May 18, 2008 NGS Engineering

Goals

While basic checkout and calibration of the NGS-AO system were successfully accomplished on April 9, 2008, performance tests were not possible due to clouds and poor seeing. The primary goal of this additional NGS engineering night is to complete the performance characterization of the NGS-AO system after the winter 07/08 optical bench relayout. A secondary goal is the testing of a new iterative reconstructor by L. Lessard and D. MacMynowski.

Personnel schedule

Planning to be present on 5/18/08: Bouchez, Lessard, Roberts, MacMynowski.

Procedures and test plans

Please post your test plans on the Test Plan Library page, and add a link below.

Results

Edit | Attach | Watch | Print version | History: r5 < r4 < r3 < r2 < r1 | Backlinks | Raw View | Raw edit | More topic actions...
Topic revision: r4 - 2008-05-18 - AntoninBouchez
 
  • Edit
  • Attach
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback