NGAO Science Operations

0. Science Operations during the SD phase (up to April 2008)

Follow this link to access the Twiki page that presents the work & studies performed during the System Design phase for NGAO science operations.

1. Science Operations during the PD phase (from May 2008 till 2010)

I start with more questions than answers for our planning. Here is a ppt file presenting my way to look at the process with many questions..

Certainly, the main activities for the Science Operations will be:

  • Develop the Observing Scenarios. This is a task under WBS 3.1.2 (Science Observing Planning and Execution). The Observing scenarios and the Use Cases are captured in the Operations Concept Document (which is a deliverable of WBS 3.2 (Requirements).
  • Develop the Operations Sequences Architecture (WBS 3.4.4) which are likely to be derived from the Use Cases in the OCD. I am not sure yet whether the Operations Sequences Architecture will be included in the OCD.
  • Develop the design for the Multi-system Command Sequencer (WBS 6.1) and User Interfaces (WBS 6.2), etc

Topic attachments
I Attachment History Action Size Date Who Comment
PowerPointppt plan_my_work.ppt r1 manage 114.0 K 2008-08-18 - 18:53 UnknownUser  

This topic: Keck/NGAO > WebHome > ScienceOperations
Topic revision: r5 - 2008-08-18 - DavidLeMignant
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback