Palomar LGS Test Plan Library
Please list your test plans by observing run, and add a link from the observing run page.
Test plan template:
doc,
pdf
April 23-27, 2007
April 2-6, 2007
- BTO Setup (v2.0): doc, pdf
- BTO alignment (v2.0): doc, pdf
- BTO Shutdown: doc, pdf
- NGS Checkout:
- Acquisition camera platescale calibration: doc, pdf
- AO system internal focus: doc, pdf
- AO bench setup and checkout: doc, pdf
- Laser Acquisition
- AO Optimization on the laser at zenith: doc, pdf
- LGS target acquisition
- LOWFS field curvature: doc
- LOWFS TT transfer curves: doc
- LOWFS focus transfer curve: doc
- Low-order loop optimization: doc, pdf
- LGS HO Optimization: doc
September 2006