mini Review 11:00a 03:00p PDT 08:00a 12:00p HST April 1st, 2010 Tele/Videoconference Dial in Number:626 395 8884 Videoconference...
Opto Mechanical Design LOWFS and HOWFS Design Real Time Control Design Supervisory Control Design Acquisition System Design Alignment, Calibration...
AO System Design Effort (WBS 3.2 3.3), System Design Phase PDR Phase Opto Mechanical Design page Opto Mechanical Mini Design Review, Nov 2009 Management...
NGAO Opto Mechanics Mini Design Review, November 17, 2009 NOTE CHANGE The review date has been changed to November 17 to allow more time for the reviewers to read...
1 Project Scope: Enabling front page astronomical science by designing, building, and deploying the world`s most advanced astronomical adaptive optics instrumentation...
Number of topics: 7

 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback