Set C Focus Testing Generated targets for set C using `071714 setC merged.xml` Copied Theta targets to: D:\PfsTests\Targets and deleted target files that...
Theta Tilt Testing Finished targets #11 and #12. Altered target files so that only targets 11 and 12 were present. Ran script with a loop of 2 targets to finish...
Switching to Set B Re cabled to Set B Connected to motors with NST pathway software to verify functionality and performed frequency sweep on all motors...
Performance Stability Analysis Moved slope files from data runs on 6/30 into the dropbox folder (Dropbox\PFS EM\TEST RESULTS\TargetConvergence\PerformanceStability...
THETA TILT TESTING Moved theta tilt target files to target directory and archived existing ones in Reviewed past convergence plots for best performing xml to use...
07 23 14 15 28 24 TargetRun Results PID 6 went crazy with the adj2 map WEEKEND PLAN Loaded the best performing map thus far, allMaps 072114 1 adj1, back...
07 22 14 14 41 38 TargetRun Analysis pid5 is improving, but still needs to get better (both theta and phi fwd look under damped, and both theta and phi rev look...
EM2 SN149 When this positioner was first cabled up as part of SET A, the driver was bad for phi and we were unable to command it properly. This was corrected...