---++System Performance PD mini-review ---++++++02:30p - 06:30p PDT ---++++++11:30a - 03:30p HST ---++++++Thursday, May 13, 2010 ---++++++Tele/Videoconference Conference Room direct #: TBD<br> Videoconference IP: TBD <br> Dial-in #: 877-280-4645 Passcode: 540030 <br> --- |In propria persona:| | |In effigie (e.g. on the phone or video):| Sean Adkins, Richard Dekany, *Don Gavel*, *Claire Max*, Liz !McGrath, *Chris Neyman*, Peter Wizinowich | Minutes and *Action Items*: _To be posted here_ ---++++Mini-review Goals (_proposed_) * Review changes to performance predictions for NGAO in light of refinement of both science cases and engineering tools since August 2009. * _Evaluate overall compliance with NGAO Systems Requirements, and assess the maturity of flowdown traceability_ * _Identify areas worth developing in more detail for PDR, including potential rescope / incremental upgrade strategies_ ---++++Useful links * [[https://www2.keck.hawaii.edu:8443/contour/perspective.req][NGAO Contour]] * [[ConfigControl][NGAO Configuration Controlled Documents]] ---++++KAON 716 Wavefront Error Performance Summary Document * Version 0.9 [[%ATTACHURL%/KAON_716_DRAFT_Preliminary_Design_Phase_Performance_Budgets_v0_9.docx][.docx]] [[%ATTACHURL%/KAON_716_DRAFT_Preliminary_Design_Phase_Performance_Budgets_v0_9.pdf][.pdf]] * Version 1.0 (new 1p PDT 5/12/10) [[%ATTACHURL%/KAON_716_DRAFT_Preliminary_Design_Phase_Performance_Budgets_v1_0.docx][.docx]] [[%ATTACHURL%/KAON_716_DRAFT_Preliminary_Design_Phase_Performance_Budgets_v1_0.pdf][.pdf]] ---++++Presentations Agenda - All times PST ---+++++Proposed * 02:30 PM Overview (Dekany) Presentation: [[%ATTACHURL%/100513_Performance_Budgets_v0_6_2003_Format.pdf][.pdf]] [[%ATTACHURL%/100513_Performance_Budgets_v0_6_2003_Format.ppt][.ppt]] * 03:30 PM Discussion of Reviewer Questions (All) * 05:00 PM General Discussion (All) * 06:00 PM Adjourn ---+++++Original * 02:30 PM Overview (Dekany) Presentation: [[%ATTACHURL%/100513_Performance_Budgets_v0_6_2003_Format.pdf][.pdf]] [[%ATTACHURL%/100513_Performance_Budgets_v0_6_2003_Format.ppt][.ppt]] * 03:10 PM Science Case Performances (Dekany) * 03:50 PM System Compliance (Dekany) [[%ATTACHURL%/ErrorBudget_CompliancePacket_100406.xls][Compliance Matrix]] * 04:00 PM Trade Study Results (Dekany) * Includes sensitivities to laser power and seeing * _Need input from SM + !SysE on interesting and affordable trade studies to include_ * _Should this include discussions of incremental upgrade performance for Keck 1 AO?_ * _Should we prepare any specific rescope performance options for PDR?_ * 04:45 PM Break * 05:00 PM General Discussion * 05:30 PM Review Committee Discussion * 06:05 PM Debrief and Recommendations * 06:30 PM Adjourn * [[%ATTACHURL%/KAON_716_DRAFT_Preliminary_Design_Phase_Performance_Budgets_v1_0.pdf][KAON_716_DRAFT_Preliminary_Design_Phase_Performance_Budgets_v1_0.pdf]]: KAON_716_DRAFT_Preliminary_Design_Phase_Performance_Budgets_v1_0.pdf * [[%ATTACHURL%/KAON_716_DRAFT_Preliminary_Design_Phase_Performance_Budgets_v1_0.docx][KAON_716_DRAFT_Preliminary_Design_Phase_Performance_Budgets_v1_0.docx]]: KAON_716_DRAFT_Preliminary_Design_Phase_Performance_Budgets_v1_0.docx
Attachments
Attachments
Topic attachments
I
Attachment
History
Action
Size
Date
Who
Comment
pdf
100513_Performance_Budgets_v0_5_2003_Format.pdf
r1
manage
349.8 K
2010-05-12 - 00:41
RichardDekany
ppt
100513_Performance_Budgets_v0_5_2003_Format.ppt
r1
manage
925.0 K
2010-05-12 - 00:41
RichardDekany
pdf
100513_Performance_Budgets_v0_6_2003_Format.pdf
r2
r1
manage
349.8 K
2010-05-13 - 20:12
RichardDekany
ppt
100513_Performance_Budgets_v0_6_2003_Format.ppt
r1
manage
939.5 K
2010-05-13 - 20:09
RichardDekany
xls
ErrorBudget_CompliancePacket_100406.xls
r2
r1
manage
122.0 K
2010-04-07 - 06:08
RichardDekany
pdf
KAON_716_DRAFT_2.pdf
r1
manage
459.4 K
2010-04-07 - 06:45
RichardDekany
docx
KAON_716_DRAFT_Preliminary_Design_Phase_Performance_Budgets.docx
r1
manage
510.3 K
2010-04-07 - 06:45
RichardDekany
docx
KAON_716_DRAFT_Preliminary_Design_Phase_Performance_Budgets_v0_9.docx
r1
manage
1237.7 K
2010-05-07 - 23:52
RichardDekany
pdf
KAON_716_DRAFT_Preliminary_Design_Phase_Performance_Budgets_v0_9.pdf
r1
manage
1026.5 K
2010-05-07 - 23:52
RichardDekany
docx
KAON_716_DRAFT_Preliminary_Design_Phase_Performance_Budgets_v1_0.docx
r2
r1
manage
1607.4 K
2010-05-13 - 20:05
RichardDekany
pdf
KAON_716_DRAFT_Preliminary_Design_Phase_Performance_Budgets_v1_0.pdf
r2
r1
manage
1185.0 K
2010-05-13 - 20:05
RichardDekany
pdf
Performance_Summary_(draft)_[Compatibility_Mode].pdf
r1
manage
68.0 K
2010-04-08 - 20:58
RichardDekany
This topic: Keck/NGAO
>
WebHome
>
SystemsEngineeringGroup
>
SysEngMtgs_23
Topic revision: r9 - 2010-05-13 - RichardDekany
Copyright © 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki?
Send feedback