Commissioning Plans
Outline:
Through a series of observing runs, characterize the instrument and develop and test the automated operation.
Current Major Items:
- Calibration Lamps: current system requires intensive human involvement (Don, Jeff)
- DRP wavelengths: achieve an acceptable wavelength solution and specify the calibration lamps required to achieve this (Don)
- RC photometry: develop photometry pipeline (Nadia)
- Instrument Control: achieve operational robustness (Richard Walters)
- Data Reduction: achieve operational robustness (Don, Nadia)
- Instrument Throughput: characterize both spectroscopic and photometric throughputs (Don, Nadia)
- Operational Efficiency: characterize procedures that will optimize target observing (Don, Nadia, Richard)
Commissioning Reports:
--
DonNeill - 19 Nov 2015