Tags:
create new tag
view all tags

NGAO Science Operations

0. Science Operations during the SD phase (up to April 2008)

Follow this link to access the Twiki page that presents the work & studies performed during the System Design phase for NGAO science operations.

1. Science Operations during the PD phase (from May 2008 till 2010)

I start with more questions than answers for our planning. Here is a ppt file presenting my way to look at the process with many questions..

Certainly, the main activities for the Science Operations will be:

  • Develop the Observing Scenarios. This is a task under WBS 3.1.2 (Science Observing Planning and Execution). The Observing scenarios and the Use Cases are captured in the Operations Concept Document (which is a deliverable of WBS 3.2 (Requirements).
  • Develop the Operations Sequences Architecture (WBS 3.4.4) which are likely to be derived from the Use Cases in the OCD. I am not sure yet whether the Operations Sequences Architecture will be included in the OCD.
  • Develop the design for the Multi-system Command Sequencer (WBS 6.1) and User Interfaces (WBS 6.2), etc
Topic attachments
I Attachment History Action Size Date WhoSorted ascending Comment
PowerPointppt plan_my_work.ppt r1 manage 114.0 K 2008-08-18 - 18:53 UnknownUser  
Edit | Attach | Watch | Print version | History: r5 < r4 < r3 < r2 < r1 | Backlinks | Raw View | Raw edit | More topic actions
Topic revision: r5 - 2008-08-18 - DavidLeMignant
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback