Backlinks to AcquisitionDesign in Keck/NGAO Web (Search all webs)
AO System Design Effort (WBS 3.2 3.3), System Design Phase PDR Phase Opto Mechanical Design page Opto Mechanical Mini Design Review, Nov 2009 Management...
NGAO Keck Adaptive Optics Notes Quick link to 2013 MSIP proposal page Complete List of Keck Adaptive Optics Notes KAON Summary by Category Technical...
NGAO Science Operations during the SD phase (approved by EC) WBS 3.4.1.2: Interfaces (approved to EC) WBS 3.4.2.1: Operations Architecture (updated on...
AO System Design Link to Opto Mechanical Mini Design Review 17, 2009 Opto Mechanical Design Meeting Minutes 21, 2009 5,2009 2, 2009...
NGAO System Design Phase Work Packages Link to all NGAO KAON`s All Work Packages listed here require a Scope Planning Sheet, unless otherwise noted WBS Work...
Number of topics: 5