I | Attachment | History | Action | Size | Date | Who | Comment |
---|---|---|---|---|---|---|---|
xlsx | PFS_field_setup_timing.xlsx | r1 | manage | 41.7 K | 2012-10-16 - 22:16 | UnknownUser | A few different timing cases focusing on cobra movement and MC integration during move iterations |
PFS_sequence.pdf | r1 | manage | 114.4 K | 2012-10-23 - 18:25 | UnknownUser | High level description of critical timing events. Written in response to Shiang-Yu's 10/19/2012 msg to syseng group. | |
mpp | PFS_timing_PFICS_timing_xls.mpp | r2 r1 | manage | 474.5 K | 2012-12-01 - 00:28 | UnknownUser | An attempt to describe the timing model as a Gantt chart in MS Project. 1 second in the timing model is 1 day in the MS Project schedule |
mpp | PFS_timing_strobe.mpp | r1 | manage | 384.0 K | 2012-12-03 - 16:42 | UnknownUser | Proposed MCS timeline for strobed back illumination with 0.5 sec readout. Three image acquisitions are shown in the schedule, though it could be extended to an arbitrary number of cycles. |
mpp | PFS_timing_syseng127.mpp | r2 r1 | manage | 205.5 K | 2012-12-03 - 16:36 | UnknownUser | An attempt to model Naoyuki's proposed timing model as a Gantt chart. 1 second in the timing model is 1 minute in the MS Project schedule |
ppt | Setup_timing_model_description.ppt | r1 | manage | 856.5 K | 2012-10-16 - 22:25 | UnknownUser | This has a field-setup timing diagram (p3) and a description of PHM's matlab code that figures out observing efficiency vs. various timing parameters and models. |