Commissioning Plans

Outline:

Through a series of observing runs, characterize the instrument and develop and test the automated operation.

Current Major Items:

  • Calibration Lamps: current system requires intensive human involvement (Don, Jeff)
  • DRP wavelengths: achieve an acceptable wavelength solution and specify the calibration lamps required to achieve this (Don)
  • RC photometry: develop photometry pipeline (Nadia)
  • Instrument Control: achieve operational robustness (Richard Walters)
  • Data Reduction: achieve operational robustness (Don, Nadia)
  • Instrument Throughput: characterize both spectroscopic and photometric throughputs (Don, Nadia)
  • Operational Efficiency: characterize procedures that will optimize target observing (Don, Nadia, Richard)

Commissioning Reports:

-- DonNeill - 19 Nov 2015

Topic attachments
I Attachment HistorySorted ascending Action Size Date Who Comment
Microsoft Word filedocx SEDMCommissioningReport01.docx r1 manage 155.9 K 2015-11-19 - 12:47 DonNeill SEDM Commissioning Report 01
Edit | Attach | Watch | Print version | History: r4 < r3 < r2 < r1 | Backlinks | Raw View | Raw edit | More topic actions...
Topic revision: r2 - 2015-11-19 - DonNeill
 
  • Edit
  • Attach
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback