April 9, 2008 NGS Engineering
Goals
The Palomar AO system has recently undergone a significant refurbishment. In the 4 months since November 29, 2007, we have:
- Recoated the AO relay flats and OAPs, and repolished and recoated the DM.
- Realigned the AO relay to provide a focus suitable for P1640 and SWIFT.
- Mounted FM3 on a removable kinematic base.
- Modified the PHARO mounting cradle to move PHARO forward 3.5".
- Modified the AO enclosure and added a PHARO FM3 enclosure.
- Installed a new AO stimulus, with 594nm laser source.
- Installed a new motor controller for Aerotech stages.
The purpose of this engineering night is to demonstrate the readiness of the refurbished system for NGS-AO science, and to characterize its performance.
Personnel and engineering schedules
Planning to be present: Baranec, Bouchez, Burruss, Roberts.
Engineering schedules:
Procedures and test plans
Please post your test plans on the
Test Plan Library page, and add a link below.
- Daytime tests
- AO bench setup and checkout - J. Roberts
- PHARO pupil motion - A. Bouchez.
- Stimulus flexure - R. Burruss.
- Nighttime tests
- SSM motion and pupil registration.
- Closed-loop performance.
- Throughput.
- Platescale (PHARO, ACAM, LOWFS)
- Field distortion
- Flexure