Dial-in Number: 877-280-4645 Passcode: 540030
Thursday Videoconference IP: 128.171.99.69 (Kamuela CR 881-3533)
Friday Videoconference IP: 128.171.99.75 (Mauna Loa CR 881-3679)


*In person: Adkins, Dekany, Gavel, Le Mignant, Max, McGrath, Wizinowich
*In effigie (e.g. on the phone or video): Johansson

Links:

  • TBD

Goals:

  • Agree on draft success criteria for Internal Review of Build to Cost concept
  • Identify draft core science and observatory requirements (the core requirements that provides sufficient science return to be worth the dollars)
  • Identify the base NGAO system, including science instruments, to address the core science requirements
  • Agree on the tasks and schedule leading up to the internal Build to Cost concept review.

Draft Agenda (Thursday): Note: Each section should include discussion time.

  • 9:00 am. Meeting goals and agenda (Wizinowich) Presentation AO papers
  • 9:10 am. Review build to cost guidelines, implications & proposed path forward (Wizinowich)
  • 9:45 am. What are the core science requirements? (Max, McGrath) * Claire's talk
  • 11:00 am. Break
  • 11:15 am. What requirements significantly drive NGAO system cost? (Dekany)
  • 12:15 pm. Lunch
  • 1:00 pm. Review current NGAO system cost estimate in then-year dollars (Dekany)
  • 2:00 pm. Major NGAO system cost savings ideas (Gavel) viewgraphs
  • 3:00 pm. Break
  • 3:15 pm. What are the core science instrument requirements? (Adkins) Instrumentation Overview
  • 4:00 pm. What requirements significantly drive science instrument costs? (Adkins) Instrumentation Cost Drivers
  • 4:30 pm. Review current science instrument cost estimates in then-year dollars (Adkins)
  • 5:00 pm. Major science instrument cost savings ideas (Adkins)
  • 5:30 pm. General Discussion (Wizinowich)
  • 5:45 pm. Day 1 summary & actions (Wizinowich)
  • 6:00 pm. End

Draft Agenda (Friday):

  • 9:00 am. Major management & systems engineering ideas for reducing costs? (Wizinowich) Presentation
  • 9:30 am. What requirement changes should we proceed with? (Dekany)
  • 10:30 am. Break
  • 10:45 pm. What design changes should we proceed with? (Gavel)
  • 12:00 pm. Lunch
  • 1:00 pm. NFIRAOS cost comparison path forward - success criteria + tasks/schedule leading to report (Dekany)
  • 1:30 pm. Build to Cost Concept Review path forward - success criteria + tasks/schedule leading to review (Wizinowich)
  • 2:00 pm. General discussion of B2C.
  • 2:45 pm. Break followed by other planning topics
  • 3:00 pm. What should we propose to ATI? (Wizinowich) Presentation
  • 3:30 pm. How can we move forward with science instrument designs? (Adkins)Instrumentation Plan FY09
  • 4:00 pm. Major changes to PD plan (Wizinowich)
  • 4:30 pm. Meeting summary & actions (Wizinowich)
  • 5:00 pm. End

Topic attachments
I Attachment History Action Size Date Who Comment
PowerPointppt 080911_NGAO_PD_Team_Meeting_3.ppt r1 manage 397.0 K 2008-09-11 - 20:29 RichardDekany  
PowerPointppt AO_papers.ppt r1 manage 569.0 K 2008-09-11 - 15:54 PeterWizinowich  
Microsoft Word filedoc B2C_meeting_summary.doc r3 r2 r1 manage 44.5 K 2008-09-13 - 01:14 PeterWizinowich  
PowerPointppt B2C_team_meeting.ppt r3 r2 r1 manage 227.0 K 2008-09-11 - 15:53 PeterWizinowich  
PowerPointppt B2C_team_meeting_ATI.ppt r1 manage 201.5 K 2008-09-11 - 15:54 PeterWizinowich  
PowerPointppt B2C_team_meeting_Gavel.ppt r1 manage 313.5 K 2008-09-11 - 06:00 UnknownUser Gavel viewgraphs
PowerPointppt B2C_team_meeting_mgmt_cost_ideas.ppt r1 manage 210.0 K 2008-09-11 - 15:53 PeterWizinowich  
PowerPointppt CoreScienceRequirements_v3.ppt r1 manage 274.0 K 2008-09-11 - 04:46 UnknownUser  
PowerPointppt Instrumentation_Cost_Drivers_September_2008.ppt r1 manage 229.0 K 2008-09-11 - 23:23 UnknownUser  
PowerPointppt Instrumentation_Overview_September_2008.ppt r3 r2 r1 manage 899.5 K 2008-09-12 - 16:06 UnknownUser  
PowerPointppt Instrumentation_Planning_September_2008_v2.ppt r1 manage 437.5 K 2008-09-12 - 21:14 UnknownUser  
Edit | Attach | Watch | Print version | History: r24 < r23 < r22 < r21 < r20 | Backlinks | Raw View | Raw edit | More topic actions
Topic revision: r24 - 2008-12-11 - PeterWizinowich
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback