Tags:
create new tag
view all tags

Backlinks to SystemsEngineeringGroup in Keck/NGAO Web (Search all webs)

Results from Keck/NGAO web retrieved at 04:34 (GMT)

Keck NGAO Team Meeting #4 8:00a 5:30p (Hawaii Standard Time) Monday, January 22, 2007 Hualalai Conference Room, WMKO Headquarters, Waimea, HI Telecon attendees...
Keck NGAO PD Team Meeting #8 11:00a 01:00p PDT 08:00a 10:00a HST Wednesday, September 2, 2009 Tele/Videoconference Dial in Number: 877 280 4645 Passcode...
NGAO Controls Systems Home Page NGAO Background Information Multi Systems Command Sequencer (MCS) SW Architecture Work (KCSF) Control Systems Software Preliminary...
NGAO Performance Flowdown Worksheets A performance flowdown is the allocation of error terms to constituent subsystems or components Update (4/25/10): The performance...
NGAO Keck Adaptive Optics Notes Quick link to 2013 MSIP proposal page Complete List of Keck Adaptive Optics Notes KAON Summary by Category Technical...
PD Phase Functional Requirements PD Requirements Review Phase II March 2010 Goals The NGAO project will finalize the System and Functional requirements over the...
System Performance PD mini review 02:30p 06:30p PDT 11:30a 03:30p HST Thursday, May 13, 2010 Tele/Videoconference Conference Room direct #: TBD Videoconference...
1 Project Scope: Enabling front page astronomical science by designing, building, and deploying the world`s most advanced astronomical adaptive optics instrumentation...
Number of topics: 8

 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback