Commissioning Plans

Line: 8 to 8
 

Current Major Items:

Changed:
<
<
  • Fix secondary vacuum system to improve pointing stability
  • Re-acquire pointing model data once secondary stabilized
>
>
  • Re-acquire pointing model data once secondary stabilized (should be done with SEDM RC)
 
  • Instrument Throughput: characterize both spectroscopic and photometric throughputs (Don, Nadia)
    • throughput now characterized with Standard stars.
  • Operational Efficiency: characterize procedures that will optimize target observing (Don, Nadia, Richard)
Line: 17 to 16
 

Completed Items:

Added:
>
>
  • Fix secondary vacuum system to improve pointing stability (Oct 13-17, 2016)
  • Re-acquire pointing model data once secondary stabilized (Done with testing camera, Oct 13-17, 2016)
 
  • IFU optics stabilized by clamp that replaces spring
  • Calibration Lamps: now fully automated
  • DRP wavelengths: calibrated using Xe, Cd, and Hg arc observations
 