April 9, 2008 NGS Engineering

Goals

The Palomar AO system has recently undergone a significant refurbishment. In the 4 months since November 29, 2007, we have:
  • Recoated the AO relay flats and OAPs, and repolished and recoated the DM.
  • Realigned the AO relay to provide a focus suitable for P1640 and SWIFT.
  • Mounted FM3 on a removable kinematic base.
  • Modified the PHARO mounting cradle to move PHARO forward 3.5".
  • Modified the AO enclosure and added a PHARO FM3 enclosure.
  • Installed a new AO stimulus, with 594nm laser source.
  • Installed a new motor controller for Aerotech stages.
The purpose of this engineering night is to demonstrate the readiness of the refurbished system for NGS-AO science, and to characterize its performance.

Personnel and engineering schedules

Planning to be present: Baranec, Bouchez, Burruss, Roberts.
Engineering schedules:

Procedures and test plans

Please post your test plans on the Test Plan Library page, and add a link below.
  • Daytime tests
    • AO bench setup and checkout - J. Roberts
    • PHARO pupil motion - A. Bouchez.
    • Stimulus flexure - R. Burruss.
  • Nighttime tests
    • SSM motion and pupil registration.
    • Closed-loop performance.
    • Throughput.
    • Platescale (PHARO, ACAM, LOWFS)
    • Field distortion
    • Flexure
Edit | Attach | Watch | Print version | History: r10 | r4 < r3 < r2 < r1 | Backlinks | Raw View | Raw edit | More topic actions...
Topic revision: r2 - 2008-04-04 - AntoninBouchez
 
  • Edit
  • Attach
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback