Acquisition Cameras (WBS 3.2.3.7.1 WBS 3.2.3.7.2)

NGS Acquisition

  • Acquisition modes, operations and flowcharts
  • Working requirements
  • Photon budget
  • Optical & Mechanical
  • Algorithms
  • Technical risks

LGS Acquisition

  • Acquisition modes, operations and flowcharts
  • Working requirements
  • Photon budget
  • Optical & Mechanical
  • Algorithms
  • Technical risks
Topic attachments
I Attachment History Action Size Date Who Comment
Microsoft Word filedoc AcqOptInterface.doc r1 manage 96.0 K 2007-11-15 - 19:04 UnknownUser  
Microsoft Word filedoc ComparisonIRacq_VISacqV2.doc r1 manage 88.5 K 2008-01-22 - 22:30 UnknownUser Working notes for NGAO acquisition
Microsoft Excel Spreadsheetxls NGAO_AcqPhotonBudget.xls r1 manage 302.0 K 2007-11-16 - 01:31 UnknownUser  
Microsoft Word filedoc NGAO_acq_WBS_32371v2.doc r1 manage 67.0 K 2008-01-22 - 22:32 UnknownUser Draft plan for WBS report
Edit | Attach | Watch | Print version | History: r16 | r10 < r9 < r8 < r7 | Backlinks | Raw View | Raw edit | More topic actions...
Topic revision: r8 - 2008-01-22 - DavidLeMignant
 
  • Edit
  • Attach
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2025 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback