June 12 14, 2006 LGS Engineering Run Pre run engineering work 6/5 6/6 BTO work schedule laser sched 060606.pdf: CSFL tasks for 6/06 LGS engineering run...
LGS Team Meetings Team meetings are held once per month, on 3:30pm 5:00pm on Thursdays in 023 Robinson on the Caltech campus. A video conference system is available...
PALM LGS High Order Wavefront Sensor AWFS Dynamic Aperture.doc: Two page summary of the Dynamic Aperture Device (Trash.Palomar PalmLGSDAD) RichardDekany...
January 5 7, 2007 LGS engineering run Safety documents Cleared by FAA for laser projection 18:00 05:45 PST. Spotters scheduled to be on site 20:00 06:...
December 6 8, 2006 LGS engineering run Schedules and calendars Dec. engineering run personnel schedule (v3) A. Bouchez 12/05/06 (v2) Safety documents...
August 2006 Laser Move from Coude to AO lab Laser move preparations Pictures taken at Palomar by VNV: JPG: ID of connector 0.155` (may need to be reamed...