January 5-7, 2010 LGS-SWIFT observing run
Nightly Summaries
1/06/10 UT
Laser power 6.5-7.3 W. Closed until 22:00 due to ash. Attempted LGS for 1.5hrs; gave up due to cirrus. Non-AO SWIFT obs. 23:30-XXX.
1/07/10 UT
1/08/10 UT
Safety Documents
- Laser projection schedule (FAA letter of non-objection)
- 1/05/10, 17:52:00 - 1/6/09, 05:54:00 PST
- 1/06/10, 17:52:00 - 1/7/09, 05:54:00 PST
- 1/07/10, 17:53:00 - 1/8/09, 05:54:00 PST
- Securitas spotters are schedule to be on site 17:00-06:30 PST (16:45-06:30 PST on 1/5/10)
- US-STRATCOM documents (LCH contact information)
Personnel schedule
|
Tue 1/5 |
Wed 1/6 |
Thu 1/7 |
Bouchez |
X |
X |
X |
Peffer |
X |
X |
X |
Velur |
X |
|
|
Test Plans and Procedures
Please post your test plans on the
Test Plan Library page, and add a link below.
- AO setup
- AO system internal focus: doc, pdf
- AO bench setup and checkout: doc, pdf
- BTO procedures
- BTO setup (v2.6): doc, pdf
- BTO alignment (v2.4): doc, pdf
- BTO alignment, abbreviated version (v1.0): doc, pdf
- BTO shutdown (v1.1): doc, pdf
- Laser procedures
- Laser startup (v2.1): doc, pdf
- Laser shutdown (v1.0): doc, pdf
- Observing procedures:
- LGS science night checklist (v1.1): doc, pdf
- NGS Checkout (v3.1): doc, pdf
- LGS Checkout (v1.0): doc, pdf
- LGS SWIFT target acquisition (v1.0): doc, pdf
--