Tags:
create new tag
view all tags

Backlinks to PeterWizinowich in all Webs (Search Main Web only)

Results from Main web retrieved at 05:35 (GMT)

KeckNgaoGroup Set GROUP NgaoGroup, SeanAdkins, JimBell, DavidKoo, RenateKupke, RichardDekany, DonaldGavel, ClaireMax, JasonChin, MichaelLiu, TommasoTreu, ChrisNeyman...
NgaoGroup Set GROUP SeanAdkins, RenateKupke, RichardDekany, DonaldGavel, DavidHale, EdWetherell, ClaireMax, JasonChin, JimmyJohnson, MichaelLiu, TommasoTreu...
NgaoMsipGroup Set GROUP PeterWizinowich, HiltonLewis, SeanAdkins, AndreaGhez, ClaireMax, MichaelLiu, DimitriMawet, TommasoTreu, RichardDekany, DonaldGavel...
NgaoSysEGroup Set GROUP OirAdmin, RichardDekany, PeterWizinowich, ChrisNeyman, DonaldGavel Set ALLOWTOPICCHANGE NgaoSysEGroup, OirAdmin Related topics...
List of TWiki users Below is a list of users with accounts. If you want to edit topics or see protected areas of the site then you can get added to the list by...
TrickGroup Set GROUP SeanAdkins, RandyCampbell, LizChock, RichardDekany, PeterWizinowich, KevinTsubota, ThomasStalcup, RogerSmith, MarkMorris, TommasoTreu...
Statistics for Main Web Month: Topic views: Topic saves: File uploads: Most popular topic views: Top contributors for topic save and...
Number of topics: 7

Results from Keck/NGAO web retrieved at 05:35 (GMT)

SSC Meeting on June 21, 2006 (Waimea, HI) Call in number 1 877 280 4645; Passcode (room number) 109022 NGAO Agenda Next Generation Adaptive Optics (All times are...
NGAO Team Meeting #1 Directions: http://www.physics.uci.edu/~barth/ksm2006/NGAOdirections.html Status of Action Items from Meeting #1 as of 9/20/06: Items Goals:...
Keck NGAO Team Meeting #2 8:30a 5:30p Tuesday, November 14, 2006 012 Robinson Laboratory, Caltech (moved to 023) Telecon attendees: 877 280 4645 passcode...
Keck NGAO Team Meeting #3 9:50a 2:30p PST Wednesday, December 13, 2006 Tele/Videoconference Dial in Number: 977 280 4645 Passcode: 540030 Videoconference...
Keck NGAO Team Meeting #4 8:00a 5:30p (Hawaii Standard Time) Monday, January 22, 2007 Hualalai Conference Room, WMKO Headquarters, Waimea, HI Telecon attendees...
Keck NGAO Team Meeting #5 9:50a 4:00p PST Wednesday, March 7, 2007 Tele/Videoconference Dial in Number: 877 280 4645 Passcode: 540030 Videoconference IP...
Keck NGAO Team Meeting #6 9:00 a 6:00 p (Pacific Daylight Time) Wed, April 25 and Thurs, April 26, 2007 Center for Adaptive Optics, UC Santa Cruz Telecon attendees...
WBS 3.1.3 Kickoff Meeting Meeting Materials NGAO Architecture Taxonomy.pdf: A shorthand nomenclature for discussion of potential NGAO architectures R. Dekany...
Keck NGAO Team Meeting #8 9:00 a 6:00 p (Pacific Daylight Time) Mon, July 9 to Fri, July 13, 2007 Center for Adaptive Optics, UC Santa Cruz Telecon attendees...
Keck NGAO Team Meeting #9 10:00a 3:30p PDT Friday, August 24, 2007 Tele/Videoconference Dial in Number: 877 280 4645 Passcode: 540030 Videoconference IP...
Keck NGAO Team Meeting #11 9:00a 6:00p PST (note change from PDT to PST on Nov. 4) 7:00a 4:00p HST Monday, November 5, 2007 Tele/Videoconference Dial in...
Keck NGAO Team Meeting #12 10:00a 5:30p PST 8:00a 3:30p HST Thursday, December 13, 2007 Tele/Videoconference Dial in Number: 877 280 4645 Passcode:...
Keck NGAO Team Meeting #13 10:00a 4:15p PST 8:00a 2:15p HST Friday, January 25, 2008 Tele/Videoconference Dial in Number: 877 280 4645 Passcode: 540030...
Keck NGAO PD Team Meeting #1 12:00p 3:00p PST 9:00a 12:00p HST Friday, June 13, 2008 Tele/Videoconference Dial in Number: 877 280 4645 Passcode: 540030 Videoconference...
Keck NGAO PD Team Meeting #3 9:00a 6:00p PST on Sept. 11; 9:00a 5:00p on Sept. 12. 6:00a 3:00p HST on Sept. 11; 6:00a 2:00p on Sept. 12. Thursday and Friday...
Keck NGAO PD Team Meeting #4 10:00a 1:45p PST 8:00a 11:45a HST Friday, December 19, 2008 Tele/Videoconference Dial in Number: 877 280 4645 Passcode:...
Keck NGAO PD Team Meeting #5 1:00p 5:00p PST 11:00a 3:00p HST Thursday, February 5, 2009 Tele/Videoconference Dial in Number: 877 280 4645 Passcode:...
Keck NGAO PD Team Meeting #6 1:00p 5:00p PDT 10:00a 2:00p HST Thursday, March 19, 2009 Tele/Videoconference Dial in Number: 877 280 4645 Passcode:...
Keck NGAO PD Team Meeting #7 11:30a 3:30p PDT 8:30a 12:30p HST Wednesday, May 27, 2009 (rescheduled from an original May 15 date) Tele/Videoconference Dial...
Alignment, Calibration Performance Monitoring PD mini review 11:00a 03:00p PDT 08:00a 12:00p HST Tuesday, April 20, 2010 Tele/Videoconference Conference...
AO System Design Effort (WBS 3.2 3.3), System Design Phase PDR Phase Opto Mechanical Design page Opto Mechanical Mini Design Review, Nov 2009 Management...
DAVINCI Mini Review Final Reviewer Report 743 Final Report on the NGAO DAVINCI Instrument Mini Design Review Agenda and Scope/Objectives DAVINCI Mini review...
Keck NGAO Cost Estimation Assignments Links Team Meeting #13 Estimator Template Workbooks (MS Excel) https://www.oir.caltech.edu/twiki oir/pub/Keck...
NGAO Alignment, Calibration, and Diagnostics mini review Questions and comments from Jim Lyke Responses from Peter in italics. KAON 719 Alignment Plan Sec....
Keck I Upgrade Architecture to NGAO Architecture Retreat Starting definitions https://www.oir.caltech.edu/twiki oir/pub/Keck/NGAO/KeckOne/NGAO architecture...
NGAO Observing Scenarios Information This page is used to summarize the work for the observing scenarios. The observing scenarios and example observations are used...
NGAO Document Templates Work Scope Planning Sheet.doc: Work Scope Planning Sheet template for NGAO tasks (11/29/06 revised). This planning sheet should...
NGAO Keck Adaptive Optics Notes Quick link to 2013 MSIP proposal page Complete List of Keck Adaptive Optics Notes KAON Summary by Category Technical...
Design Standards: 484 Optical Design Practices for NGAO Exporting Zemax as a STEP file: Zemax Export Screen Snapshot Zemax files can be imported to Solidworks...
This collection is for Opto Mechanical Graphics in support of design and interface control. Telescope: Note: WM Keck DSM team is working on a Solidworks 3D Model...
AO System Design Link to Opto Mechanical Mini Design Review 17, 2009 Opto Mechanical Design Meeting Minutes 21, 2009 5,2009 2, 2009...
This collection is for maintaining the Preliminary Design Phase Management Plan. Preliminary Design (PD) Phase Plan from System Design Review (SDR) Systems Engineering...
This collection is for maintaining the Systems Engineering Management Plan (SEMP) documentation for the PDR. Breakdown Structure (PBS) (2/26/10) Work...
This collection is for maintaining the Preliminary Design Phase Reports and tracked versions of the schedule. NGAO Project Schedules Tracked version of the Build...
PSF Reconstruction (PSF R) Project Scope: 1) Demonstrate NGS AO PSF Reconstruction with the Gemini Altair Keck AO systems (near term funded work). 2) Understand...
NGAO Proposal PeterWizinowich 09 Jun 2006
Near IR Tip Tilt Sensor Preliminary Design Review (PDR): Date: Monday, April 25, 2011 Time: 12:00pm 6:00pm PDT/ 9:00am 3:00pm HST Reviewers: Corinne...
NGAO Systems Architecture Excel spreadsheets for LOWFS pickoffs, nodding and dithering and k mirror versus instrumet field de rotators PeterWizinowich...
This collection is for producing the Systems Engineering Management Plan to be presented at the System Design Review. WBS 4.1.1 Work Breakdown Structure Task Definitions...
NGAO Proposal PeterWizinowich 09 Jun 2006
Split 20` Narrow field instruments / 120` d NIRI relay architecture to NGAO Architecture Retreat Starting definitions https://www.oir.caltech.edu/twiki oir...
NGAO System Architecture WBS 3.1.3 Work Package Schedule Subsystem Evaluation Criteria Form.xls. Please use this form when performing your subsystem evaluations...
This collection is for System Design Phase Planning and Tracking Documents EC Telecon Dial in Number 877 280 4645 with passcode 540030 (via WMKO) Systems Engineering...
Near IR Tip Tilt Sensor System Design Review (SDR): Date: Tuesday, December 7, 2010 Time: 10:30am 4:00pm HST / 12:30pm 6:00pm PST Reviewers: Corinne...
NGAO Proposal PeterWizinowich 09 Jun 2006
1 Project Scope: Enabling front page astronomical science by designing, building, and deploying the world`s most advanced astronomical adaptive optics instrumentation...
NGAO Proposal PeterWizinowich 09 Jun 2006
NGAO System Design Phase Work Packages Link to all NGAO KAON`s All Work Packages listed here require a Scope Planning Sheet, unless otherwise noted WBS Work...
Number of topics: 48

 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback