Tags:
create new tag
view all tags

Recent Changes in Palomar/PalmLGS Web retrieved at 00:14 (GMT)

Palomar Automated Airspace Safety Systems Palomar`s multi tiered airspace safety system consists of an all sky visible camera (ASCAM), a narrow field mid infrared...
AO Cassegrain Cage Setup Wiring diagrams AO wiring diagram: DWG,PDF J. Hickey 6/22/06 Installation Documents AO bench setup and checkout: doc, Chopper...
December 12 13, 2005 NGS Engineering Run Test schedule: Test plans: Night logs: AntoninBouchez 12 May 2006
LGS Engineering Runs 2005 present 2005 2006 summary Semester 2005A June 30 July 6, 2005 August 17 20, 2005 Semester 2005B September 19 22, 2005...
May 18, 2008 NGS Engineering Goals While basic checkout and calibration of the NGS AO system were successfully accomplished on April 9, 2008, performance tests were...
% WDSORB: Computing orbits for epoch 2008.3815 WDS00057 4549 00 05 40.280 45 48 44.80 2000.0 vmag 8.98 v2mag 9.15 sep 5.949 pa 185.7 WDS00057 4549 00 05...
Ephemeris / WWW USER Sat May 17 19:17:45 2008 Pasadena, USA / Horizons Target...
April 9, 2008 NGS Engineering Goals The Palomar AO system has recently undergone a significant refurbishment. In the 4 months since November 29, 2007, we have:...
% WDSORB: Computing orbits for epoch 2008.2746 WDS00057 4549 00 05 40.280 45 48 44.80 2000.0 vmag 8.98 v2mag 9.15 sep 5.950 pa 185.7 WDS00057 4549 00 05...
August 23 25, 2007 LGS observing run Night logs and results 8/24/07 UT Photometric. Completed BTO setup for 1 hr. Measured LLT imaging performance (1.9` stars...
September 18 21, 2007 LGS observing run Night logs and results 9/19/07 UT Never opened due to high humidity and AO dynamic aperture device (DAD) failure. Laser...
October 22 27, 2007 LGS Observing Run Night logs and results 10/23/07 UT Observing cancelled due to fire danger and high winds. 10/24/07 UT Observing cancelled...
Solidworks Models of the LLT bench LLT FULL ASSEMBLY 18 Inch Diagnostics.EASM: Edrawings file of full LLT model H. Petrie, 2/25/08. Externally supplied SW part...
Zemax Models of the LLT bench Original models of LLT optical path by Chris Shelton (as designed): ZMX: telescope through the FSM, and a star camera. This has...
From C. Shelton, 06/02/06: Here`s a to do list, at least what I can remember. Is there anything else you can think of? Finish the `tasks left for next week` from...
Statistics for Palomar/PalmLGS Web Month: Topic views: Topic saves: File uploads: Most popular topic views: Top contributors for topic...
Beam Transfer Optics The beam transfer optics subsystem delivers the 589nm laser beam from the Coude lab to the laser launch telescope located behind the Hale telescope...
September 5 7, 2006 LGS Engineering Run Project schedules and task lists laser upgrade schedule LGS IPT meeting minutes, with task list JPL AO meeting...
Laser IPT Meeting Minutes Laser integrated produce team meetings are held Mondays 9:00 10:00am in 012 Robinson. The call in number is: 866 674 1191 x8203140....
PALMAO bench The PALMAO optical bench is placed onto the Cassegrain focus of the 200` Hale telescope. The system contains (1) the AO science instrument; (2) the deformable...

«Previous   1  2  3  4  5  6   Next»

Show 10, 20, 50, 100, 500, 1000 results per page, or show all.

Related topics: RSS feed, rounded corners RSS feed, ATOM feed, WebNotify, site changes, site map

Edit | Attach | Watch | Print version | History: r2 < r1 | Backlinks | Raw View | Raw edit | More topic actions
Topic revision: r2 - 2005-03-28 - TWikiContributor
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback