NGAO Performance Flowdown Worksheets
A performance flowdown is the allocation of error terms to constituent subsystems or components
Performance Parameter |
Flowdown |
Owner |
Version |
Date |
PnS HOWFS transmission |
XLS |
Velur |
0.1 |
20 May 2009 |
Dither errors budget |
XLS |
Velur |
0.1 |
20 May 2009 |
LGS BTO transmission |
XLS |
Neyman |
0.1 |
20 May 2009 |
NCP long exposure |
XLS |
Velur |
0.1 |
20 May 2009 |
NCP non-sidereal |
XLS |
Velur |
0.1 |
20 May 2009 |
Pupil registration |
XLS |
Velur |
0.1 |
20 May 2009 |
RMS WFE of tomo. uplink |
XLS |
Neyman |
0.1 |
20 May 2009 |
uncorrectable LOWFS abs. |
XLS |
Velur |
0.1 |
20 May 2009 |
Controlled Flowdown Summary
We will post a 'version controlled' combined file of all flowdowns here (sometime after the 28 May team meeting)