Tags:
create new tag
view all tags

Backlinks to Eng_080615 in all Webs (Search Palomar/PalmLGS Web only)

Results from Palomar/PalmLGS web retrieved at 04:34 (GMT)

August 11 13, 2008 LGS observing run Night logs and results 8/12/08 UT Clear, seeing 0.8` in K. Aligned BTO, laser. Laser power 7.5 7.2 W. Canceled LGS operations...
September 15 22, 2008 LGS observing run Nightly Summaries 9/16/08 UT Scattered clouds, seeing 0.8` in K. Spent first half of the night on AO/PHARO/BTO setup after...
October 14 16, 2008 LGS observing run Nightly Summaries 10/15/08 UT Clear, seeing ~1.9` in V. Laser power 6.0 W. Attempted to diagnose BTO servo loop instability...
December 11 12, 2008 LGS observing run Nightly Summaries 12/12/08 UT Mostly cloudy, 1.0` seeing in R. Performed NGS observations with SWIFT most of night. Performance...
January 10 16, 2009 LGS observing run Nightly Summaries 1/11/09 UT (SWIFT LGS engineering) Clear and windy. Laser power 5.1 4.9 W. Seeing 4 6`. Opened for...
LGS Observing Runs 2008 2009 2005 2007 observing runs Semester 2008A April 9, 2008 NGS engineering May 18, 2008 NGS engineering June 15 21,...
Number of topics: 6

 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback