I | Attachment | History | Action | Size | Date | Who | Comment |
---|---|---|---|---|---|---|---|
JPG | 130801_ZTF_PSR_Documentation_Schedule.JPG | r1 | manage | 251.5 K | 2013-08-01 - 15:51 | RichardDekany | |
EASM | 1362-TM5183_INSTALLATION_ASSEMBLY-section_view.EASM | r1 | manage | 23950.3 K | 2013-08-16 - 17:04 | UnknownUser | Section View of entire model |
EASM | 1362-TM5183_INSTALLATION_ASSEMBLY.EASM | r1 | manage | 18197.1 K | 2013-08-16 - 17:05 | UnknownUser | CAD Model of installation assembly |
docx | 2013-08-14_TRICK_pre_ship_thermal_performance_v1.0.docx | r2 r1 | manage | 9172.1 K | 2013-08-14 - 21:34 | RogerSmith | Released for PSR. |
docx | KAON971_NIRTTS_PreShipReview_v0.12_JF.docx | r1 | manage | 6235.2 K | 2013-07-31 - 22:54 | JasonFucik | |
docx | KAON971_NIRTTS_PreShipReview_v0.2.docx | r1 | manage | 6202.7 K | 2013-08-01 - 04:16 | RichardDekany | |
docx | KAONXXX_NIRTTS_PreShipReview_v0.14_JC.docx | r1 | manage | 695.6 K | 2013-07-27 - 00:46 | UnknownUser | NIR TTS Pre-Ship Review Report, JC, version 0.14 |
docx | KAONXXX_NIRTTS_PreShipReview_v0_1.docx | r1 | manage | 687.9 K | 2013-01-23 - 19:04 | RichardDekany | Outline version (please scan for coming assignments) |
doc | KAONxxx_Keck_NIR_TTS_Dewar_Assembly.doc | r1 | manage | 1947.5 K | 2013-03-29 - 18:47 | DavidHale | NIRTTS Assembly and Alignment Procedures, draft version 0.1 |
docx | Keck_Adaptive_Optics_Note_XXX_cryo_cooler_assembly.docx | r1 | manage | 1349.5 K | 2013-08-19 - 23:49 | HectorRodriguez | Procedure complete. Needs to be revised. |
Mathcad_-_Shipping_analysis_for_TRICK.pdf | r1 | manage | 60.1 K | 2013-08-13 - 23:01 | HectorRodriguez | Shipping analysis | |
docx | Servicing_the_Filter_Wheel_Rev_1.docx | r1 | manage | 11504.7 K | 2013-08-14 - 00:51 | HectorRodriguez | Servicing the Filter Wheel Rev 1 (working document) |
docx | Shipping_NIRTTS.docx | r6 r5 r4 r3 r2 | manage | 121.4 K | 2013-08-15 - 22:03 | HectorRodriguez | Updated Shipping Specification. Added KAON1003 and updated document |
TRICK_PSR_Preparation_Schedule_v1_0.pdf | r1 | manage | 90.9 K | 2013-03-29 - 18:52 | DavidHale | PSR Preparation Schedule | |
TRICK_PSR_Preparation_Schedule_v2.pdf | r2 r1 | manage | 91.3 K | 2013-04-10 - 17:56 | RichardDekany | ||
docx | Woking_document_for_assembly_procedure.docx | r6 r5 r4 r3 r2 | manage | 11986.3 K | 2013-08-16 - 17:23 | HectorRodriguez | Updated version of assembly procedure. 100% complete. needs to be revised |