Acquisition Cameras (WBS 3.2.3.7.1 WBS 3.2.3.7.2)

NGS Acquisition

  • Acquistion modes, operations and flowcharts
  • Working requirements
  • Photon budget
  • Optical & Mechanical
  • Algorithms
  • Technical risks

LGS Acquisition

  • Acquistion modes, operations and flowcharts
  • Working requirements
  • Photon budget
  • Optical & Mechanical
  • Algorithms
  • Technical risks

-- ChrisNeyman - 07 Nov 2007

Topic attachments
I Attachment History Action Size Date Who Comment
Microsoft Word filedoc AcqOptInterface.doc r1 manage 96.0 K 2007-11-15 - 19:04 UnknownUser  
Microsoft Excel Spreadsheetxls NGAO_AcqPhotonBudget.xls r1 manage 302.0 K 2007-11-16 - 01:31 UnknownUser  

This topic: Keck/NGAO > AcquisitionDesign
Topic revision: r6 - 2007-11-16 - ChrisNeyman
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2025 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback