| # | Title | Format | Owner | Status | Ver. | Date |
|---|---|---|---|---|---|---|
| 601 | Caltech-TMT IRMOS Feasibility Study Report | K. Taylor | Released | 7.1 | 2/28/06 | |
| 602 | An Integrated UV/Optical/NIR Approach to TMT Instrumentation | .doc | R. Dekany | Released | 1.0 | 4/25/06 |
| 603 | Palomar: PALAO Interface Control Document | A. Moore | Draft | 2.0 | 7/7/06 | |
| 604 | OIWFS Development for TMT | .doc | R. Dekany | Released | 1.0 | 5/8/06 |
| 605 | Palomar LGS flux | A. Bouchez | Released | 2.1 | 7/27/06 | |
| 606 | Palomar BTO transmission | A. Bouchez | Released | 2.0 | 8/7/06 | |
| 607 | Palomar: Trial run of SWIFT installation |
A. Moore | Released | 1.0 | 8/2/06 | |
| 608 | Palomar: PALAO optical beam heights | A. Moore | Released | 1.0 | 8/2/06 | |
| 609 | Palomar Laser Diagnostics Requirements | A. Bouchez | draft | 1.0 | 8/7/06 | |
| 610 | PALM-3000 telemetry requirements | A. Bouchez | draft | 1.0 | 8/11/06 | |
| 611 | OIR Project Scope Statement Template | .doc | R. Dekany | Released | 1.0 | 9/29/06 |
| 612 | PALM-3000 Science Requirements Document (SRD) | .doc | R. Dekany | Released | 1.01 | 3/17/06 |
| 613 | BTO Off-zenith Calibration |
A. Bouchez | Released | 1.0 | 10/30/06 | |
| 614 | P3k Scintillation Notes | M. Britton | Released | 1.0 | 12/05/06 | |
| 615 | P3K Conjugate Height Selection | R. Dekany | Released | 1.0 | 01/26/07 | |
| 616 | PALM-LGS non-common path flexure |
A. Bouchez | released | 2.0 | 3/21/07 | |
| 617 | Laser Automation Computer Requirements |
A. Bouchez | released | 1.1 | 3/12/07 | |
| 618 | Astrometric Considerations for PALM-3000 Woofer/Tweeter Configuration | .xxx | V. Velur | |||
| 619 | Palomar LLT flexure |
A. Bouchez | released | 1.0 | 4/20/07 | |
| 620 | PALM-3000 IRTT Dichroic Optimization |
R. Dekany | draft | 0.3 | 6/6/07 | |
| 621 | LOWFS Dark Current |
A. Bouchez | released | 1.0 | 6/8/07 | |
| 622 | PALM-3000 optical configuration study |
A. Bouchez | released | 1.0 | 7/15/07 | |
| 623 | PALM-3000 observing scenarios |
A. Bouchez | released | 1.0 | 7/16/07 | |
| 624 | PALM-3000 Instrument Requirements Document |
R. Dekany | draft | 0.6 | 7/17/07 | |
| 625 | Capability Summary for the 5-meter Hale Telescope | R. Dekany | released | 1.0 | 7/27/07 | |
| 626 | PALM-3000 Error Budget Summary (EBS) |
R. Dekany | draft | 0.3 | 11/9/07 | |
| 627 | PALM-3000 Project Management Plan (PMP) |
A. Bouchez | released | 1.1 | 11/9/07 | |
| 628 | PALM-3000 Software Requirements Document (SwRD) |
A. Bouchez | draft | 0.4 | 12/3/07 | |
| 629 | PALM-3000 Instrument Architecture Document (IAD) |
A. Bouchez | draft | 0.4 | 11/11/07 | |
| 630 | available |
| I | Attachment | History | Action | Size | Date | Who | Comment |
|---|---|---|---|---|---|---|---|
| |
080201_Faculty_Retreat.ppt | r2 r1 | manage | 21.5 K | 2008-02-02 - 22:36 | RichardDekany | |
| |
Beichman_OIRRetreat.ppt | r2 r1 | manage | 19.5 K | 2008-02-02 - 22:36 | RichardDekany | |
| |
Palomar_ReSTAR.pdf | r1 | manage | 51.7 K | 2007-07-28 - 00:00 | RichardDekany | |
| |
report.pdf | r1 | manage | 89.3 K | 2006-12-05 - 21:49 | UnknownUser | p3k scintillation notes |