Palomar LGS Test Plan Library
Please list your test plans by observing run, and add a link from the observing run page.
Test plan template:
doc,
pdf
General AO setup
- AO system internal focus: doc, pdf
- AO bench setup and checkout: doc, pdf
NGS performance and calibration
- AO / Pharo flexure test: doc, pdf
- AO / Pharo throughput and zero point test: doc, pdf
- PHARO pupil alignment and testing: doc, pdf
- PHARO, ACAM, and LOWFS platescales: doc, pdf
- SSM motion and pupil registration: doc, pdf
- NGS Performance: doc, pdf
BTO setup and shutdown
- BTO Setup (v2.6) doc, pdf
- BTO alignment (v2.4): doc, pdf
- BTO alignment, abbreviated version (v1.0): doc, pdf
- BTO Shutdown (v1.1): doc, pdf
Laser procedures
- Laser startup (v2.1): doc, pdf
- Laser shutdown (v1.0): doc, pdf
LGS operations
- LGS science night checklist (v1.1): doc, pdf
- NGS Checkout (v3.1): doc, pdf
- LGS Checkout (v1.0): doc, pdf Replaces:
- Laser Acquisition (v5.1): doc, pdf
- AO Optimization on the laser at zenith: doc, pdf
- LGS target acquisition (v4.0): doc, pdf
- LGS SWIFT target acquisition (v1.0): doc, pdf
LGS Engineering Tests