Tags:
create new tag
view all tags

Backlinks to WebHome in Keck/NGAO Web (Search all webs)

Results from Keck/NGAO web retrieved at 09:05 (GMT)

Keck NGAO Team Meeting #13 10:00a 4:15p PST 8:00a 2:15p HST Friday, January 25, 2008 Tele/Videoconference Dial in Number: 877 280 4645 Passcode: 540030...
Keck NGAO Team Meeting #14 10:00a 3:00p PST (Tentative) 8:00a 1:00p HST (Tentative) Tuesday, February 19, 2008 Tele/Videoconference Dial in Number: 877...
Keck NGAO PD Team Meeting #1 12:00p 3:00p PST 9:00a 12:00p HST Friday, June 13, 2008 Tele/Videoconference Dial in Number: 877 280 4645 Passcode: 540030 Videoconference...
Accessing the Contour requirements database Contour Requirements Database Certificate error is normal Click `Continue to this website`...
NGAO Controls Systems Home Page NGAO Background Information Multi Systems Command Sequencer (MCS) SW Architecture Work (KCSF) Control Systems Software Preliminary...
NGAO Performance Flowdown Worksheets A performance flowdown is the allocation of error terms to constituent subsystems or components Update (4/25/10): The performance...
NGAO Preliminary Design Phase Main.Jason Chin Originated 09 February 2009 Laser Guide Star Facility Preliminary Design Phase (WBS 3.5) and related summit activities...
NGAO Development Process Standards Posted below is some material that document the W. M. Keck Observatory Development Phases. The author of these documents is the...
NGAO Science Instrumentation This is the working area for NGAO science instrumentation development. It is access controlled as a private working area for the NGAO...
NGAO Team Meetings Collections PD Phase 090902 NGAO PD Meeting #8 (Tele/Video) 090527 NGAO PD Meeting #7 (Tele/Video) 090319 NGAO PD Meeting #6 (Tele...
1 This collection is for the NGAO Science Advisory Team SAT Members: Laird Close, George Djorgovski, Richard Ellis, James Graham, Michael Liu, Keith Matthews...
NGAO Keck Adaptive Optics Notes Quick link to 2013 MSIP proposal page Complete List of Keck Adaptive Optics Notes KAON Summary by Category Technical...
This collection is for maintaining the Preliminary Design Phase Management Plan. Preliminary Design (PD) Phase Plan from System Design Review (SDR) Systems Engineering...
This collection is for maintaining the Systems Engineering Management Plan (SEMP) documentation for the PDR. Breakdown Structure (PBS) (2/26/10) Work...
This collection is for maintaining the Preliminary Design Phase Reports and tracked versions of the schedule. NGAO Project Schedules Tracked version of the Build...
PSF Reconstruction (PSF R) Project Scope: 1) Demonstrate NGS AO PSF Reconstruction with the Gemini Altair Keck AO systems (near term funded work). 2) Understand...
NGWFC Parametric Oscillator for tip/tilt vibration reduction Project on hold as of Sept 9, 2010 Parametric Oscillator delayed for now.pdf: Chris` email regarding...
PD Phase Functional Requirements PD Requirements Review Phase II March 2010 Goals The NGAO project will finalize the System and Functional requirements over the...
NGAO Performance Budgets Working Groups (updated Aug 25, 2009) Performance Budget Team Membership Modelling Tools and Validation Dekany, Gavel, Neyman...
This collection is for supporting the development of a Plan for Phased Implementation and Descopes. 594 Plan to Address Phased Implementation and Descope Options...
NGAO Proposal PeterWizinowich 09 Jun 2006
NGAO Pre Project Proposal NGAO Proposal (225 pgs) NGAO Proposal Executive Summary (35 pgs)
Galactic Science This page may be used for sharing information by editing information on this page and/or attaching files. Pages and attachments are openly viewable...
NGAO Science Operations 0. Science Operations during the SD phase (up to April 2008) Follow link to access the Twiki page that presents the work studies performed...
Reduced Focal Anisoplanatism Error Demonstration at Keck Team Lead: Chris Neyman Scientific Team: Peter Wizinowich, Rich Dekany, Don Gavel, Brent Ellerbroek...
NGAO Systems Engineering Analysis Point and shoot study and Shoot Trade Study propagration in LGS tomography (KAON 621) and Shoot SPIE paper (KAON...
NGAO Systems Engineering Group Twiki Page A. Mini Design Reviews Actions Lists This list tracks outstanding action items from the PD phase NGAO mini reviews...
NGAO Wavefront Sensors Preliminary Design Phase Laser Guide Star (LGS) WFS Subsystem Consisting of the Fixed LGS asterism assembly and Patrolling LGS asterism assembly...
See also the faster 1
Statistics for Keck/NGAO Web Month: Topic views: Topic saves: File uploads: Most popular topic views: Top contributors for topic save...
See also the verbose 1 .
Number of topics: 33

 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback